Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹8.3 LAccepted-AOC DEBINAGAR RANIRBAJAR WEST TRIPURA PIN 799035 | WEST TRIPURA | TRIPURA | 799035 | ₹8.3 L | 1 | Accepted-AOC L 1 successful bidder |
| 2 | 2₹8.7 L+₹47,632.67 (5.77%)Rejected-Finance VILL PO NOORPOR P O KAILASHAHAR UNAKOTI DISTRICT TRIPURA | KAILASHAHAR | UNAKOTI | TRIPURA | ₹8.7 L+₹47,632.67 (5.77%) | 2 | Rejected-Finance L 2 |
| 3 | 3₹8.8 L+₹54,893.07 (6.65%)Rejected-Finance | ₹8.8 L+₹54,893.07 (6.65%) | 3 | Rejected-Finance L 3 |
| 4 | 4₹9.6 L+₹1.4 L (16.9%)Rejected-Finance | ₹9.6 L+₹1.4 L (16.9%) | 4 | Rejected-Finance L 4 |
Tender Value
₹11.0 L
EMD Value
₹22,001
Closing Date
4 Jun 2026, 3:00 pmClosed
EE, DSE,
Engg. Cell, DSE, Old Shishu Bihar complex, Agartala near VSK.
Construction of 02 nos Girls Toilet at South kalacherra JB and Sakaibari High School under Kalacherra Block of North Tripura for the year 2025-26.
2026_DDSE_73266_1
18/EE/ENGG.CELL/DSE/2026-
Open Tender
Civil Works
Percentage
90 days
Kalacherra
Please refer tender documents
2 documents required · 2 mandatory
₹1,000
₹22,001
2 Sept 2026
27 May 2026
5 Jun 2026
27 May 2026
4 Jun 2026
27 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. -All kinds of soil | - | Cum | 231.6 | - |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. -All kinds of soil | - | Cum | 161.3 | - |
| 3 | Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete | - | Cum | 1,177.3 | - |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering -All work upto plinth level: a) 1:3:6 ( 1 Cement: 3 fine sand : 6 graded stone aggregate 20 mm nominal size) | 1 | Cum | 10,570.6 | ₹10,560.03 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement -All work upto plinth level: - 1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size) | 1 | Cum | 12,073.8 | ₹12,061.73 |
| 6 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and skirting courses, fillets, columns, pillars, piers, abutments, posts and struts etc. upto floor five level excluding cost of centring, shuttering, finishing and reinforcement - 1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size) | 1 | Cum | 13,305.8 | ₹13,292.49 |
| 7 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto floor five level excluding the cost of centring, shuttering, finishing and reinforcement - 1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size). | 1 | Cum | 13,584.5 | ₹13,570.92 |
| 8 | Centering shuttering including struttings, propping etc.and removal of form work for: - a) Foundations, footings, bases for columns etc. for mass concrete with timber plank. | - | sqm | 333.9 | - |
| 9 | Centering shuttering including struttings, propping etc. and removal of form work for: Columns, Pillars, Piers, Abutments, Posts and Struts with wooden plank | 1 | sqm | 570 | ₹569.43 |
| 10 | Centering shuttering including struttings, propping etc. and removal of form work for: Lintels, beams, plinth beams, girders, bressumers and cantilevers with wooden plank | 1 | sqm | 391 | ₹390.61 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_74563.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.34 MB
BOQ_74563.xls
BOQ • 0.32 MB
DNIeT.pdf
Tender Documents • 4.63 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .