Executive Engineer, Storm water Drainage project, Vadodara Municipal Corporation
PROVIDING AND LAYING NEW STORM WATER DRAIN FROM SUBHASHNAGAR SLUM TO VISHWAMITRI RIVER IN VISHWAMITRI AREA (3rd Attempt).
265774
1038/2025-26
Open
Miscellaneous Works
Works
Vadodara
3 documents required · 3 mandatory
₹10,000
Municipal Commissioner, Vadodara Municipal Corporation
₹2.2 L
17 Jan 2026
17 Jan 2026
17 Jan 2026
2 Feb 2026
17 Jan 2026
PROVIDING AND LAYING NEW STORM WATER DRAIN
FROM SUBHASHNAGAR SLUM TO VISHWAMITRI
RIVER IN VISHWAMITRI AREA (3rd Attempt),
EXECUTIVE ENGINEER
STORM WATER DRAINAGE PROJECT
VADODARA MUNICIPAL CORPORATION
PMC (PROJECT MANAGEMENT CONSULTANT)
BILL OF QUANTITIES
BILL OF QUANTITIES
1. The bill of Quantities shall be read in conjunction with the Instructions to Bidder,
Conditions of Contract, Technical Specifications and Drawings.
2. The quantities given in the Bill of Quantities are estimated and provisional, and are
given to provide a common basis for bidding. The basis of payment will be the actual
quantities of work ordered and carried out, as measured by the Contractor and verified
by the Engineer and valued at the rates and prices tendered in the priced Bill of
Quantities, where applicable, and otherwise at such rates and prices as the Engineer may
fix within the terms of the Contract.
3. The rates and prices tendered in the priced Bill of Quantities shall, except in so far as
it is otherwise provided under the Contract, include all constructional plant, layout,
supervision, materials, erection, maintenance, insurance, profit, taxes and duties,
together with all general risks, liabilities and obligations set out or implied in the
4. The rates and prices shall be quoted entirely in Indian Currency.
5. A rate or prices shall be entered against each item in the Bill Quantities, whether
quantities are stated or not. The cost of Items against which Contractor has failed to enter
a rate or price shall be deemed to be covered by other rates and prices entered in the
Bill of Quantities (in case of Item rate contract).
6. The whole cost of complying with the provisions of the Contract shall be included in the
items provided in the priced Bill of Quantities, and where no Items are provided the
cost shall be deemed to be distributed among the rates and prices entered for the
related items of Work.
7. General direction and descriptions of work and materials are not necessarily
repeated or summarized in the Bill of Quantities. References to the relevant sections of
the contract documentation shall be made before entering rates or prices against each
item in the Bill of Quantities.
8. The method of completed work of payment shall be in accordance with the specification
for Road and Bridge works. For building works specifications for building are to be
9. Errors will be corrected by the Employer for any arithmetic errors pursuant to Clause
of the Instructions to Bidder.
10. Rock is defined as all materials which, in the opinion of the Engineer, required blasting,
or the use of metal wedges and sledgehammers, or the use of compressed air drilling for
its removal, and which cannot be extracted by ripping with a tractor of at least 150 kw
with a single rear mounted heavy duty ripper.
BILL OF QUANTITIES
(A) Percentage Rate Tender (Up to INR 50 Cr.)
Item Description of Item (with Quantity Unit Rate In Amount
No brief specification and figures
reference to book of
specifications)
I/We am/are willing to carry out the work at….................... % above/below percent
(Should be written in figures and words) of the estimated rate mentioned above.
Amount of my /our tender works out as under.
Estimated amount put to tender Estimated amount put
to tender Deduct………% below Add ..........% Above
In Words In words
1 The Contractor shall exhibit a board with detailed specification and details of
work as directed by the Engineer-In-Charge for which no extra payment shall be
2 The labour cess will be deducted from the bill amount as per prevailing
rules i.e. 1% of the work done.
3 Income tax TDS will be deducted from the bill amount excluding GST at a source
while making payments of bills.
(Government rules will be applicable)
4 Total value of SD i.e. 5% shall be calculated on Contract Price + GST.
VADODARA MUNICIPAL CORPORATION
BILL OF QUANTITIES
NAME OF WORK: PROVIDING AND LAYING NEW STORM WATER DRAIN FROM SUBHASHNAGAR SLUM TO VISHWAMITRI
RIVER IN VISHWAMITRI AREA, VADODARA.
Sr No Item Qty Rate Rs. Per Amount
1 Conducting topographic GIS based survey of the alignment of the proposed works using 0.50 10380.00 Km
total station equipment to capture topographic features including manmade or natural
features in a georeferenced manner along and across the entire route of the works,
including recording the GLs and ILS of of the existing sewers / manhole, prepare and
submit working drawings with correct levels and contactor's preferred sewer route and
indicating the location of connecting manholes / lines to the engineer for approval.
Demolition including stacking of serviceable materials and disposal of unserviceable 40.00 1073.56 CUM
materials with all lead & lift (i) RCC Work
Demolition of Brick Work and Stone Masonary incl stacking serviceable materials and 20.00 558.57 CUM
disposal of unserviceable materials with all lead & lift in Cement Mortar
Excavation for pipe line trenches for water supply ,sewerage line ,manhole, Storm water 2800.00 102.35 CUM
drain etc all with shorting and struting if requried as per requried gradient adn line
4 includin all safety provisions using site rails and staking excavated stuff including upto
requried lead, lift & cleaning the site etc complete fro all lift and starta as specified
a) 0.0 mt to 1.50 mt. depth.
b) 1.5 mt to 3 mt. depth 2600.00 112.70 CUM
c) 3.0 mt to 4.50 mt. depth 50.00 118.45 CUM
RCC pipes (horizontal cast): Providing and supplying ISI standard RCC pipes (of 450.00 7587.00 RMT
sulphate resistance cement) in standard length of following class and diameter suitable for
socket spigot & rubber ring joints, including all taxes, insurance, transportation, freight
charges, octroi, inspection charges, loading, unloading, conveyance, to departmental
stores, staking etc. complete.
Class NP3 1400 mm Dia
Lowering, laying and jointing, RCC pipes in C:M 1:1 1/2 of following diameters in proper 450.00 591.10 RMT
position grade alignment, as directed by engineer in charge, including, conveyance from
store to site work, layout giving hydraulic testing as per ISI code.
Class NP3 1400 mm Dia
C.C. (M-15): Providing and casting in situ C.C. in grade M-15 (approx. corresp. to prop. 40.00 5641.90 CUM
1:2:4) (proportions as per mix design or as per Table 9 of IS456 2000 in masses by weigh
batching ) using granite, quartzite trap metal of size 6 mm to 20 mm for RCC work,
7 including scaffolding centering, form work, needle vibrated consolidation, curing comp. up
to 6 meter depth or height (excluding cost of reinforcement and neat finishing) with
centering and shuttering/deshuttering etc. comp. for structure for other than water
retaining. 1.0 Footing with (form work)
C.C. M-25 Control concrete for water retaining structures : Providing and cast in situ C.C. 240.00 9288.55 CUM
in grade M-25 proportions of ingredients as per mix design by weigh batching using
granite, quartzite trap metal of size 12 mm to 20 mm and or 6 mm to 12 mm including
scaffolding centering formwork, needle vibrated consolidation, curing and hydraulic
testing etc. complete (excluding cost of reinforcement) with centering and
shuttering/deshuttering etc. comp. up to 6 meter height /depth Av. G.L.for all water
retaining structures.
For Flat Bottom Slab /Floor Slab/ Slab with shuttering /Retaining wall for Outfall Structure
9 Providing and filling rubbles including hand packing and filling interstices with quarry 120.00 1075.74 CUM
spalls behind abutments and between returns as directed.
Supplying cutting, bending, binding and placing in position steel as per plan and design 30.00 89129.60 MT
and as per ISS 2502 including cost of steel and binding wire for reservoirs/structures only
including lift up to 6 meter height or depth below G.L. for all diameters Do-deformed
(TMT) bars confirming to relevant IS Fe -500 grade for all diameters.
Brickwork using common burnt clay building brick having crushing strength not less than 10.00 4347.74 CUM
35 kg/sq.cm in foundation and plinth in cement mortar 1:6
Providing 10mm thick cement plaster in single coat on brick/concrete walls for interior 50.00 143.68 SQM
12 plastering up to floor two level and finished even and smooth in.
(i)cement mortar 1:3 (1 cement:3 sand)
Providing and supplying poly propylene steps of standard specification ,installation 250.00 50.00 NO
complete as per direction of engineer in charge
Sr No Item Qty Rate Rs. Per Amount
SFRC Storm Water Frame squre in shaped shall be made from M30 Grade concrete as per 20.00 783.90 Nos
attached drawing and Specification.
1.0 Frame Over all Opening 600 MM X 600 MM
2.0 Frame over all size : 1200 MM X 1200MM
14 3.0 Frame thickness : 165 MM
4.0 Grating Over all sizes 730 MM X 730 MM at bottam level
5.0 Holes: 16 Nos Holes haaving sizes 75 MM X75 MM
6.0 M.S Flat of size to be welded all side of grating and four sides of frame shall be
welded by flat of 25 X3 MM Size
14.1 SFRC Storm Water Drain Grating 20.00 1546.61 Nos
Refilling the Pipeline Trenches incl ramming ,watering consolidating disposal of surplus 5450.00 25.30 CUM
stuff as as directed within VMC limit Total Excavation of Pipe
Dewatering by pumping set of requried capacity incl temparary platform carting pumping 4000.00 21.07 Hp/hr
16 at site and fixing the same in posotion incl all accessories and fuel and labour etc
17 GSB :Providing and laying of good quality material of GSB in proper line,level and 20.00 1045.00 Cum
camber (compacted thickness 300 MM with roller 8-10MT capacity on GSB as per
specification and instruction by engineer incharge.
Providing & laying compacted machine crushed black stone aggregate 250mm 10.00 1748.00 Cum
thick wet mix macadam in two layers in the material with water to OMC in
mecanically mix (pug mill) carriage of mix material by tipper to site
laying,spreading and compacting in sub base of compacting power vibrater roller to
achive the desired density (mechanically laid) etc.complete.as per technical
specification MORTH clause-406
19 Providing and erecting 1.50 metre high temporary barricading at site; each panel of size 100.00 141.70 SQM
2.50mx1.50m made of 40x40x6mm angle iron or 50x50x3mm hollow MS tube
posts/horizontal members/bracings covered with 1.63mm thick MS sheet. The sheet shall
be fixed with 30x5mm MS flat by suitable welding/riveting. The panels shall be made so
that gap of 50cm above the ground is available making overall height as 2.5m. MS channel
ISLC 75 @ 5.70 kg/m, 50cm long shall be provided at the bottom having oval shaped
holes of size 50x25mm at both ends with 50cm long MS angle 40x40x6mm bracing.
Suitable arrangement shall be made to fix the barricading to avoid from overturning by
providing 250mm long expansion fasteners at both ends. The work shall be executed as
per drawing/direction of Engineer-in-Charge which includes writing and painting,
arrangement for traffic diversion such as traffic signals during construction at site for day
and night, glow lamps, reflective signs, marking, flags, caution tape as directed by the
Engineer-in-Charge. The barricading provided shall be retained in position at site
continuously i/c shifting of barricading from one location to another location as many
times as required during the execution of the entire work till its completion. Rate include
its maintenance for damages, painting, all incidentals, labour materials, equipments and
works required to execute the job. The barricading shall not be removed without prior
approval of Engineering-Charge. (Note :- One time payment shall be made for providing
barricading from start of work till completion of work i/c shifting. The barricading
provided shall remain to be the property of the contractor on completion of the work).
C.I. Thimble Mounted Single Faced Rising type Sluice Gate generally as per IS:13349,
Class-1, manually Gear operated having conventional bottom closure. C.I. Wall thimbles,
M.S. spindle, N-Brass seat facing, M.S. fastenters, natural rubber seal, M.S. rubber seal,
with head stock & Spindle Height Approx 5 mt. - 7 mt.
21 Removing of existing pipeline incl. removal of specials, valves jointing material including 15.00 1780.00 Rmt
carting and stacking of removed material from site of work to the department store as
directed excl. excavation and refilling.
For 1000 mm Dia. RCC Pipe
Plugging the mouth of Pipes inside sewer machine holes using suitable plugging and
instalation of bypass arragnment for bypassing the sewerege flow ,incl but not limited to
pumps,pipes connecations coupling elecaticals accrssories,supports traffic diversions
22 arragnments etc incl desilting of machineholes disposal of debries as per the instructions of
EIC and keeping the machineholes free from seepage and removal of bypass system and
making the sewer system for operational as per instruction of Engineer in Charge
a) For Machineholes of Pipes up to 1500 MM Dia
I/We am/are willing to carry out the work at… .................. % above/below percent (Should be written
in figures and words) of the estimated rate mentioned above. Amount of my /our tender works out as
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………% Above
In words In words
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1.0 SBD-Kashi Vishvanath.pdf
2.0 General Specifications-Kashi vishwanath phase 3.pdf
3.0 Price Bid kashi viswanath.pdf
PROPOSED PLAN AND L-SECTION.pdf
RCC CHEMBER 1400 DIA PHASE-3.pdf
OUTFALL LALBAUG PHASE-3.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .