| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.8 LAccepted-AOC | ₹9.8 L | L1 | Accepted-AOC Accept |
| 2 | L2₹9.9 LRejected-Finance | ₹9.9 L | L2 | Rejected-Finance Reject |
| Sl No | Description | Qty | Unit | K.Velusamy L2 | MALAYALAN S L1 |
|---|---|---|---|---|---|
| 1.00Name of the Work : Construction of Multi Purpouse complex Building @ Manavasi AD Street H/O Manavasi Panchayat | |||||
| 2.00 | Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification | 15.71 | m3 | 247.12 ₹3,882.26 | 246.12 ₹3,866.55 |
| 3.00 | Cement concrete 1:4:8 mix using 40mm iss HBG metal for foundation & flooring including labour charges etc., complete | 5.03 | m3 | 5,298.53 ₹26,651.61 | 5,297.53 ₹26,646.58 |
| 4.00 | RCC 1: 11/2 :3 mix using 20 mm ISS HBG metal for RCC itemsincluding cost and conveyance etc., etc., complete | 14.76 | m3 | 9,098.99 ₹1.3 L | 9,097.99 ₹1.3 L |
| 5.00 | Brick work in cm 1:5 mix for foundation and basement using rough stone and bond stones with simultaneous pointing with same morter etc., completed | 24.14 | m3 | 5,955.74 ₹1.4 L | 5,954.74 ₹1.4 L |
| 6.00Supplying and erecting centering for sides and soffits including supports and strutting upto 3.29m. Ht for plain surfaces including struting etc., complete. | |||||
| 7.00 | Below GL | 27.11 | m3 | 517.1 ₹14,018.58 | 516.1 ₹13,991.47 |
| 8.00 | Above GL | 80.56 | m3 | 1,033.6 ₹83,266.82 | 1,032.6 ₹83,186.26 |
| 9.00 | Supplying fabricating and placing in position of ribbed steel rods for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors etc., complete | 1.75 | m3 | 89,950.34 ₹1.6 L | 89,949.34 ₹1.6 L |
| 10.00 | Weathering course concrete using 20mm broken brick jelly in pure slacked lime | 2.91 | m3 | 3,859.16 ₹11,230.16 | 3,858.16 ₹11,227.25 |
Tender Value
Refer Docs
EMD Value
₹10,000
Closing Date
26 Jun 2025, 3:00 pmClosed
BDO(B.Pt), Krishnarayapuram Union Office
BDO(B.Pt), Krishnarayapuram
Construction of Multi Purpose complex Building at Manavasi AD Street H/O Manavasi Panchayat
2025_RDTN_570510_1
Construction of Multi Purpose complex Building at Manavasi AD Street H/O Manavasi Panchayat
Open Tender
Civil Works - Others
90 days
Krishnarayapuram Union Office
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹10,000
Yes
12 Feb 2026
18 Jun 2025
26 Jun 2025
18 Jun 2025
26 Jun 2025
18 Jun 2025
Amount
Name of the Work : Construction of Multi Purpouse complex Building @ Manavasi AD Street H/O Manavasi Panchayat
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 mix using 40mm iss HBG metal for foundation & flooring including labour charges etc., complete
RCC 1: 11/2 :3 mix using 20 mm ISS HBG metal for RCC itemsincluding cost and conveyance etc., etc., complete
Brick work in cm 1:5 mix for foundation and basement using rough stone and bond stones with simultaneous pointing with same morter etc., completed
Supplying and erecting centering for sides and soffits including supports and strutting upto 3.29m. Ht for plain surfaces including struting etc., complete.
Below GL
Above GL
Supplying fabricating and placing in position of ribbed steel rods for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors etc., complete
Weathering course concrete using 20mm broken brick jelly in pure slacked lime
Finishing the top of roof with one course of Machine pressed tiles of size 23x23x2cm in 1:3 12mm thick using WCC
Paving the floor with best quality Vertified Tiles of size 600 x 600 x 8mm of approved colour, shade and quality laid in cement mortar 1:3 (one cement and three crushed stone M.Sand) 20mm thick in all floors and the top pointed with the white cement mixed same colour pigments etc., complete
Plastering with cement Morter 1:5 12mm thick in all floors including curing etc., complete complying with standard specification and as directed.rials and labour charges etc.,
Plastering with cement Morter 1:3 10mm thick in all floors including curing etc., complete complying with standard specification and as directed.rials and labour charges etc.,
Distembering with best Distember tw coats of approved colour over old including ncost and conveyance of all materials and and all labour charges etc complete.
Painting two coats of approved emulsion paint over one priming coat of old wall surface including cleaning preparing the surface and curing etc complete.
Towards the Cost for Rolling Shutter
Rolling Shutter
Window
Ventilator
Painting two coats of new iron works such as steel doors, Window, Ventilators,Window bars ,Balustrdes etc., with best approved first quality of synthetic enamel paint of approved colour over the existing priming coat etc., complete complying with standard specifications etc.,
Electrical Arrangements
a)Wiring with2*1.5 mm2 (22/.3) pvc insulated unsheathed sc Cu . Conductor of 1100 v grade in suitable PVC ridged pipe on wall and ceiling with PVC accessories with tw switch box inflush with wall covered hylum sheet of 3 mm thick with painting of suitable
Light and Fan point SD 17
Supply and fixing tube light fittng and all labor charges tc complete
Supply and fixing PVC PLUG POINT and all labor charges tc complete
Supply and fixing of single Type street light Flu. fitting complete with copper choke and condensor with TW round blocks on wall or ceiling with flu tube with PVC unsheathed copper leads from terminals to the fittings for Street light
Supplying and fixing of 1200mm(40")AC Ceiling fan with stepped electronic 300W regulator with 1m down rod on the existing clamp
GST Amount for providing Service to Government Contract Works for the above ConstructionWorks. GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
K.Velusamy (BID ID -1381448)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid