| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹182.2 CrAccepted-AOC CRYSTAL TOWER 4TH FLOOR TELIBANDHA RAIPUR | RAIPUR | RAIPUR | CHHATTISGARH | ₹182.2 Cr Quoted ₹204.8 Cr | 1 | Accepted-AOC LoA issued |
| 2 | 2₹231.5 CrRejected-AOC | ₹231.5 Cr | 2 | Rejected-AOC Not Applicable |
| 3 | 3₹338.6 CrRejected-AOC | ₹338.6 Cr | 3 | Rejected-AOC Not Applicable |
Tender Value
Refer Docs
EMD Value
₹2.3 Cr
Closing Date
6 Jan 2023, 5:00 pmClosed
CEPL
CEPL, Electric House, Colaba, Mumbai - 400001
Appointment of Advanced Distribution Management System (ADMS) Implementing Agency (ADMS-IA) For Implementation of ADMS in BEST
2022_BEST_840656_1
DMM(SB)/10/TCU/74909/2022-23/A
Open Tender
Miscellaneous Services
912 days
Mumbai
Refer Tender Document Section IV
4 documents required · 4 mandatory
₹12,000
₹2.3 Cr
Yes
Mumbai
7 Jul 2023
4 Oct 2022
9 Jan 2023
6 Oct 2022
6 Jan 2023
6 Oct 2022
6 Oct 2022 - 17 Oct 2022
21 Oct 2022
SCADA/DMS control Centre C1 - Server/ workstation Hardware
SCADA Server
DMS Server
ICCP Server
OMS Server
FEP server with interface switches
ISR server
NMS server
DTS server
Developmental server
Jump host Server
Workstation with dual TFT Monitors ( S/S monitoring)
Workstation with dual TFT Monitors (Network monitoring)
Remote VDUs with one TFT Monitors
Developmental console with one TFT
DTS/Workstation Console with dual TFTs
DLP/LED Based Video Projection System with 2x3 module configuration with each module at least 70inch diagonal with common projector.
Field Force Automation Hardware Cost (FFA Server, Mobile Devices, Mobile Gateway, Data Base License, Workstation, Ethernet Switch, etc.)
Storage & Backup Devices
San Switch and San Storage with online backup server
External RAID Mass storage device ( for 24 months online backup)
External DAT drive
Switches
Layer II switch (SCADA/DMS LAN, Planning & Development system LAN, Server LAN, etc)-24 Port (Minimum)
Data Centre Router
Router for interfacing IT system & SCADA/DMS DR centre
Router at remote VDU
Security system (DMZ)
Router
Firewall & network IDS/IPS (Including centralized security management system)
GPS Time synchronization system
GPS Digital Display for Time and Frequency
LED TV
Web Server with Load Balancing
Additional Item 1 (For 2 ZCC)
GPS Time synchronization system
GPS Digital Display for Time and Frequency
Work Stations for S/S monitoring
Work Stations for Network monitoring
Firewall & network IDS/IPS
Additional Item 2 - Modular Rack for Servers and networking devices
Additional Item 3 - Cyber security servers
Printer Black & White Laser
Printer Colour Laser
Any other items required to meet functional/performance requirement as per MTS
C2 - Software for Control Centre (For Main & Standby Server)
SCADA Software
DMS Software
ISR Software
OMS Software
DTS Software
ICCP Software
Development Software
Network Management Software
Jump host Software
GIS Adaptor/Engine for Importing Data from GIS System under IT System. Integration with ERP And AMI
Remote VDU Client Software
RDBMS Package
Workstation Client Software
Additional Item 1 Cyber security software
License Cost for FFA
Any other items required to meet functional/performance requirement as per MTS
C3 - Mandatory Additional spares
Spares for IT Hardware 5% of C1
SCADA/DMS DR Control Centre D1 - Server/ workstation Hardware
SCADA Server
DMS Server
OMS Server
FEP server with interface switches
ICCP Server
ISR server
NMS server
DTS server
Jump Host Server
Developmental server
Workstation with dual TFT Monitors ( S/S monitoring)
Remote VDUs with one TFT Monitors
Developmental console with one TFT
DTS/Workstation Console with dual TFTs
DLP/LED Based Video Projection System with 2x3 module configuration with each module atleast 70inch diagonal with common projector.
LED TFT screen for 2 ZCC
Field Force Automation Hardware Cost (FFA Server, Mobile Gateway, Data Base License, Workstation, Ethernet Switch, etc.)
Modular Rack for Servers and networking devices
Storage & Backup Devices
San Switch and San Storage with online backup server
External RAID Mass storage device ( for24 months online backup)
External DAT drive
Switches
Layer II switch (SCADA/DMS LAN, Planning and Development System LAN, Server LAN, etc), Port: 24 (Minimum)
Routers
Router for interfacing IT system & SCADA/DMS DR Centre
Router at remote VDU
Security system (DMZ)
Web server with load balancing
Firewall & network IDS/IPS
Other Active Devices
GPS Time synchronization system
GPS Display for Time and Frequency
Printers
Printer Black & White Laser
Printer Colour Laser
Any other items required to meet functional/performance requirement as per MTS
D2 - Software for DR Centre (For Main & Standby Server)
SCADA software
ISR Software
DMS software
OMS Software
DTS software
Jump Host Software
ICCP Software
Developmental software
Network Management Software
Workstation Client Software.
Remote VDU Client Software
RDBMS Package
License Cost for FFA
Any other items required to meet functional/performance requirement as per MTS
D3 - Mandatory Additional Spares
Mandatory spares 5% of D1
E1 - RTUs
RTU base equipment comprising panels, racks, sub-racks, Power Supply modules, CPU, interfacing equipment, required converters & all other required items/accessories including complete wiring for all modules for locations mentioned at Vol Vi
Multifunctuions transducers
Contact Multiplying Relays (CMRs)
Heavy duty relays for Control
Layer II switch for intergration of Numerical Relay with RTU (industrial grade)
Single TFT PC for LDMS (industrial grade)
Any other software to meet functional/performance requirement of MTS
E2 - Software for LDMS
LDMS software
Any other software to meet functional/performance requirement of MTS
E3 - TEST EQUIPMENTS for RTU
RTU Database Configuration & Maintenance Software tool
Master Station cum RTU Simulator & Protocol analyser software tool
Laptop PC for above software tools along with interfacing hardware including Hub
E4 - MANDATORY ADDITIONAL SPARES
Spares for RTU 5% of E1
F1 - FRTUs
Wall mounted FRTU base equipment along with enclosure suitable to work in open environment (Adequate protection from water & dust) , racks, sub-racks, Power Supply modules with power backup , I/o modules, CPU, interfacing equipment, required converters & all other required items/accessories including complete wiring for all modules
Contact Multiplying Relays (CMRs)
Heavy duty relays for Control
Multifunction transducer
Any other items to meet functional/performance requirement of MTS
F2 - Test Equipments for FRTU
FRTU Database Configuration & Maintenance Software tool
Master Station cum FRTU Simulator & Protocol analyser software tool
Laptop PC for above software tools along with interfacing hardware including Hub
F3 - MANDATORY ADDITIONAL SPARES
Spares for FRTU 5% of F1
G1 - MPLS
Annual charges for 100MBps Links for MCC & BCC
Annual charges for 4MBps Links with RTUs (Main & Standby)
MPLS Router (ISP managable with all necessary accessories including installation cost)
Any other hardware to meet functional /performance requirement of MTS
G2 - GPRS
Annual charges for GPRS Links with FRTUs /FPI
Modems
Any other hardware to meet functional /performance requirement of MTS
G3 - Mandatory Additional Spares
Spares for MPLS & GPRS 5% of G1 & G2
H1 - Main Equipments - Control centre
UPS with 20KVA running in parallel redundant mode
VRLA type Battery banks for above UPS for minimum 8 Hours backup duration
H2 - Main Equipments - DR Centre
UPS with 20 KVA running in parallel redundant mode
VRLA type Battery banks for above UPS for minimum 8 Hours backup duration
H3 - II For RTU / Data Concentrator / Communication Eqpts.
DC Power Supply (DCPS) system based on SMPS
H4 - For FRTU
24V DC Power Supply (DCPS) system based on SMPS
H5 - Remote VDU location
UPS (2 kVA ) with minimum 8 Hours backup
H6 - Mandatory Additional Spares
Spares for UPS 5% of H1 to H5
Integration of existing eFPI installed at DSS
J2 - Control/power/Communication cable for RSS and DSS
Control cable (1000mtr/RSS)
Power cable (300mtr/RSS)
Modbus(Armoured Cable) for MFT (77RSS X 200mtr)
Control cable (200 mtr/DSS)
Power cable (100mtr/DSS)
Control wire for (Numerical Relay Inc. AVR Replacement)(3500m/RSS)
Power Cable for (Numerical Relay Inc. AVR Replacement)(500mtr/RSS)
CT/PT wiring for Ratio Diff. Relay (300 meter/RD relay) for RSS
CT/PT wiring for MFT (50 meter/DSS)
CT/PT wiring for MFT (30 meter/MFT) for RSS
Ethernet LAN Cable (STP) with connector for Relay Inc. AVR connectivity ( 800 meter/RSS)
Modbus (Armoured Cable) for MFT(2850MFT X 21mtr) for DSS.
Multimode Fiber cable
Cable for eFPI
Cable for Analog 4-20mA signal (For AVR)
Communication accessories such as Fiber termination box, patch pannels, connectors, patchcords, UTP,IO Box.etc
J3 - Mandatory Additional Spares
Spares 5% of J1 & J2
K1 - IED Replacement
Replacement of Old Num. relay with New numerical relay compatible with IEC 61850 Ed-1 & Ed-2 protocol at 110/33/11 KV RSS (O/C, E/F and Ratio Differential)
Relay for VCB at DSS (Including Relay mounting arrangement, etc.)
AVR relay for Power Transformer (RSS)
Services for integration of existing /upcoming relays and DGA system with RTU/ADMS
Services for integration of Upcoming DSS relays with FRTU/ADMS
Laptop PC for above/relay software tools along with interfacing hardware including Hub
Additional item 1 - Relay TEST set up including on board installed advanced control with external laptop
Additional Item 2 - Test instrument (1- Primary injection set, CT analyzer) including on board installed advanced control with external laptop.
Additional item 3- 3 Phase secondary injection set
K2 - Mandatory Additional Spares
Spares for each type of relay/item 5% of K1
Comprehensive Facility Management System
Facility Management System charges for SCADA, RELAY, DMS & OMS system (maintaining overall system availability as per TS)
Facility Management System charges for SCADA, RELAY, DMS & OMS system (maintaining overall system availability as per TS)
Project Management Cost (Inclusive of GST)
Installation, Testing and Commissioning Cost to Integrate Entire SCADA & IT (relevant to SCADA) Infrastructure. (15% of total project cost Sr. 1 to 9)
Integration with legacy applications & Data Migration (3% of total project cost Sr. 1 to 9)
Training for the Employees (2% of total project cost Sr. 1 to 9)
Enzen Global Solution
The Tata Power Company Limited
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf