Loading…
Loading…
Tender Value
₹6.4 Cr
EMD Value
₹12.8 L
Closing Date
29 Aug 2026, 4:00 pm4d left
Xen RnB Division Kargil
Office of the Xen RnB Division Kargil
Eshtablishment of Centre of Excellence for Apricoat at Model Orchard Cum Nursery Kurbathang Kargil. Under SDP
2026_PWD_19356_1
E tender 29 of 2026-27 PW RnB Division 2nd Kargil
Open Tender
Civil Works - Buildings
Percentage
240 days
Kargil
Please refer Tender documents.
4 documents required · 4 mandatory
₹6,380
Xen RnB Division Kargil
₹12.8 L
13 Aug 2026
13 Aug 2026
31 Aug 2026
13 Aug 2026
29 Aug 2026
13 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil :All kinds of soil : | 2,400.75 | cum | - | - |
| 2 | Soling-Dumping of stone including cost of stone | 203.25 | cum | - | - |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 144.05 | cum | 0.9 | ₹129.65 |
| 4 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 1,585.02 | cum | - | - |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | 687.11 | sqm | 0.9 | ₹618.4 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for: Lintel, beams, plinth beams, girders, bressumers and cantilevers. | 1,402.69 | sqm | 0.9 | ₹1,262.42 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for: Columns, pillars, piers, abutments, posts and struts. | 657.97 | sqm | 0.9 | ₹592.17 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for: Suspended floors, roofs, landings, balconies and access platforms. | 1,249 | sqm | - | - |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for: Slab Edge Shuttering | 452 | rmt | - | - |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for: Stairs (excluding landings) except spiral staircases. | 30.02 | sqm | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.12 MB
BOQ_45969.xls
BOQ • 0.53 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].