Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹77,308Admitted-Finance | ₹77,308 | L1 | Admitted-Finance |
| 2 | L2₹77,632+₹324 (0.42%)Admitted-Finance | ₹77,632+₹324 (0.42%) | L2 | Admitted-Finance |
| 3 | L3₹79,727+₹2,419 (3.13%)Admitted-Finance | ₹79,727+₹2,419 (3.13%) | L3 | Admitted-Finance |
| 4 | L4₹81,385+₹4,077 (5.27%)Admitted-Finance | ₹81,385+₹4,077 (5.27%) | L4 | Admitted-Finance |
| 5 | L5₹88,754+₹11,446 (14.8%)Admitted-Finance | ₹88,754+₹11,446 (14.8%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | GHEETHAM CONSTRAUCTION L3 | NIHAAL CONSTRUCTIONS L1 | SARAVANAN T L4 | P Sivanantham L2 | S CHANDRASEKAR L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00Name of the Work :Providing EPL work at Kavalkaranpatty Road to Bharathi Nagar East OHT End H/O Vadaseri (250M) | ||||||||
| 2.00 | Supply and cost of 63mm dia 6 KSC PVC pipe with ISI mark etc complete | 250 | M | 62 ₹15,500 Lowest | 79 ₹19,750 | 83 ₹20,750 | 79 ₹19,750 | 90 ₹22,500 |
| 3.00 | Earth work excavation for in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary etc complete complying with standard specification. SS20B | 135 | M3 | 280 ₹37,800 | 256 ₹34,560 Lowest | 270 ₹36,450 | 258 ₹34,830 | 295 ₹39,825 |
| 4.00 | Laying and jointig of P.V.C and G.I pipe into the trench with proper grading and alignment and all labour charges etc,,complete | 250 | M | 20 ₹5,000 Lowest | 21 ₹5,250 | 22 ₹5,500 | 21 ₹5,250 | 24 ₹6,000 |
| 5.00 | Refilling the Pipe line trench with excavated earth other than sand complying the Standard specification etc,,complete | 135 | M3 | 39 ₹5,265 | 38 ₹5,130 Lowest | 40 ₹5,400 | 38 ₹5,130 Lowest | 44 ₹5,940 |
| 6.00 | Provision for Name board | 1 | Nos | 4,000 ₹4,000 | 825 ₹825 Lowest | 870 ₹870 | 830 ₹830 | 950 ₹950 |
| 7.00 | GST Amount for providing Service to Government Contract Works for the above ConstructionWorks. GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | 1 | GST Amount | 12,162 ₹12,162 | 11,793 ₹11,793 Lowest | 12,415 ₹12,415 | 11,842 ₹11,842 | 13,539 ₹13,539 |
Tender Value
Refer Docs
Closing Date
11 Sept 2026, 3:00 pmClosed
Block Development Officer (VP)
Block Development Officer (VP), Thogaimalai
Providing EPL work at Kavalkaranpatty Road to Bharathi Nagar East OHT End (250M) in Vadaseri Panchayat in Thogaimalai Block in Karur District
2026_RDTN_699000_1
Karur District Thogaimalai Block Vadaseri Panchayath EPL Work at Bharathi Nagar OHT
Open Tender
Civil Works - Others
Item Wise
30 days
Thogaimalai Panchayat Union
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Yes
11 Sept 2026
28 Aug 2026
11 Sept 2026
28 Aug 2026
11 Sept 2026
28 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Name of the Work :Providing EPL work at Kavalkaranpatty Road to Bharathi Nagar East OHT End H/O Vadaseri (250M) | - | - | - | - |
| 2 | Supply and cost of 63mm dia 6 KSC PVC pipe with ISI mark etc complete | - | M | - | - |
| 3 | Earth work excavation for in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary etc complete complying with standard specification. SS20B | - | M3 | - | - |
| 4 | Laying and jointig of P.V.C and G.I pipe into the trench with proper grading and alignment and all labour charges etc,,complete | - | M | - | - |
| 5 | Refilling the Pipe line trench with excavated earth other than sand complying the Standard specification etc,,complete | - | M3 | - | - |
| 6 | Provision for Name board | - | Nos | - | - |
| 7 | GST Amount for providing Service to Government Contract Works for the above ConstructionWorks. GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | - | GST Amount | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.33 MB
technicalpit.pdf
Tender Documents • 1.01 MB
BOQ_840247.xls
BOQ • 0.58 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .