Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹5 Cr
Closing Date
21 Apr 2026, 6:00 pmClosed
Similar tender results from the same govt authority in the past 3 years.
Chief Engineer (Project and R&C)
Site Survey, Designing, Engineering, Procurement, Supply, Loading, Transportation, Unloading, Insurance, Delivery at Site, Handling, Storage, Installation, Testing, Commissioning Including Documentation of All Items/Material required to complete works for Turnkey Based Contract For Conversion of Existing 11 kV HT Line and LT Line Network Including Consumer Service Lines Into Under Ground Cable Network With Ring Main System at Jamnagar City-1 Division of Jamnagar Circle Under PGVCL with GIS Mapping / Geo Urja Mapping (Developed by GUVNL) and Asset Tagging under SDMF (Package-63)
292090
PGVCL/PROJ/JMN/CITY-1/P63/202
Open
Supply,erection and Commissioning
Rajkot
21 documents required · 20 mandatory · 1 optional
₹17,700
PASCHIM GUJARAT VIJ COMPANY LIMITED, Rajkot
₹5 Cr
31 Mar 2026
31 Mar 2026
31 Mar 2026
21 Apr 2026
31 Mar 2026
Conversion of Over Head to Underground Network
JAMNAGAR CITY-1 Division of JAMNAGAR Circle
Particulars of Item Grand Total in Rs.
Particulars of Item Grand Total in Rs.
SCHEDULE-B1: CONVERSION OF EXISTING OVERHEAD ELECTRICAL HT
NETWORK IN TO UNDERGROUND CABLE NETWORK
a FOR SUPPLY PART
b FOR ERECTION PART
SCHEDULE-B2: CONVERSION OF EXISTING OVERHEAD ELECTRICAL LT NETWORK
IN TO UNDERGROUND CABLE NETWORK
a FOR SUPPLY PART
b FOR ERECTION PART
A TOTAL AMOUNT (WITHOUT GST)
A TOTAL AMOUNT (WITHOUT GST)
3 BIDDER'S OFFER ( + / - ) IN % 0.00%
4 BIDDER'S OFFER ( + / - ) IN RUPEES
B OFFERED TOTAL AMOUNT FOR SUPPLY AND ERECTION (WITHOUT GST)
B OFFERED TOTAL AMOUNT FOR SUPPLY AND ERECTION (WITHOUT GST)
5 GST @ 18% ON "B"
C GRAND TOTAL (WITH GST)
C GRAND TOTAL (WITH GST)
Date Signature of Bidder Stamp
SCHEDULE-B: CONVERSION OF OVERHEAD TO UNDERGROUND ELECTRICAL NETWORK
Sr. No. Particulars of Item Unit Supply Qty. Unit Rate in Rs Erection Qty. Unit Rate in Rs Grand Total
Sr. No. Particulars of Item Unit Supply Qty. Unit Rate in Rs Erection Qty. Unit Rate in Rs Grand Total
SCHEDULE-B1: CONVERSION OF EXISTING OVERHEAD ELECTRICAL HT NETWORK IN TO UNDERGROUND CABLE NETWORK
UG Cabling by Open Trench method with sand & Bricks 11kV
SqMM XLPE Cable including all required accessories i.e Outdoor Joint
1 Kit,Straight Joint Kit,Pre Warning Tap,Maintenance Free Earthing,G. I. Mtr. 129778 2293 297527436 129778 417 54066579
Strip for Earthing,Cable Tag,Cable Route Marker etc. as per the
instructions of Engineer-in-charge (EIC)
UG Cabling by Trenchless method with HDPE Pipe 11kV 300 SqMM
XLPE Cable including all required accessories i.e Outdoor Joint
2 Kit,Straight Joint Kit,Maintenance Free Earthing,G. I. Strip for Mtr. 55619 2275 126508658 55619 1708 94986124
Earthing,Cable Route Marker,Providing and Laying of HDPE Pipe etc.
as per the instructions of Engineer-in-charge (EIC)
UG Cabling by Open Trench method with sand & Bricks 11kV
SqMM XLPE Cable including all required accessories i.e Outdoor Joint
3 Kit,Straight Joint Kit,Pre Warning Tap,Maintenance Free Earthing,G. I. Mtr. 88662 1394 123615140 88662 416.6082 36937316
Strip for Earthing,Cable Tag,Cable Route Marker etc. as per the
instructions of Engineer-in-charge (EIC)
UG Cabling by Trenchless method with HDPE Pipe 11kV 240 SqMM
XLPE Cable including all required accessories i.e Outdoor Joint
4 Kit,Straight Joint Kit,Maintenance Free Earthing,G. I. Strip for Mtr. 38001.6 1376 52297421 38002 1708 64898849
Earthing,Cable Route Marker,Providing and Laying of HDPE Pipe etc.
as per the instructions of Engineer-in-charge (EIC)
UG Cablling by any method - RMU to TC 11kV 95 SqMM XLPE Cable
including all required accessories i.e Outdoor Joint Kit,Straight Joint
Kit,Maintenance Free Earthing,G. I. Strip for Earthing etc. as per the
instructions of Engineer-in-charge (EIC)
New 11kV/0.433kV 200 kVA Aluminium Winding Transformer with
6 Cable Box including HT Termination Kits, Earthing, Fencing etc. as per No 277 468077 129657406 277 48132 13332592
the instructions of Engineer-in-charge (EIC)
New 11kV/0.433kV 315 kVA Copper Winding Transformer with Cable
Box including HT Termination Kits, ioT based Smart Equipement,
Earthing, Fencing etc. as per the instructions of Engineer-in-charge
New 11kV/0.433kV 500 kVA Copper Winding Transformer with Cable
Box including HT Termination Kits,ioT based Smart Equipement,
Earthing, Fencing etc. as per the instructions of Engineer-in-charge
Augmentation from 200kVA to 500kVA Distribution Transformer (Cu)
including all associated activities such as HT Termination Kits,ioT
based Smart Equipement, Earthing, Fencing etc. as per the
instructions of Engineer-in-charge (EIC)
Sr. No. Particulars of Item Unit Supply Qty. Unit Rate in Rs Erection Qty. Unit Rate in Rs Grand Total
Sr. No. Particulars of Item Unit Supply Qty. Unit Rate in Rs Erection Qty. Unit Rate in Rs Grand Total
Augmentation of 100kVA to 200kVA Transformer with Cable Box (Al)
including all associated activities such as HT Termination Kits,
Earthing, Fencing etc. as per the instructions of Engineer-in-charge
Augmentation of 500kVA to 800kVA Transformer with Cable Box (Cu)
including all associated activities such as HT Termination Kits,ioT
based Smart Equipement, Earthing, Fencing etc.as per the instructions
of Engineer-in-charge (EIC)
11KV SCADA RING MAIN UNIT 3 ISOLATOR (3-WAY) including HT
12 Termination Kits, Earthing, Fencing etc. including civil works as per No 75 636958 47771886 75 50908 3818098
the instructions of Engineer-in-charge (EIC)
11KV SCADA RING MAIN UNIT 1 CIRCUIT BREAKER 2 ISOLATOR (3-
13 WAY) including HT Termination Kits, Earthing, Fencing etc. including No 64 660482 42270845 64 49711 3181492
civil works as per the instructions of Engineer-in-charge (EIC)
11KV SCADA RING MAIN UNIT 4 ISOLATOR (4-WAY) including HT
14 Termination Kits, Earthing, Fencing etc. including civil works as per No 8 839336 6714691 8 52105 416841
the instructions of Engineer-in-charge (EIC)
Total HT-UG (Supply+ Erection) 1371949386 294719265
SCHEDULE-B2: CONVERSION OF EXISTING OVERHEAD ELECTRICAL LT NETWORK IN TO UNDERGROUND CABLE NETWORK
FSP (Fuse Section Piller) 800 Amp including LT Termination Kits,
Earthing and ioT Installation of Smart FSP Monitoring System for smart
FSP etc. including civil works as per the instructions of Engineer-in-
MSP (Mini Section Piller) 400 Amp including LT Termination Kits,
2 Earthing etc. including civil works as per the instructions of Engineer- No 359 76437 27441037 359 4622 1659244
in-charge (EIC)
Construction of New LT Line laying with DWC Pipe for New
3 DTs/Augmented DTs including all necessary allied activities as per the
instructions of Engineer-in-charge (EIC)
Construction of New LT Line Normal Laying for New DTs/Augmented
4 DTs including all necessary allied activities as per the instructions of
Engineer-in-charge (EIC)
Sr. No. Particulars of Item Unit Supply Qty. Unit Rate in Rs Erection Qty. Unit Rate in Rs Grand Total
Sr. No. Particulars of Item Unit Supply Qty. Unit Rate in Rs Erection Qty. Unit Rate in Rs Grand Total
Construction of LT Cabling Work to Provide Service Connections with
5 DWC Pipe including all necessary allied activities as per the
instructions of Engineer-in-charge (EIC)
Smart Distribution Transformer Monitoring System with Two year FMS
(Design, Engineering, Configuration, FAT, Supply, SAT & 2 Years
Cloud, Communication, FMS, Transformer Tests of IR, BDV, Viscocity,
Moisture, Acidity)
Total LT-UG (Supply+ Erection) 495093386 262555889
Total HT-UG & LT-UG (Supply+Erection) without GST 1867042772 557275155
Total HT-UG & LT-UG (Supply+Erection) with GST 2203110471 657584683
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1.UGC-Turnkey-PGVCL-Part-I P-63.pdf
2.Employers requirement.pdf
3. Technical Specifications.pdf
4.UGC-Turnkey-PGVCL-CoC.pdf
5. Declaration of Authorised person and Confict of Interest.pdf
6. Reference Tender Drawing Robust Network.pdf
Scematic Drawing for RCC Transformer Plinth.pdf
P-63 BoQ with Estimated Tender Cost Jamnagar City Div-1.pdf
Acceptance of BG as SD - EMD 1.pdf
Download all tender documents and submit your bid