Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.0 LAccepted-AOC ALGAPUR DHARMANAGAR NORTH TRIPURA 799250 | DHARMANAGAR | NORTH TRIPURA | TRIPURA | 799250 | L1 | Accepted-AOC L1 | |
| 2 | L2₹17.9 L+₹1.9 L (12.1%)Rejected-AOC COLLEGE ROAD P S DHARMANAGAR NORTH TRIPURA | L2 | Rejected-AOC L2 | |
| 3 | L3₹18.0 L+₹2.0 L (12.5%)Rejected-AOC DHARMANAGAR NORTH TRIPURA | DHARMANAGAR | NORTH TRIPURA | TRIPURA | L3 | Rejected-AOC L3 | |
| 4 | L4₹18.6 L+₹2.6 L (16.3%)Rejected-AOC JUBARAJNAGAR AA ROAD DHARMANAGAR NORTH TRIPURA | DHARMANAGAR | NORTH TRIPURA | TRIPURA | L4 | Rejected-AOC L4 | |
| 5 | L5₹19.5 L+₹3.5 L (22.2%)Rejected-AOC BARUAKANDI DHARMANAGAR NORTH TRIPURA | DHARMANAGAR | NORTH TRIPURA | TRIPURA | L5 | Rejected-AOC L5 |
Tender Value
₹23.9 L
EMD Value
₹47,898
Closing Date
25 May 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Oo. the Executive Engineer, PWD (RnB) Division, Dh
Oo. the Executive Engineer, PWD (RnB) Division, Dharmanagar, North Tripura
Mtc. of PWD Residential Quarters, other Permanent and Semi Permanent structures including plumbing works etc
2026_CEPWD_73042_1
01/EE/DD/PWD(RNB)/2026-27
Open Tender
Civil Works - Building
Percentage
180 days
Dharmanagar
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,000
₹47,898
14 Jul 2026
18 May 2026
25 May 2026
19 May 2026
25 May 2026
19 May 2026
180 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing grass and removal of the rubbish upto a distance of 50 m outside the periphery of the area cleared. | - | Sqm | 4.8 | - |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m upto 1.5 m in width, including getting out the excavated soil and or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
All kinds of sil, a. By manual means | - | Cum | 231.6 | - |
| 3 | Cement Mortar 1 : 4 (1 cement : 4 fine sand) | - | Cum | 3,857.9 | - |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering -
-All work upto plinth level:
1:3:6 ( 1 Cement: 3 fine sand : 6 graded stone aggregate 20 mm nominal size) | - | Cum | 10,570.6 | - |
| 5 | Centering shuttering including struttings, propping etc. and removal of form work for:
Foundations, footings, bases for columns. | - | Sqm | 303.1 | - |
| 6 | Making plinth protection 50mm thick of cement concrete 1:3:6 (1 cement : 3 fine sand : 6 graded well burnt brick aggregate 20 mm nominal size) over 75mm bed of dry brick ballast 40mm nominal size well rammed and consolidated and grouted with fine sand including finishing the top smooth. | - | Sqm | 894.3 | - |
| 7 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement-
-All work upto plinth level:
1:2:4 ( 1 Cement: 2 fine sand : 4 graded stone aggregate 20 mm nominal size) | 1 | Cum | 11,693.5 | ₹11,681.81 |
| 8 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and skirting courses, fillets, columns, pillars, piers, abutments, posts and struts etc. upto floor five level excluding cost of centring, shuttering, finishing and reinforcement-
1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size) | - | Cum | 13,305.8 | - |
| 9 | Centering shuttering including struttings, propping etc. and removal of form work for:
Columns, Pillars, Piers, Abutments, Posts and Struts with wooden | 1 | Sqm | 570 | ₹569.43 |
| 10 | Centering shuttering including struttings, propping etc. and removal of form work for:
Weather shade, Chajjas, corbels etc., including edges. | - | Sqm | 531.3 | - |
stage.html
html • 0.06 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.36 MB
DNIT01EEMERGED.pdf
Tender Documents • 5.18 MB
BOQ_74332.xls
BOQ • 0.31 MB
Corrigendum.pdf
PDF • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .