Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹53.7 LAccepted-AOC | ₹53.7 L Quoted ₹5.1 Cr | L1 | Accepted-AOC accepted |
| 2 | L1₹2.1 CrAccepted-AOC | ₹2.1 Cr Quoted ₹5.6 Cr | L1 | Accepted-AOC accepted |
| 3 | L1₹2.2 CrAccepted-AOC | ₹2.2 Cr Quoted ₹5.0 Cr | L1 | Accepted-AOC accepted |
| 4 | L4₹5.1 CrRejected-Finance | ₹5.1 Cr | L4 | Rejected-Finance Rejected |
| 5 | L5₹5.9 CrRejected-Finance | ₹5.9 Cr | L5 | Rejected-Finance Rejected |
Tender Value
₹6.3 Cr
EMD Value
₹6.3 L
Closing Date
9 Dec 2022, 2:00 pmClosed
Director of Agriculture
Directorate of Agriculture Vikas Bhavan Thirvuananthapuram Kerala
Supply installation trial run and commissioning of Submersible Vertical Axial Flow Pumpsets in KUTTANAD REGION of KOTTAYAM and ALAPPUZHA Districts of KERALA
2022_AGRI_527008_1
ADFW/5590(2)/2022-TG3/NS
Open Tender
Equipments
Item Wise
90 days
Kuttanad Region
Please refer Tender documents.
6 documents required · 6 mandatory
₹25,000
Yes
₹6.3 L
Yes
2 Aug 2023
9 Nov 2022
12 Dec 2022
10 Nov 2022
9 Dec 2022
10 Nov 2022
10 Nov 2022 - 9 Dec 2022
Minimum discharge at duty point head (lps): 180 Duty point head (m): 2.0 Working head range (m): 0.5-4.0 Available power allocation (hp): 20 Overall efficiency at duty point head (%): 70
Minimum discharge at duty point head (lps): 250 Duty point head (m): 2.0 Working head range (m): 0.5-4.0 Available power allocation (hp): 30 Overall efficiency at duty point head (%): 70
Minimum discharge at duty point head (lps): 390 Duty point head (m): 2.0 Working head range (m): 0.5-4.0 Available power allocation (hp): 50 Overall efficiency at duty point head (%): 70
Minimum discharge at duty point head (lps): 450 Duty point head (m): 2.0 Working head range (m): 0.5-4.0 Available power allocation (hp): 60 Overall efficiency at duty point head (%): 70
Minimum discharge at duty point head (lps): 230 Duty point head (m): 2.50 Working head range (m): 0.5-4.0 Available power allocation (hp): 20 Overall efficiency at duty point head (%): 70
Minimum discharge at duty point head (lps): 320 Duty point head (m): 2.50 Working head range (m): 0.5-4.0 Available power allocation (hp): 25 Overall efficiency at duty point head (%): 70
Minimum discharge at duty point head (lps): 390 Duty point head (m): 2.50 Working head range (m): 0.5-4.0 Available power allocation (hp): 30 Overall efficiency at duty point head (%): 70
Minimum discharge at duty point head (lps): 570 Duty point head (m): 2.5 Working head range (m): 0.5-4.0 Available power allocation (hp): 50 Overall efficiency at duty point head (%): 70
Minimum discharge at duty point head (lps): 230 Duty point head (m): 3.0 Working head range (m): 0.5-4.0 Available power allocation (hp): 20 Overall efficiency at duty point head (%): 70
Minimum discharge at duty point head (lps): 390 Duty point head (m): 3.0 Working head range (m): 0.5-4.0 Available power allocation (hp): 30 Overall efficiency at duty point head (%): 70
Minimum discharge at duty point head (lps): 570 Duty point head (m): 3.0 Working head range (m): 0.5-4.0 Available power allocation (hp): 50 Overall efficiency at duty point head (%): 70
Minimum discharge at duty point head (lps): 630 Duty point head (m): 3.0 Working head range (m): 0.5-4.0 Available power allocation (hp): 60 Overall efficiency at duty point head (%): 70
Minimum discharge at duty point head (lps): 570 Duty point head (m): 3.5 Working head range (m): 0.5-4.0 Available power allocation (hp): 50 Overall efficiency at duty point head (%): 70
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .