Loading…
Loading…
Tender Value
₹9.4 L
EMD Value
₹11,800
Closing Date
15 Sept 2026, 5:00 pm3d left
Dr. Sunny Rao
Office of the Project Officer,WJ Area
Dismantle,Transportation and Installation of Pony belt driveheads from D19 BG,10th DR Jn. to D20 B/G,9th DR jn etc in XVI(T) seam at Moonidih Colliery, W.J. Area
2026_BCCL_364665_1
BCCL/WJA/MND/SUR/2026-27/02
Open Tender
Miscellaneous Works
Percentage
35 days
Moonidih Colliery, WJ Area
Please refer to NIT
11 documents required · 11 mandatory
₹11,800
15 Sept 2026
1 Sept 2026
18 Sept 2026
1 Sept 2026
15 Sept 2026
1 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Dismantle,Transportation & Installation of Pony belt driveheads from D-19 B/G,10th D/R Jn. to D-20 B/G,9th D/R jn etc in XVI(T) seam at Moonidih Colliery, W.J. Area | |||||
| 1.01 | Dismantalling of Pony drive head at D-19 B/G,10th D/R Jn. required shift 2 Analysis: Manshift required = 8 unskilled manshift/shift Cost/shift= 8*1437.6 =Rs11500.8/shift | 2 | shifts | 11,500.8 | ₹23,001.6 |
| 1.02 | Manual Transportation of jib drum,gear box,motor of pony drivehead from D-19 B/G,10th D/R Jn. to D-20 B/G,9th D/R jn. i.e.(Total Distance=230m) Analysis: 10 unskilled manshift required for manual transportation of one item/60m = Cost/mt/item= 10*1437.6 /60 =Rs.239.60/mt/item Total items=3 no.;Therefore cost/mt=(Rs 239.6 *3)=Rs 718.8/mt | 230 | meter | 718.8 | ₹1,65,324 |
| 1.03 | Manual Transportation of Drive frames of pony drivehead from D-19 B/G,10th D/R Jn. to D-20 B/G,9th D/R jn. i.e.(Total Distance=230m) required shift 2 Analysis: Manshift required for manual transportation of pony frames =8 unskilled manshift/shift Cost/shift= 8*1437.6 =Rs11500.8/shift | 2 | shifts | 11,500.8 | ₹23,001.6 |
| 1.04 | Manual Transportation of starter and starting cable of pony drivehead from D-19 B/G,10th D/R Jn. to D-20 B/G,9th D/R jn. i.e.(Total Distance=230m) required shift 2 Analysis: Manshift required for transportation of starter =8 unskilled manshift/shift Cost/shift= 8*1437.6 =Rs11500.8/shift | 2 | shifts | 11,500.8 | ₹23,001.6 |
| 1.05 | Installation of Pony Drivehead at D-20 B/G,9th D/R jn. required shift 4 Analysis: Unskilled manshift required/shift=8 cost/shift=8*1437.6 =Rs11500.8/shift | 4 | shift | 11,500.8 | ₹46,003.2 |
| 1.06 | Dismantalling of TATA belt drive head at D-19 T/G,10th D/R Jn. required shift 4 Analysis: Manshift required = 8 unskilled manshift/shift Cost/shift= 8*1437.6 =Rs11500.8/shift | 4 | shifts | 11,500.8 | ₹46,003.2 |
| 1.07 | Manual Transportation of base frame of Tata belt drive head from D-19 T/G,10th D/R jn. To D-20 B/G,10th D/R Jn.(distance=70m) required shift 2 Analysis:unskilled manshift Reqired/shift= 8 unskilled Analysis: Manshift required = 8 unskilled manshift/shift Cost/shift= 8*1437.6 =Rs11500.8/shift | 2 | shifts | 11,500.8 | ₹23,001.6 |
| 1.08 | Manual Transportation of 3 no. of drums(2 drive driven drums,1 discharge drum)of Tata belt drive head fromD-19 T/G,10th D/R jn. To D-20 B/G,10th D/R Jn.(distance=70m) required shift 3 Analysis: 10 unskilled manshift Reqired/shift= Cost/shift= 10*1437.6 =Rs14376/shift | 3 | shift | 14,376 | ₹43,128 |
| 1.09 | Manual Transportation of gear box of Tata belt drive head from D-19 T/G,10th D/R jn. To D-20 B/G,10th D/R Jn.(distance=70m) required shift 1 Analysis 10 unskilled manshift Reqired/shift= Cost/shift= 10*1437.6 =Rs14376/shift | 1 | shifts | 14,376 | ₹14,376 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.60 MB
BOQ_377583.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .