Tender ID
Tender Value
₹30 L
EMD Value
₹30,000
Closing Date
16 Mar 2026, 5:00 pmClosed
Assistant Manager, North Zone
Rectifying of Damage Existing Drainage line and breakdown reparairing work by construction of RCC chamber with using sinking method for removing choking of drainage main line at Laxminagar main road and Diff.Road in Kubernagar at North Zone. (ARC tender)
282706
Tender notice No.18/2025-26 TN-64
Open
Civil Works
Works
Ahmedabad
4 documents required · 4 mandatory
₹1,500
Municipal Commissioner, Ahmedabad
₹30,000
3 Mar 2026
3 Mar 2026
3 Mar 2026
16 Mar 2026
3 Mar 2026
NAME OF WORK : Rectifying of Damage Existing Drainage line and breakdown
reparairing work by construction of RCC chamber with using
sinking method for removing choking of drainage main line at
Laxminagar main road and Diff.Road in Kubernagar at North
Zone. (ARC tender)
TENDER DOCUMENT
General Conditions & Technical Specification
Dy. Municipal Commissioner (North Zone)
AMDAVAD Municipal Corporation.
Rajiv Gandhi Bhavan , Memco – Naroda Road,
AHEMDABAD MUNICIPAL CORPORATION
TENDER DOCUMENTS CONTENTS
General Conditions & Technical Specification
SECTION DESCRIPTION
I NOTICE INVITING TENDER E.Tender Notice no -18/2025-26
II Memorandum of Work
III Invitation For Bids (IFB)
IV Terms & Condition
VI Technical Specification
VII Form of BID
DOWNLOADING OF TENDER THE WEBSITE : - As per Notice Inviting Tender.
http://www.nprocure.com
LAST DATE OF ONLINE SUBMISSION OF :- As per Notice Inviting Tender.
PRICE BID OF TENDER
LAST DATE OF PHYSICAL SUBMISSION :- As per Notice Inviting Tender.
OF TENDER ( Encloses as asked)
OPENING OF TENDER :- As per Notice Inviting Tender.
NOTICE INVITING TENDER (NIT)
AHMEDABAD MUNICIPAL CORPORATION
MAHANAGAR SAVA SADAN
Rajiv Gandhi Bhavan, Memco-Naroda Road, Ahmedabad
E-Tender Notice No –18/ 2025-26
On Line Tenders (E-Tendering) are invited by Ahmedabad Municipal Corporation
from the eligible interested bidders who fulfill the qualifying criteria as specified by AMC
for different Road, Water, Drainage/SWD & Building work of North zone.
Sr. Department No. of Total
1 Building Work
2 Drainage & SWD work
3 Road / Footpath work
The bidders are requested to download the tender document of above
notice from www.nprocure.com. The Last date of Online Submission of tender is Dt.:-
16.03.2026 Up to 5.00 pm & Physical submission of All relevant document must be
submitted by speed post / Hand delivery along with processing fees as mentioned in
tender document only as on Dt.17.03.2026 Up to 5.00 pm. in O/o Asst. Manager
(North Zone). The technical bid shall be opened online on Dt.19.03.2026 at 11.00 hrs.
Any change / correction / corrigendum in respect of above work shall be placed on line.
Contractors are requested to see the website before 24 hours of submission of their
Assistant Manager (North zone), Ahmedabad Municipal Corporation
North Zone Office Building, Memco- Naroda road, Ahmedabad.
Deputy Municipal Commissioner
AHEMDABAD MUNICIPAL CORPORATION
"Rajiv Gandhi Bhavan", Memco - Naroda Raod, AMDAVAD-25.
MEMORANDUM OF WORK
Municipal Commissioner invites online Short E-tenders from interested contractors for
NAME OF WORK:- Rectifying of Damage Existing Drainage line and breakdown
reparairing work by construction of RCC chamber with using sinking method for
removing choking of drainage main line at Laxminagar main road and Diff.Road in
Kubernagar at North Zone. (ARC tender)
1 Name of work Rectifying of Damage Existing Drainage line and breakdown
reparairing work by construction of RCC chamber with using
sinking method for removing choking of drainage main line
at Laxminagar main road and Diff.Road in Kubernagar at
North Zone. (ARC tender)
2 TimeLimit 12 Months(Excluding Monsoon)
3 Tender Validity Period 120 Days from the date of opening of the tender
4 Eligibility Criteria Register “E1” class in PWD in Govt. R&B /CPWD/ AMC or equivalent
Registration with any other state Govt. or institutions.
5 Estimated Cost put to Rs.3000000.00
6 Tender fees Rs.1500.00 Demand Draft in favour of Municipal Commissioner, AMDAVAD)
(Non refundable)
7 Contractor's Class D
8 1% Earnest Money Rs.30000/- (Demand Draft or pay order in favour of Municipal
Deposit Commissioner, Ahmedabad/) To be submitted as below. Demand
Draftor Bank Guarantee shall be from Nationalized Bank /
Sheduled Bank and valid for 120 days. (As per Latest AMC
Finance dept. circular).
9 Submission of EMD and In separate sealed cover each for EMD and Tender Fees along with Tender as
Tender Fees described in the invitation of tender and submitted to Assistant Manager
(NORTH zone) , Rajiv Gandhi Bhavan, Memco-Naroda Road, AHEMDABAD To
be Submitted Physically As per N.I.T
10 Date of Opening of Technical As per Notice inviting Tender /Addendum /Corrigendum (only
bid Techanical Bid) to Assistant Manager / Dy.C.E.(N/Z) office Rajiv Gandhi
Bhavan, Memco – Naroda Road, AHEMDABAD Municipal Corporation,
11 Security Deposit 5 % of the Sanctioned Tender Amount in form of Bank
Guarantee/Demand Draft / Local MICR Cheque. & attched
12 Mode of sending the Tender Price bid should be submitted by online e-tender only and Technical bid
Documents should be submitted physically also in sealed envelope systems By
RPAD/Speed post/ Hand Delivery in sealed covers in Duplicate (One Original
& One Duplicate) Each part shall be separately duly sign & seal by contractor
13 liquidated damages 0.1% of contract price per day from the date of delay. Maximum limit of
liquidated damages for delay in completion of work will be 10% of the
Contract Price rounded of to the neared thousand.
14 Deduction of Retention 2% of the value of work done will be deducted from each RA bill. It will be
Money from each RA Bill released along with release of payment of Final Bill.
15 Defect & LiabilityPeriod The contractor shall be responsible to make good and remedy at
his own expense any defect which may develop or may be
noticed before the period mentioned here under from the certified
date of completion, The within 15 day so of receipt of the notice.
In the case of failure on the part of the contractor, the Engineer-
in-charge may rectify or remove or re-execute the work at the risk
& cost of the contractor. The Engineer-in-charge shall be entitled
to appropriate the whole or any part of the amount of security
deposit to wards the expenses, if
any, Incurred by him in rectification, removal or re-execution. The
Defects Liability period shall be as under (a) for all works costing
upto Rs. 50,000 ( amount put to tender), the period shall be
months from the certified date of completion.
(b) for all works costing more than Rs. 50,000 and upto Rs.
crore (amount put tender), the period shall be 6months from the
certified date of completion or one monsoon, whichever is later.
(c) for major projects costing more than Rs. 1 crore, the period
shall be 12 months from the certified date of completion which
should include one monsoon.
(d) For building works, the period specifiedin (a), (b) or (c) above
O Relapse of monsoon period following the certified date of
completion, whichever is later. Forth e purpose of deciding the
monsoon period, the 30th September may be
Treate das the last date.
16 Time permitted to start Whenever a work is allotted by Engineering staff, whether minor
parts of work or major of part there of of any amount, the contractor shall be
bound to start the works within 48 hour so intimation of work.
Communication done telephonically via SMS, Via Whatsapp and
through letter / E-mail shall be considered legal and binding for
the same. Failure of comply to start the works in 48 hours of
intimation as above by contractor the contractor shall be levied
penalty of (1) Rs.1000/- per day (for tenders amounting upto
10Lakhs), (2) Rs.2500 per day (for tenders amounting above
Lakhs and upto 30 Lakhs), (3) Rs.5000 per day (for all tenders
amounting above 30Lakhs). Three times failures by contractor
shall make contractor responsible to be black listed unless and
otherwise justified properly in
writing/ binding within 15 day so flast notice of penalty.
17 Compensation for Delay 10% of Remaining work (AsperCircular)
18 Addendum / Corrigendum Addendum / Corrigendum If any Shall be Published 48 Hrs. Price
To the Final Submission Time And Date. The Same Shall From apart
And The Same As to be Attached Along With The Tender Document.
19 EPF Act As per Acoount Department circularno -37 Date:09/08/2018
20 GST GST will be paid extra by AMC/Authority at prevailing rate to the
21 Amount to be deducted Welfare cess as per act 1996 @ 1 % of bill amount
from each bill for labour
welfare fund (non-
22 Contractor's Name
23 Contractor's Address
24 Contractor's Register
25 Contractor's Bank Name
26 Branch Address
27 Bank Account Number
30 Contractor's E-Mail:
Note: Conditional tenders will not be accepted in any case. Municipal Commissioner reserves the rights to
reject any or all the tenders without assigning any reasons thereof.
Seal and Signature of the Bidder Addl.City Engineer
To be notarized by Notary
TENDER DECLARATION FORM
Addl. CITY ENGINEER (NORTH ZONE)
"Rajiv Gandhi Bhavan",
Memco - Naroda Raod, AHEDABAD-25.
Name of Work : Rectifying of Damage Existing Drainage line and breakdown reparairing work
by construction of RCC chamber with using sinking method for removing
choking of drainage main line at Laxminagar main road and Diff.Road in
Kubernagar at North Zone. (ARC tender)
I/We the undersigned have carefully gone through and clearly understood the Tender documents of above
mentioned project comprising of Notice Inviting tenders, Articles of Agreement, Scope of work, Definition of
terms, notes Instructions/Information to Bidder, Condition of Contract, special condition of contract,
Appendices, Specifications, Bill of Quantities, Statements (1 to 6) furnished by AMDAVAD MUNICIPAL
I/We do hereby offer to execute and complete the whole of the work within the time specified all in accordance
with the specification, designs, drawing and instruction in writing referred to in the said document and with such
materials as mentioned for, at the respective rates which I/we have quoted in the Price Bid or at such other
rates as may be fixed under the provisions of these conditions.
In the event of this tender being accepted I/We agree to enter into an agreement and when required, execute
the contract, according to your form 1 of agreement as or in default where of I/we bound myself/ourselves to
forfeit the "Earnest Money Deposit."
I/We understand that if I/We shall not enter in agreement within fifteen days or as decided by AMC from the
date of receipt of letter of acceptance, you will forfeit the earnest money paid by me/us and take necessary
action as deemed fit.
I/We have enclosed a Demand Draft / Bank Guarantee as an “Earnest Money Deposit", for the sum as
mentioned in NIT, the full value of which is to be absolutely forfeited to the Employer If I/We fail to commence
the work specified. Otherwise the Employer shall retain the said sum, as on account of such Security Deposit as
provided for in the aforesaid documents.
I/We agree not to employ sub-contractors other than those that may be approved in accordance with conditions
in the aforesaid documents.
I/We understand that Municipal Commissioner is not bound to accept the lowest or any tender, which are
received. I / We also understand & agree that Municipal Commissioner Reserves the right to allot number of
tenders to successful bidders at his sole discretion in case if I / We am/are lowest in more than one tender.
I/We am/are bound to execute the job if the work order is issued within 180 days from the date of opening of
I am bound to execute the work by maintaining all Quality aspects/parameters mentioned in the tender terms
and conditions. I am also bound to submit all supporting Genuine Original documents and if any discrepancy
found in such documents as well as in the executed Work with respect to Quality/Quantity at any stage of work
or even after completion of work, it will be solely my Responsibility. I am bound to prove originality of all
documents submitted by me and if any Documents found false/fake then Municipal Commissioner/AMC has
right to take any action/penalty/punishment against me.
I am also bound that if I/we, indulged into any malpractice and/or used any inferior quality and/or the
construction of road is found to be of an inferior quality under this contract than in such case Municipal
Commissioner/AMC has right to debar/ blacklist for three years.
I/We agree to pay the Government income-Tax, GST/Sales-Tax (Central and State), Octroi duties, Royalty on
material (i.e. Aggregate, Sand etc.) And any other taxes prevailing and from time to time on such items on
which the same are leviable and the rates quoted by me/us are inclusive of the same.
Yours faithfully
Date: Seal and Sign of Bidder
AHMEDABADMUNICIPALCORPORATION
Invitation for Bid (IFB)
1. The AHMEDABAD MUNICIPAL CORPORATION, (here in after called “the
Employer”) invites sealed Tender document from reputed and qualified bidders for the
construction of Works detailed in the Table below:-
Sr. NameofWorks Approximatev Earnest CompletionP
No alueofworks(R MoneyD eriod
1 Rectifying of Damage Existing Rs.3000000.00 Rs.30000.00 12 Months
Drainage line and breakdown (Excluding
reparairing work by Monsoon)
construction of RCC chamber
with using sinking method for
removing choking of drainage
main line at Laxminagar main
road and Diff.Road in
Kubernagar at North Zone. (ARC
2. Interested bidders shall download the tender documents from AMC’s website
www.amc.nprocure.com/ www.nprocure.com.
3. Tender (a complete set of bidding document) fee shall be As per N.I.T in the form of Demand Draft / Pay Order
from any Nationalized Bank in favor of MUNICIPAL COMMISSIONER, AMDAVAD, payable at AMDAVAD, which
shall be non refundable. The Details of Tender fees shall be submit with scan copy at the time of Quoting
price bid of the tender and Physically to be submitted along with technical bid Vol.-1 with other enclosure.
4. All bids must be accompanied by Earnest Money Deposit of the amount specified for the Works in the above
Table payable at AMDAVAD and drawn in favor of MUNICIPAL COMMISSIONER, AMDAVAD, payable at
AMDAVAD,. Earnest Money Deposit will have to be specified in Clause 2 of Financial Condition.
5. Physical submission must be delivered to Asst. Manager (Admin) North Zone, Rajiv Gandhi Bhavan, Memco –
Naroda Road, AMDAVAD As per N.I.T
6. The Bids will be opened on As per N.I.T at the office of Addl.City Engineer (N/Z) , 1st Floor, Rajiv Gandhi
Bhavan, AMDAVAD Municipal Corporation, Memco-Naroda road, AMDAVAD-25. in the presence of bidders or
their representatives who choose to attend. In the event of the specified date of bid submission/opening being
declared a holiday for the employer, the bids shall be received /opened on the next working day at the same
place and the same time.
TERMS & CONDITIONS
( A ) INSTRUCTIONS TO BIDDERS (ITB)
( B ) GENERAL TERMS & CONDITIONS
( C ) FINACIAL TERMS & CONDITIONS
( D ) MAIN CONDITION / FEATURES OF THE WORK
AHEMDABAD MUNICIPAL CORPORATION
TERMS & CONDITION
( A ) INSTRUCTIONS TO BIDDERS (ITB)
1. Procedure for Submission of Tender
a).The Bidder should quote the price bid in E- tender form before last date of online submission as per N.I.T and all
other details as asked in the tender.
b).The bidder shall submit the following Tender documents physically in hard copy in two separate envelope
(marked as “original” and other marked as “Duplicate”) in schedule time by RPAD/ Speed Post/ Hand Delivery in
duplicate. This envelope shall be sealed in an outer envelope. The Bid envelopes shall be marked as follows:-
➢ Tender Document Vol.
➢ Registration certificate of class
➢ Power of Attorney
➢ Personal Details
➢ Enclosures as asked in tender
➢ Technical specifications duly sign by contractor.
c).The envelope shall be addressed to the Employer at the following address:
Assistant Manager, North Zone,
1st Floor, Rajiv Gandhi Bhavan,
Memco-Naroda Road,
d) Bear the following identification:
“TO BE OPENED ONLY IN PRESENCE OF THE EVALUATION COMMITTEE”
e) Indicate the name and address of the bidder.
If the outer envelope is not sealed and marked as above, the Employer will assume no responsibility for the
misplacement or premature opening of the bid.
f) All information has to be typed or hand written legibly. All pages of the Bid have to be initialed by the bidder.
g).ALL INFORMATION HAS TO BE SUBMITTED IN THE PRESCRIBED FORMAT ONLY. Projects for which incomplete
information has been provided will not be considered for evaluation. The Bidder may attach separate sheets if
so required. However, the final bound document submitted, has to be submitted in vertical A4 size (210 mm X
297 mm) except Form of Bids.
2. Assessment of Submission
2.1The Employer will open the physically submitted document of all the bids received for the package (except
those received late) containing the sealed Tender volume and other enclosures then announce the names of
bidders in the presence of bidders or their representatives who choose to attend on the date and time
mentioned in the IFB. In the event of specified date of bid opening being declared as a holiday for the
Employer, the Tender will be opened at the appointed time and location on the next working day.
2.2 In Physical submission, Bidders detailed and tender fee, E.M.D. shall be opened first. The Employer at the
opening will announce bidder’s names, , the presence/or absence of EMD, the amount and validity of EMD
furnished with each bid, is valid registration and such other details, as the Employer may consider appropriate.
2.3 The Employer will determine whether the bid is accompanied by the required EMD.
2.4 If the EMD furnished does not conform to the amount and validity period as specified in the Invitation for Bid
and has not been furnished in the form, the bid shall be rejected by the Employer as non-responsive and the
Tender volume will be returned to the bidder.
2.5 Subject to confirmation of the EMD by the issuing bank, the Tender volume accompanied with valid EMD will
be taken up for further evaluation. In case, the Bank does not confirm the EMD, the bid shall be rejected as
non-responsive and no further evaluation carried out.
2.6 The tender volume will further be examined to determine whether the bid has been properly signed,
meets the eligibility and qualification criteria, has the required available bid capacity, is accompanied by the
requisite certificates, undertaking and other relevant information specified in the bid documents and is
substantially responsive to the requirement of the bidding documents and provides any clarification for
ascertaining the correctness of the information/details.
2.7 The Employer shall prepare besides the record of bid opening, minutes of the Bid opening, including the
information disclosed to those present in accordance with Sub Clause 3.2 thereof.
2.8 The bidders or their representatives who are present shall sign attendance sheet evidencing their attendance.
2.9 If the Tender volume is not substantially responsive, it will be rejected by the Employer and will not
subsequently be made responsive by correction or modification or withdrawal of the nonconforming deviation
or reservation.
3. Evaluation and Comparison of Tender volume
The Employer will evaluate and compare only those Tender volumes which are determined to be substantially
responsive in accordance with Clause 2 and qualified for award of Contract in accordance with Clause
5(General Terms and Condition).
4. Procedure for Tender Opening
Received copies of tender in physical form with in schedule time, will be open on schedule date and time. In
the event of specified date of bid opening being declared bidders who qualify the criteria then bidder bid will
be considered for opening of price bid.(Following clause no. 5 of ITB).
5.1 The Employer will award the Contract to the bidder whose bid has been determined to be substantially
responsive to the bidding documents and who has offered the lowest Evaluated Bid Price, provided that such
bidder has been determined to be (i) eligible in accordance with the provisions of Clause 3(General Terms and
Condition); and (ii) qualified in accordance with the provisions of Clause 5(General Terms and Condition).
6. Notification of Award
6.1 Prior to expiration of the period of bid validity prescribed by the Employer, the Employer will notify the
successful bidder by cable/fax and confirmed by registered letter that his bid has been accepted. This letter
shall name the sum which the Employer will pay the Contractor in consideration of the execution, completion
and maintenance of the Works by the Contractor as prescribed by the Contract.
6.2 The notification of award will constitute the formation of the Contract.
7. As per City Engineer Circular (WRM) no. 6 2011/12 DT: 24/06/2011. A successful Bidder has to deposit
security deposit / Bank Guarantee within 15 days after receiving letter of Indent(LOA). Time limit of work
will commence from the date of issue of work order.
8. Clarification of Bids
8.1 To assist in the examination, evaluation and comparison of bids, the Employer may, at his discretion, ask
any bidder for authentication the correctness of the information/details furnished by him in his bid. Such
request by the Employer and the response by bidder shall be in writing or by cable/fax.
8.2 Subject to above clause, no bidders shall contact the Employer on any matter relating to his bid from the
time of bid opening to the time contract is awarded.
8.3 Any effort by the bidder to influence the Employer in the Employer’s bid evaluation, bid comparison or
contract award decisions may result in the rejection of his bid.
9.1 Information relating to the examination, clarification, evaluation and comparison of bids and recommendations
for the award of a contract shall not be disclosed to bidders or any other persons not officially concerned with
such process until the award to the successful bidder has been announced. Any effort by a bidder to influence
the Employer's processing of bids or award decisions may result in the rejection of his bid.
10.1 The bidder is advised to visit and examine the Site of Works and its surroundings and obtain for itself on its
own responsibility all information that may be necessary for preparing the bid and entering into a contract for
construction of the Works. The costs of visiting the Site shall be at the bidder’s own expense.
10.2 The bidder and any of its personnel or agents will be granted permission by the Employer to enter its
premises and lands for the purpose of such inspection, but only upon the express condition that the bidder,
its personnel and agents, will release and indemnify the Employer and its personnel and agents from and
against all liability in respect thereof and will be responsible for death or personal injury, loss of or damage to
property and any other loss, damage, costs and expenses incurred as a result of the inspection.
Seal and Signature of the Bidder Addl.City Engineer
Date: (North Zone)
AHEMDABAD MUNICIPAL CORPORATION
TERMS & CONDITION
( B ) GENERAL TERMS & CONDITIONS
1. Scope of Bid
1.1 The AMDAVAD Municipal Corporation hereinafter called "the Employer" invites Tender document for the
construction of works (as defined in these documents, hereinafter referred to as "the Works") detailed in the table
given in the IFB.
1.2 The Works consist of:
Rectifying of Damage Existing Drainage lin/Strom water Drainage line and breakdown reparairing work by
construction of RCC chamber with using sinking method for removing choking of drainage main line at
Diff.Road in Kubernagar at North Zone. (ARC tender)
2. Source of Funds
2.1 The expenditure on these Works will be met by AMDAVAD MUNICIPAL CORPORATION.
3. Eligible Bidders
3.1 This invitation for bids is open to bidders who has necessary bid capacity and who meet the following
➢ A bidder shall not be under a declaration of ineligibility for corrupt or fraudulent practice.
➢ The bidders shall have a registration with State PWD, and/or CPWD for Required class and or equivalent
with specialization in road works. If contractor is not registered with AMC in the relevant class, on award of
contract he shall be required to register himself with AMC within 3 month's time.
Bidders shall provide such evidence of their continued eligibility satisfactory to the Employer, as the Employer shall
reasonably request.
4. Eligible Material, Equipment and Services
4.1 At the Employer's request, the bidder having offered the lowest evaluated financial bid may be required to
provide evidence of the origin of materials, equipment, and services to the satisfaction of the Employer.
4.2 For purposes of Sub Clause 4.1, "origin" means the place where the materials are mined, grown, produced or
manufactured; similarly for equipments and from where the services are provided.
5. Qualification of the Bidder
To be qualified for award of Contract, bidders shall:
a) Submit a written power of attorney authorizing the signatory of the bid to commit the
General information
All individual firms must complete the information in this form. Nationality information shall be provided for all
owner(s) or applicant(s) that are partnership or individually owned firms.
1 Name of firm:
2 Head office address:
3 Local office address (if any):
4 Telephone/ Contact:
5 E-mail address:
6 Place of incorporation/registration:
7 Year of incorporation/registration:
➢ Additional information regarding litigation, debarment, arbitration, etc.
5.3 Disqualification
Even though the Bidders may meet the above criteria, they are subject to be disqualified for any of the following
a) Misleading or false representation in the forms, statements and attachments submitted and included in
b) Record of poor performance such as abandoning the work, rescinding of contract for which the reasons are
attributable to the non-performance of the contractor, consistent history of litigation awarded against the
applicant or financial failure due to bankruptcy.
c) Has been identified by the Employer as poor performer in implementation of ongoing AMC works.
5.4 Debarment/Black listing
Notwithstanding the above, the Employer may debar or blacklist any of the bidder(s) for their misleading or false
representations in the forms statements etc. for the period to be decided by the Employer
6. One Bid per Bidder
6.1 Each bidder shall submit only one bid per contract package either by himself or as a partner in a joint venture.
A bidder who submits or participates in more than one bid for a contract package will be disqualified.
7. Bidding Documents
The bidder is expected to examine carefully the contents of all the above bid documents. Failures to comply with
the requirements of bid documents will be at the bidder's own risk. Pursuant to Clause 16, bids which are not
substantially responsive to the requirements of the bidding documents will be rejected.
8. Language of Bid
The bid, and all correspondence and documents related to the bid exchanged between the bidder and the
Employer shall be written in the English language. Supporting documents and printed literature furnished by the
bidder may be in another language provided they are accompanied by an accurate translation of the relevant
passages in the English language, in which case, for purposes of interpretation of the bid, the English translation
9.1. Unless stated otherwise in the bidding documents, the Contract shall be for the whole works as described in
bidding documents, based on the percentage rate amount in the Bill of Quantities submitted online by the
9.2. The bidder shall fill (in e-tender) in percentage rate above or below and total amount (both in figures and
9.2. The bidder shall fill (in e-tender) in percentage rate above or below and total amount (both in figures and
words) for overall items of the Works provided in the Bill of Quantities
10. Bid Validity
10.1 Bids shall remain valid as per Instruction to Bidders (ITB) after that deadline date for bid submission specified
in Clause. The Employer as non-responsive shall reject a bid valid for a shorter period.
10.2 In exceptional circumstances, prior to expiry of the original bid validity period, the Employer may request the
bidders to extend the period of validity for a specified additional period. The request and the responses
thereto shall be made in writing or by fax. A bidder may refuse the request without forfeiting his bid security.
A bidder agreeing to the request will not be required or permitted to modify his bid but will be required to
extend the validity of his Bid Security for the period of the extension, and in compliance with Clause 2 (
Financial Terms & Conditions) in all respects.
11. Format and Signing of Bid
11.1 The bidder shall prepare two copies of the documents comprising the bid as described in Instructions to
11.2 The bid shall be typed or written in indelible ink and shall be signed by a person or persons duly authorized to
sign on behalf of the bidder.
11.3 The bid shall contain no alterations, omissions or additions, except those to comply with instructions issued
by the Employer, or as necessary to correct errors made by the bidder, in which case the person or persons
signing the bid shall initial all such corrections.
11.4 All witnesses and sureties shall be persons of status and probity and their full names,
Occupations and addresses shall be printed below their signatures.
12. Deadline for Submission of Bids
Bids must be received by the Employer at the address specified above not later than the time and date specified in
Any bid received by the Employer after the deadline for submission of bids will be returned unopened to the
14. Signing of Agreement
At the same time that the Employer notifies the successful bidder that his bid has been accepted, the Employer will
direct him to submit the Performance Security and attend the Employer's office on a date determined by the
Employer for signing the Form of Agreement.
15. The selection process will lay high emphasis on the ability and competency of contractors to do high quality
work within the given time schedule.
16. The onus of providing, all necessary company / project related information, in appropriate manner and
medium, so as to demonstrate the competency of the bidder and to allow proper evaluation, will rest entirely on
17. All clause shall be operative from the date of issue of work order and up to the expiry of original and extended
18. Legal Condition:-
❖ Corrupt or Fraudulent Practices
The Employer will reject a proposal for award if he determines that the Bidder recommended for award has
engaged in corrupt or fraudulent practices in competing for the contract in question. The Employer will declare
the firm ineligible, either indefinitely or for a stated period of time, to be awarded a contract by AMDAVAD
MUNICIPAL CORPORATION if it at any time determines that the firm has engaged in corrupt or fraudulent
practices in competing for the contract, or during execution.
❖ “corrupt practice” means behavior on the part of officials in the public or private sectors by which
they improperly and unlawfully enrich themselves and/or those close to them, or induce others to
do so, by misusing the position in which they are placed, and it includes the offering, giving,
receiving, or soliciting of anything of value to influence the action of any such official in the
procurement process or in contract execution; and
❖ “fraudulent practice” means a misrepresentation of facts in order to influence a Procurement
process or the execution of a contract to the detriment of the Borrower, and includes collusive
practice among bidders (prior to or after bid submission) designed to establish bid prices at artificial
non-competitive levels and to deprive the Borrower of the benefits of free and open competition.
❖ Municipal Commissioner reserves the rights to reduce/increase the scope of work and contract without
assigning any reason thereof.
❖ If AMDAVAD Municipal Corporation is convinced that the Bidder has resorted to material misrepresentation or
provided fraudulent information / statement, the said Bidder will be liable for disqualification / rejection at any
❖ Proof for fulfillment of eligibility criteria should be submitted along with Tender volume. If the Tender volume
is submitted without valid documents and without proof of eligibility criteria it will be rejected.
❖ Those who do not meet with the eligibility criteria need not submit the Tender document.
❖ Tenders, which do not fulfill all or any of condition or are submitted incomplete in any respect or are
conditional tenders, will be rejected.
❖ Contractor shall be responsible to obey all Labour Laws, Environmental and Safety Laws.(the existing laws as
well as framed from time to time). Any penalties laid due to violation of such laws shall be directly deducted
from the contractor's outstanding
19. Administrative Conditions:-
❖ Safety and Signage
Contractor has to arrange for the complete safety of the persons working for project, users of the road i.e.
public and vehicles also. All the arrangements of traffic drums, metal / fiber cones, traffic blinkers, traffic signs
as per design, safety tapes etc. to be arranged at site. Necessary florescent marking on traffic signs to be
provided so that it should be visible at night. During night working hours safety in charge personnel shall be
provided with florescent jackets.
The Contractor has to make all the necessary arrangements for making all the temporary diversions for
proper working at site including traffic signages, safety cones, traffic blinkers, barricading tapes, red and
green flags etc for making easy smooth and safe conditions for the traffic. The Contractor shall and must
provide above at his own cost.
❖ Liaison with local authority for electrical connections for the AMC
The contractor is responsible for liaison with local authority for change in supply connection or new connection
on behalf of AMC. It includes filling the necessary application to power Supply Company, follow up and getting
the supply, filling the necessary test reports to the power supply company. All official fees including security
deposits and other expenses shall be of initially paid by the contractor.
❖ Contractor shall not sub-let the work without permission of the authority.
Seal and Signature of the Bidder Addl.City Engineer
Date: (North Zone)
AHEMDABAD MUNICIPAL CORPORATION
TERMS & CONDITION
(C) FINACIAL CONDITION
1. Cost and Currencies of Bidding:-
The bidder shall bear all costs associated with the preparation and submission of his bid and the Employer
will in no case be responsible or liable for those costs.
Currencies of Bid and Payment
➢ The rates and the prices shall be quoted by the bidder entirely in Indian Rupees
➢ All payments including advances, if any, shall be made in Indian Rupees.
2. Earnest Money Deposit:-
2.1 Bank guarantees (and other instruments having fixed validity) issued as surety for the bid shall be valid for
28 days beyond the validity of the bid.
2.2 The EMD of the unsuccessful bidders, except for L1, L2 and L3 bidders, will be returned as promptly as
possible as but not later than 28 days after the expiration of the period of bid validity.
2.3 The EMD of the successful bidder, along with second and third lowest tenders, will be returned when the
bidder has furnished the required performance security and signed
2.4 Earnest Money Deposit may be forfeited
a) if the bidder withdraws his bid during the period of bid validity;
b) in the case of a successful bidder, if the bidder fails within the specified time limit to
i) Furnish the required Performance Security or
ii) Sign the Agreement.
3. (A) Security Deposit :-
Within 15 (Fifteen) days of the date of receipt of the Letter of Acceptance/Work Order, the successful
bidder shall deliver to the Employer, a Initial Security Deposit in the form of a Bank Guarantee for an
amount equivalent to 5% (Five percent) of the Contract Price .
The Security Deposit to be provided by the successful bidder in the form of a bank guarantee as per
format shall be issued from any Nationalized or RBI approved foreign bank having net worth of more
than Rs.500 Crore of Indian Operation and acceptable to Employer.
(C) Retention :-
a).Retention @ 2% of the value of work done will be deducted from each RA bill. It will be released along
with release of payment of Final Bill.
4. Approved Bank: - As per AMC finance Department Circular No-10, Dt.01.06.2022
5. No advance for machinery or materials will be given.
6. Mobilization advance will not be given.
7. Quantities in B.O.Q. may vary up to any extent and contractor shall not claim any extra rate for the same.
8. Penalty: - Compensation for (0.10%) zero point one percentage of Delay contract price for uncompleted
work per day subject to a maximum up to ten percentage of contract price or as decided by Municipal
9. Tax, Duties on Materials
All charge on account of Octroi ,excise duties, terminal tax, sales tax. Service tax, VAT etc. on material
procurement or any other component for the works from any source shall be borne by the contractors.
All duties, taxes, Service Tax and other levies payable by the Contractor under the Contract, or for any
other cause as of the date 28 days prior to the deadline for submission of the bids, shall be included in the
rates and prices and the total bid price submitted by the bidder and the evaluation and comparison of bids
by the Employer shall be made accordingly.
Seal and Signature of the Bidder Addl.City Engineer
Date: (North Zone)
AHEMDABAD MUNICIPAL CORPORATION
Tender form B-1
FORM B-1 OF GUJARAT STATE ROADS AND BUILDING DEPARTMENT/ WATER RESOURCES DEPARTMENT
may be referred.(only English version)
Note binding on the contractors
01. The terms and conditions of contract mentioned in the Clause no 1 to 77 of Form B-1 of Gujarat State
Road and Building Department / Water Resources Department shall be applicable. Binding on the
contractors unless specifically mentioned about it hereunder in clause no.15 to
02. Please read “AHEMDABAD Municipal Corporation “instead of “Government / Government of Gujarat
“wherever written.
03. Please read “AHEMDABAD Municipal Corporation “ instead of “ Government of Gujarat State Public
Works Department/Public Works Department/ Government “ wherever written.
04. Please read “City Engineer" instead of “Superintending Engineer “or Executive Engineer wherever written.
05. “AMDAVAD Municipal Corporation “herein called as “AMC “
06. “Governor for the state of Gujarat “shall be read as “Municipal Commissioner / AMDAVAD Municipal
07. The contents / details / information mentioned in the relevant point under the heading
08. The contents / details / information mentioned in the relevant point under the heading “NOTICE
INVITING TENDERS” may be read as under-
Point No 1 may be read as: Tenders are invited by Municipal Commissioner ,AMC for the work of
▪ Rectifying of Damage Existing Drainage lin/Strom water Drainage line and breakdown
reparairing work by construction of RCC chamber with using sinking method for
removing choking of drainage main line at Diff.Road in Kubernagar at North Zone.
(ARC tender) OF AMDAVAD CITY Point No.3 : The class of contractor shall be as per
Memorandum of Works in Brief.
▪ The Cl. No. 14.2, 21, 38, 60, 69, 73, 74, 75 shall be read as deleted.
09. The contents / details / information mentioned in the relevant point under the heading
“ADDITIONAL INSTRUCTIONS TO PERSONS TENDERING” shall be read as under-
▪ Point No .2.1 may be read as per the details mentioned in the tender notice
10. DECLARATION FORM & DECLARATION CERTIFICATE are given separately in Tender Document and it
shall be applicable.
11. TENDER FOR WORKS to be read as given in tender documents / Tender Form.
12. MEMORANDUM to be read as per the details given in tender notice
13. The contents / details / information mentioned in the following CLAUSE under the heading
“TERMS AND CONDITION OF CONTRACT” shall be read as under-
▪ Clause 1: Security Deposit: to be read as per the details given separately elsewhere in the
tender documents.
▪ Clause 2: Liquidated Damages for delay: to be read as per the details given separately
elsewhere in the tender documents.
14. Clause No. 14.2, 21, 38, 60, 69, 73, 74, 75 shall be read as deleted in the form B-1.
Seal and Signature of the Bidder Addl.City Engineer
Date: (North Zone)
AHEMDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
GENERAL CONDITION
1. After sanction of tender a Letter of Intent shall be issued to contractor and in response to that letter,
contractor shall have to arrange for Security Deposit within 15 days. If S.D is given within 10days of
issuance of Letter of Intent, time limit shall be counted from that date. If S.D is given after 15 days of
issuance of letter of intent, contractor shall be finned Rs. 200/- per day of delay and shall be
deducted from contractor’s bill. In this case time limit shall start latest by the 10th day of letter of
intent, Security Deposit of 5% of tender amount shall be deposited by pay order, demand draft,
cheque of nationalized bank /scheduled bank by pay order, demand draft, cheque of nationalized
bank/scheduled bank only. Contractor shall have to sign contract paper with AMC.
2. In case of earnest money cheque bounce back, contractor’s tender shall treated as cancelled and the
contractor shall not be given any tender, offer, quotation work in AMC for one year.
3. Conditional tender shall not be accepted
4. Tender validity period is 120 days from the date of opening of tender
5. Muni. Commissioner shall have right to accept, reject the tender as well as the rate at which tender
to be accepted and awarded.
6. Specification of tender items shall be as per PWD manual in general/AMC’s norms and B-1 form
conditions shall be applicable. In case of controversy, Add.C.E’s decision shall be final.
7. Contractor shall have to deposit Earnest Money deposit with tender.
8. Work shall be allotted as per contractors registration class.
9. Contractor shall have to work in such a system that there shall be no damage to any service line of
electric, telephone, gas, any type of service cable ,drainage or water lines etc. In case of damage to
service line, the whole responsibility of accident shall be on contractor’s shoulder. It will be
responsibility of contractor to safe guard the labours against any accident or damage of lives. In case
of police complain, Contractor shall be held responsible for negligence. In case of soil /land collapse,
contractor shall be held responsible for not supporting the soil suffering with strutting, shuttering
Contractor shall safeguard the labour before allowing the labour to enter in excavated or other site.
In case of accident to labours, contractor shall be held responsible for police complain against him.
AMC’s staff shall be responsible for any accident at the site of the work.
10. Contractor shall take insurance of his all labour. and supervisory staff
11. Only registered contractor shall quote the tender , If the contractor is registered with government
then they shall have to apply to registration in AMC within 90 days from the date of work order.
12. AMC’S general condition and Form -B-1 shall be binding to the contractor B-1 Form is put up on
AMC’s web site.
13. Payment of running bill , final bill shall be as per policy of AMC in force at time of payment
14. Any time of litigation shall be in court of AMDAVAD city jurisdiction only.
15. As per site conditions/requirement of site, there shall be increase or decrease in tender item
quantities. In such case contractor shall not have right to any price rise. In case of decrease in any
tender item quantity, contractor shall not ask for compensation.
16. If any construction material brought to site by contractor , is not as per specification, or any inferior
quality material brought to site, then such rejected material shall be removed from the site within
hours, otherwise AMC can throw away such material at any place and recover the amount for such
removal work from contractor bill. In this case contractor shall not be entitled for compensation.
17. Cost of testing of material shall be done by the contractor. He shall provide vehicle for taking
material/staff from site to testing laboratory/ manufacturing site and contractor shall be bear the
cost of transportation of staff and material.
18. Contractor shall work as per labour Act. Contractor shall not be given any payment if labour act
rules are not followed or insurance of labour is not taken for work
19. Contractor shall deposit the material on site in such a way that it should not become obstruction to
any one in any way
20. All type of taxes(e.g. sales tax, surcharge, vat etc) to be by the contractor.
21. If asked by AMC Engineering staff, contractor shall take photograph of site of work/before start of
work, during work and after the completion of work, with digital camera and deposit to AMC office or
transfer photograph from camera to AMC computer. No additional cost shall be paid.
22. In case of cancellation/rejection of tender, contractor shall not be entitled for any compensation Or
23. In case of extra item, rate shall be taken from SOR of the year of tender preparation. If item is not
available in SOR, then market rate shall be derived by the Eng. dept by rate analysis. Contractor shall
not ask for the rates as per his rate analysis. This should be clearly understood and taken in to
consideration while quoting the tender by the contractor.
24. During execution of work, contractor shall take safety measures like protection by ropes, drums,
danger sign boards, plastic strips, bamboos, wooden poles etc as per requirement & instruction of
Engg.- in- charge. In case of accident due to lack of protection, contractor shall responsible for police
complains, compensation etc AMC staff shall not be held responsible for contractors negligency.
25. If instructed by AMC officials, contractor shall have to keep daily progress register and get is signed
by Ass. city Engineer. Contractor shall maintain record of daily No. of labours, employed, work done,
rectification work carried out by contractor after Eng.-in-charge inspection & the compliance of the
same. If such rectification work is not done by contractor within 24 days the contractor shall be
finned Rs. 250/- day of delay & shall be recovered from the contractors bill
26. Contractor is not entitled for any type of compensation or right for the cancellation of tender or
tender items by any means.
27. If work is not completed within specified time limit penalty shall be recovered from bills as per
tender condition.
28. Deduction from bills shall be done as per rules prevailing or the rules which shall come in to force, by
State or Central Govt.
29. 1% amount shall be deducted for labour welfare fund as per state Govt order.
30. Quantity in item is tentative. It is likely to be change.(increase or decrease) as per site requirement
during execution of work.
31. All above conditions shall over rule the conditions given in Form B-1
32. Contractor shall have to register the work as per labour act & as per building safety act, 1906 with
,Dy.Director building safety act, Shram bhavan, 5th floor labour commissioner office, Khanpur,
33. Befor quoting tender, contractor shall have to take complete information of the work after seeing
site and from the concerned Asst. Engineer or Asst. city engineer.
34. In case of the bank detail are not given then EMD return procedure shall be delayed.
35. Before quoting the tender contractor should know that, he has seen the site & understood the item
of works, site conditions. He should be in a position to provide labours at the time of festivals like
Holi, Diwali, Navratri, Marriage season, rainy season or any other time of the year Contractor can not
say that he has no labours due to festivals.
36. In case progress is delayed, contractor shall be penalized 0.10% of Tender amount per day for work
done after time limit, maximum up to 10% for remaining value of work.
37. As per Cicular No- 41 Dt.09.11.2021 E Form Certificate Required.
38. Contractor has to follow Finance Circular NO-38, Date:- 21.11.2022
39. As per AMC’s Finance department Crcular No.38, Dt.21/11/022 and approval of competent
authority, rate of all the items are taken without GST and prevailing GST will be payable
40. All the relevant prevailing AMC circulars/ its time to time revisions are applicable for this work
and all the bidders are bound to follow the same, so the bidder must check before applying for
I have read all above conditions carefully and ready to work as per above conditions.
Seal and Signature of the Bidder Addl.City Engineer
Date: (North Zone)
ybœtJtœ BgwÂlÂmvj ftuvtuohuNl
bntldh muJtmœl- W•th Ítul
y.Bgw.ftu. W•th Ítul Ítulj ytuVem,
W•th Ítul xuLzh ltuxem lk- 18/2025-26 btk ytJhe juJtguj ftbtule ÂJd<tu
1. Wvhtuf< xuLzhtu su <u Jdobtk btLg hSMx[uNl ^htJ<t ftuLx[tfxh©eytuyu ChJt.
2. xuLzhle rlg< xuLzh Ve <&t R.yub.ze. ck^ fJhbtkk Wvh lt mhltbu ÁcÁ / hSMxh yu.ze./ MvezvtuMx/
fwhegh&e rlg< mbgbtk btufjJtlt hnuNu.
3. ftuLx[tfxh©eytuyu xuLzhle mt&u BGþrlrmvj btLg hSMx[uNlle/ dJobuLx hSMx[uNlle ftuve, (xuLzh ftuve <&t
yLg vwhtJt mt&u) yawf mtbuj fhJtle hnuNu ylu fJh Wvh xuLzh lkch <&t ftuLxufx lkch sYh MvÐ
œNtoJJtltu hnuNu.ck^ fhJh Wvh xuLzh ltuxem lkch, xuLzh lkch, ftblwk ltb <&t, ftuLx[[tfxhle mkM&tlwk ltb
<&t ftuLxufx lkc< yJ~g œNtoJJtlt hnuNu. su ftuLx[tfxh©eytuyu hSMx[uNl heLgw fhtJuj l ntug <u
ftuLx[tfxh©eyu xuLzh ChJt lnek.
4. ftuLx[tfxhtuyu xuuLzhbt cukfl wltb, Ft<t lkch, btRfh lkch ylu mhltb wMvÐ yûthtubtk jFJw.
5. xuLzh Ve vu ytuzoh / zebtLz z[tVx&e aqfJJtlehnuNu. œhuf xuLzh œeX yjd xuLzh xuLzhVe ChJtle hnuN.u
6. ytuAe hfble xuLzh Ve, R.yub.ze. fu xuLzh Ve, R.yub.ze. ÂJltlt xuLzhtu hœct<j (fuLmj) dKtNu.
7. xuLzh mt&u BþfJtbtk ytJ<e yluoMxble, xuLzhle hfblt 1% «btKu cukf duhLxe / zebtLz z[tVx / vu ytuzoh / jtufj
btRfh auf&e s MJefthJtbtk ytJNu. œhuf xuLzh œeX yjd R.yub.ze. ChJtle hnuNu. R.yub.ze. hfb Yt.
yuf fhtuz mwDele ykœtS< hfblt ftb btxu htufzt, jtufj btRfh auf, rzbtLz z[tVx, vu ytuzoh fu cukf duhkxelt
MJYvbtk <&t Yt. yuf fhtuz&e Wvhle ykœtS< hfblt ftb btxu R.yub.ze.le hfb btºt rzbtLz z[tVx, vu
ytuzoh fu ckuf duhkxelt MJYvbtk ytvJtle hnuNu.
8. cukf duhuLxe btºt ybœtJtœ Nnuhle s MJefthJtbtk ytJNu.
9. xuLzh Ve <&t R.yub.ze.le hfblt ze.ze./ aufle vtA¤ ftuLx[tfxh©eyu vtu<tle mkM&tlwk ltb <&t btuctRj
lkch yJ~g jFJtltu hnuNu.
10. Nh<e xuLzhtu hœ ct<j dKtNu.
11. stu xuLzhbtk MvÐ WÕjuF fhtguj ntug <tu atubtmtlu fthKu Ft<tfeg MËalt yLJgu ßgthu ßgthu ftb ck^ htFJtLþk
&tg <u mbglu ftble BþÆ<btk bshu ytvJtbtk ytJNu. vhkðþ yt yLJgu ftuE CtJ J^thtu ytvJtbtk ytJNu
lne. sule ltuk^ xuLzhhu juJe.
12. xuuLzhtu ftuEvK fthK ytÃgt rmJtg MJefthJt fu lrnk MJefthJt <ule mkÃËKo m•tt BGþrlrmvj frbNlh©ele
13. xuLzhbtk stu ftuR mwDtht JDtht ntug <tu <u ykd xuLzh Ch<t vnujt AuÕju œJmu rlg< JucmtRx y&Jt fauheyu
sYhe <vtm fhelu s xuLzh btufjJw.
14. mefgtuhexe zevtuÍex/ vVtuboLm duhuLxele hfb Yt. yuf fhtuz mwDele ykœtS< hfblt ftb btxu htufzt, jtufj
btRfh auf, rzbtLz z[tVx, vu ytuzoh fu cukf duhkxelt MJYvbtk <&t Yt. yuf fhtuz&e Wvhle ykœtS< hfblt ftb
btxu mefgtuhexe zevtuÍex/ vhVtuboLm duhkxele hfb btºt rzbtLz z[tVx, vu ytuzoh fu ckufduhkxelt MJYvbtk
15. ytuljtRl yul-«tufgwh JucmtRx vh&e ChJtlt &<t xuLzhbtk ftuLx[tfxh/ yusLmeyu xuLzhle ntzo ftuvebtk CtJ
Cgto Jdhle mne mefft fhe mcbex fhJtle hnuNu. stu <ubtk CtJ Chuj nNu <tu <uJt xuLzh hœ fhJtbtk ytJNu.
16. mœh xuLzhle ytRxbtult CtJtu ltKt Ft<tlt mhfgwjh lk.38, <t.21/11/2022 <&t mûtb m•ttle b¤uj
bkswhe bwsc GST rmJtg dKºtebtk juJtbt ytJuj <&t «Jo<btl rlgb bwsc GST awfJJt vtºt &Nu su&e <btb
cezomu <u bwsc dK<he fhe xuLzhtu ChJtlt hnuNu.
17. mœh xuLzh yk<od<lt ftb mkjøl y.Bgw.ftu.btk v{Jo<btl <btb rlgbtu/mhfgwjhtu jtdw vzNu <ubs JF<tu
JF< <h mw^thtytu vK jtdw vzNu. sule ltuk^ jR xuLzhtu ChJtlt hnuNu.
zebtLz z[tVx / auf “Bgwrlrmvj frb§h©e, ybœtJtœ” lt ltbltu fZtJJtu.
xuLzhhle mne ylu rm¬tu yuze.mexe Rsluh
AHEMDABAD MUNICIPAL CORPORATION
Section II - CONDITIONS OF PARTICULAR APPLICATION
1. The selection process will lay high emphasis on the ability and competency of contractors to do
high quality work within the given time schedule.
2. The onus of providing, all necessary company / project related information, in appropriate
manner and medium, so as to demonstrate the competency of the bidder and to allow proper
evaluation, will rest entirely on the Bidder.
3. All information has to be typed or hand written legibly. All pages of the Bid have to be Initialed
4. ALL INFORMATION HAS TO BE SUBMITTED IN THE PRESCRIBED FORMAT ONLY.
Projects for which incomplete information has been provided will not be considered for
evaluation. The Bidder may attach separate sheets if so required. However, the final bound
document submitted, has to be submitted in vertical A4 size (210 mm X 297 mm) except Vol. V.
5. The scope of work, project description mentioned in the document is indicative and is likely to
change during detail design. Project brief, along-with the schematic drawings and colored
photographs, is provided to assist the bidder in understanding the fundamental and specific
requirements of the project.
6. Conditional tenders will not be accepted.
7. AMC’s decision for selection or rejection of the offers shall be final and binding to all.
8. Bidder should provide information as mentioned in the prescribed forms.
Information other than that related to this work shall not be considered for evaluation.
9. If AMDAVAD Municipal Corporation is convinced that the Bidder has resorted to material
misrepresentation or provided fraudulent information / statement, the said Bidder will be liable
for disqualification / rejection at any stage.
10. Proof for fulfillment of eligibility criteria should be submitted along with Tender volume. If the
Tender volume is submitted without valid documents and without proof of eligibility criteria will
11. Those who do not meet with the eligibility criteria need not submit the Tender document.
12. Tenders, which do not fulfill all or any of condition or are submitted incomplete in any respect or
are conditional tenders, will be rejected.
13. Municipal Commissioner reserves the rights to reduce/ increase the scope of work and contract
without assigning any reason thereof.
14. DEFECTS: For completion of any work/ part thereof, contractor will be required to request in
writing, to get completion certificate from Additional City Engineer . Date of completion for start
of defect liability period will be considered as the date mentioned in the completion certificate.
The contractor shall be required to make good all the damages / defects identified and
conveyed to him, during the entire defect liability period. The method and time limit of
rectification will be decided by the Engineer in charge. If he fails to carry out rectification as
per the instructions, the same will be carried out at his cost and it shall be recovered from the
amount retained.
15. All the material and other test expenses shall be borne by the contractor. Contractor shall have
to provide vehicle and other communication facilities to visit plant and testing laboratory.
16. Contractor shall have to make his own arrangements for water and electricity for the purpose of
construction work at site at his own expense.
17. If the contractor fails to execute the said works within prescribed time limit, the said work will be
carried out at the risk and cost by other contractors with 20 % supervision charges as may be
decided by the Additional City Engineer.
18. Safety and Signage
Contactor has to arrange for the complete safety of the persons working for project, users of the
road i.e. public and vehicles also. All the arrangements of traffic drums, metal / fiber cones,
traffic blinkers, traffic signs as per design, safety tapes etc. to be arranged at site. Necessary
florescent marking on traffic signs to be provided so that it should be visible at night. During
night working hours safety in charge personnel shall be provided with florescent jackets.
The Contractor has to make all the necessary arrangements for making all the temporary
diversions for proper working at site including traffic signage, safety cones, traffic blinkers,
barricading tapes, red and green flags/lights etc for making easy smooth and safe conditions
for the traffic. The Contractor shall and must provide above at his own cost. If the Contractor
fails to comply this clause, Rs. 500/- per day shall be recovered from his bill.
19. Tax, Duties on Materials
All charge on account of Octroi, excise duties, terminal tax, sales tax. Service tax, VAT,
govt.duties etc. on material procurement or any other component for the works from any source
shall be borne by the contractors.
20. Submission of project schedule:
Contractor has to submit the following documents along with the qualification data of the tender
failing in which shall lead to rejection of the tender.
Contractor shall submit the detailed Project schedule showing break up for the various tasks to
be performed in order of their occurrence during the project in Microsoft Project/Prima Vera
21. For Flakiness and Elongation Index norms adopted by AMC shall be made applicable.
22. For non-bituminous, bituminous and concrete works, the black trap aggregates of required size
shall be procured from quarry situated in Sevaliya / Timba region or equivalent. Prior approval of
source/ material by Additional City Engineer shall be required.
23. Contractor shall be responsible to obey all Labour Laws, Environmental and Safety Laws.(the existing
laws as well as framed from time to time). Any penalties laid due to violation of such laws shall be
directly deducted from the contractor's outstanding. .
24. As per St. Committee's resolution 0.5% testing charges shall be deducted from each R.A.Bill and the
amount of actual Testing charges shall be adjusted in the final bill.
25. Special Clause: As per construction works welfare cess Act – 1996 non-refundable one percent of
tender amount shall be deducted against works welfare cess.
Seal and Signature of the Bidder Addl.City Engineer
AHMEDABADMUNICIPALCORPORAT
IONENGGNIERINGDEPARTMENT
GENERALSPECIFICATION
Time limit for the work shall be 12 month (Excluding monsoon) after the order to start the works. Progress of work
should be in proportion to time limit.
The contractor shall be remain responsible for Workmen’s compensation if any accident. The contractor shall
arrange for barricading at night and arrangement of Pagi at night to direct the traffic. He shall be responsible for any
damage to public. If any incident happen, during the execution of work. In case of dispute for unseen or overlooked
items the decision of the Dy. City Engineer shall be final. The contractor shall have to give site clean of all rubbish
during the work and at the time of completion of work and hand over the site with final finishing of the work as
directed. All the rejected materials shall be removed from site within 24 hours by contractor at this risk and cost.
Debris shall have to cart daily from site.
For mixing mortar either for masonry or for plaster or for any other purpose contractor shall have to prepare
through of bigger size and mix the mortar in the required proportion. In on case he shall be allowed to mix the
mortar either on floor or any finished surfaces. The contractor shall have to make his own arrangement for water
required for the work.
If any extra item crops up during the progress of work the same shall be carried out by the contractor and he shall be
paid at the rate fixed by Add.C.E. as per the rate analysis based on latest SOR or if item is not available in SOR than
based on current market rates. In case of extra item decision of Add. City Engg. shall remain final regarding rate.
If in the interest of the Corporation it is necessary to change either any site or the design of the propose work the
contractor shall carry out the same at his quoted rates without charges any extra and the contractor will have to
carry out the works and he will be paid at the rate quoted by him. No claim for extra rate for subsequent changes in
site and design is entertained.
The cubical contents of the cement bag shall be taken as 1-20 cft. Per bag and the contractors shall have to prepare
the measures boxes according to this measure.
Octroi exemption passes shall not be given for any materials required for the work. Contractor will be fully
responsible for compliance of the various provisions under contract Act. 1970 and the Rules framed the to under.
The tender for the work shall remain open for a period (90) days from the date of opening of the tenders for this
work and that the tenderer shall not be allowed to withdraw on modify the offer on his own during the period. If any
tenderer withdraw or makes any modifications or addition in the terms and conditions of his tender not acceptable
to the Municipal Corporation the Municipal Corporation shall without prejudice to any right or remedy be at liberty
to forfeit in full the said earnest money and black list the contractor.
If the work is not carried out within the specified time limit. from the date of order to start the work the penalty of
Rs.- (As per Form - B1) per day of delay shall be recovered from the immediate bills payable to the contractor.
Contractor has to make his own arrangement for procurement of steel and cement.
Contractors should note the following conditions carefully:-
1. Conditional tender shall not be accepted.
2. All tenders are to be submitted in duplicate without which the tenders are liable to be rejected.
3. In case of tender downloaded from website, tender fee & EMD should be submitted in form of demand draft or
4. Condition of Form - B1 Standard Specification of material & code of practice will be applicable. Form B1 can be is
available in website. Specification shall be as per ' R& B Dept. - Govt. of Gujarat booklets of Building Works &
and Road Works Specifications published by Gujarat Book Depot, Sector-21. Gandhinagar.
CONTRACTOR'S SIGNATURE Addl.CITY ENGINEER
& STAMP (North Zone)
AHEMDABAD MUNICLPAL CORPORATION
MAHANAGAR SEVA SADAN
Clause : 1 Contractor shall not employ any child having age 5 to 15 years as it is prohibited by Child Labour
Prohibition and Regulation Act 1986. Hon'ble Supreme Court has given certain guide lines and as per the
guide lines. If child labour is employed on the site work, the contractor shall have to deposit Rs.
(Rupees Tw enty thousand only) in the child labour welfare fund. If the employer refuses to deposit then
action will be taken for contempt of Supreme Court Judgement and also will be prosecuted by concerned
authority. Because of the breach of any provision of child labour prohibition and regulation Act 1986 by the
Contractor & Municipal Corporation becomes liable to pay any amount then the Municipal Corporation shall
recover the said amount from the contractor.
Clause : 2 The Standing Committee has decided to deduct 1/2% amount from each running bill as per its
Reso. No. 1783 Date 06--02-97, but the Municipal Corporation Board has recently decided that the actual
testing charge is taken and the remaining amount is refundable at the time of final bill (As per Muni. Board
Reso. No. 123 dated 25-02-97)
Clause : 3 Contractor has to follow prevailing Labour act and has to maintain labour register acordingly,and
has to follow other govt.rules.
Clause : 4 Quantity taken in tender are tentative and may differ as per execution of work. No claim shall be
entertain regarding QUANTITIES.
* MODIFICATION OF DOCUMENTS
Modification of specifications and correction/corrigendum in respect of the work if required will be made by
A.M.C. The same shall be placed on A.M.C website which may be downloaded by the tendrers enclosed along
with the tender duly signed. These shall form a part of tender. The tenderer shall not add or amend the text
of any of the documents except in so far as may be necessary to comply with any addendum.
* ADDENDAUM/CORRIGENDUM .
Addendum or corrigendum conveying any change or correction in respect of the work shall form the part of
the contract documents. The full consideration shall be given to such addendum or corrigendum or
correction before submission tender duly filled in by the contractor. Therefore, the contractor shall have to
watch such addendum or corrigendum or correction published by A.M.C through its website
www.egovamc.com. Tenderes shall verify the number of addendum issued and enclose the same with the
tender documents,failing which the tender shall be liable for rejection and no any complaint in respect to this
shall be entertained under any circumstances.
CONTRACTOR'S SIGNATURE Addl.CITY ENGINEER
& STAMP (North Zone)
TECHNICALSPECIFICATIONS
SPECIFICATIONS OF MATERIALS – CIVIL
This section gives detail specifications for mainly used materials, for other materials refer Building
Specifications.
For materials relevant specification of Building Specification shall apply.
❖ General Technical Specification Section
Following technical specifications shall be applicable to the relevant items of BOQ
Name of work:-. Rectifying of Damage Existing Drainage line and breakdown reparairing work by
construction of RCC chamber with using sinking method for removing choking of drainage main line
at Laxminagar main road and Diff.Road in Kubernagar at North Zone. (ARC tender)
GENERAL AND STANDARD TECHNICAL SPECIFICATIONS FOR WORK.
1 In the specifications “as directed” / “ approved shall be taken to means "'directed” / “approved”
by the Engineer-in-charge.
2 Wherever a reference to any Indian Standard appears in the specifications, it shall be taken to
mean as a reference to the latest edition of the same inforce on the date of agreement.
3 In“Mode of Measurement”in the specification wherever a dispute arises in the absence of specific
mention of a particular point or aspect, the provisions on these particular points or aspects in
the relevant Indian Standards shall be referred to.
4 All measurements and computations, unless otherwise specified, shall be carried out nearest to
the following limits:
(i) Length, width and depth (height) 0.01 meter.
(ii) Areas 0.01 Sq. Mt.
(iii) Cubic Contents 0.01 Cu. Mt.
In recording dimensions of work, the sequence of length, width, and height (depth) or
thickness shall be followed.
5 The distance which constitutes lead shall be determined along the shortest practical route and
note necessarily the route actually taken. The decision of the Engineer-in-charge
in this regard shall be taken as final.
6 Where no lead is specific, it shall mean “all leads".
7 Lift shall be measured from plinth level.
8 Up to “floor two level” means actual height of floor (Maxi. 4 M) up to 3 Mt. Above plinth level.
9 Definite particulars covered in the items of work, though not mentioned or included in it
specifications shall be deemed to be included therein.
10 Reference to specifications of Materials as made in the detailed specification of the items of works
is in the form of a designation containing them number of the specification of the Materials and
prefix ‘M’ e.g. "M-5"
11 Approval to the samples of various Materials given by the Engineer in charge shall not absolve the
contractor from the responsibility of replacing defective Materials brought on site or Materials used
in the work found defective at later date. The contractor shall have no claim to any payment or
compensation whatsoever on accounts any such Materials being rejected by the Engineer-in-
12 The contract rate of the item of work shall be for the work completed in all aspects.
13 No collection of Materials shall be made on site before it is got approved from the Engineer-in-
14 Collection of approved Materials shall be done at site of work in a systematic manner. Materials
shall be stored in such manner as to prevent damage ,deterioration of intrusion of foreign matter
and to ensure the preservation of their quality and fitness for the work.
15 Materials , if and when rejected by the Engineer - in - charge, shall be immediately removed from
the site of work.
16 No Materials shall be stored prior to, during and after execution of a structure in such a way as to
cause or lead to damage or overloading of the various components of the structure.
17 All works shall be carried out in a workman like manner as per the best techniques for the
particular item.
18 All tools, templates, machinery and equipment for correct execution of the work as well as for
checking lines, levels, alignment of the work during execution shall kept in sufficient numbers and
in good working condition on the site of the work.
The mode, procedure and manner of execution shall be such that it does not cause damage or
19 overloading of the various components of the structure during execution or after completion of the
20 Special modes of construction not adopted in general Engineering practice, if proposed to
be adopted by the Contractor, shall be considered only if the contractor provides satisfactory
evidence that such special mode of construction is safe, sound and helps in speedy construction
and completion of work to the required strength and quality. Acceptance of the same by the
Engineer- in- charge shall not, however, absolve the contractor of the responsibility of any adverse
effects and consequence of adopting here in the course of execution or completion of the work.
All installations pertaining to water supply and fixtures thereof as well as drainage lines and
21 sanitary fittings shall be deemed to be completed only after giving satisfactory tests by the
22 The contractor shall be responsible for observing the rules and regulations imposed under the “
Minor Minerals Act ”, and such other laws and rules prescribed by Government from time to
23 All necessary safety measures and precautions (including those laid down in the various relevant
Indian Standards) shall be taken to ensure the safety of men, Materials and machinery on the
works as also of the work itself.
24 The testing charges of all Materials shall be borne by the Contractor.
25 Approval to any of the executed items for the work does not in any way relieve the contractor of his
responsibility for the correctness, soundness and strength of the structure as per the drawings
and specifications.
I HAVE ALSO GONE THROUGH TECHNICAL SPECIFICATIONS FOR THE ITEMS (AS PER
STANDARD GWSSB. TECHNICAL SPECIFICATION FOR THE ITEMS AND ALSO I HAVE THE
BOOK OF THE SAME) AND AGREE TO ABIDE BY THEM.
IN CASE OF WHERE IS NO TECHNICAL SPECIFICATION FOR THE ANY ITEMS
AVAILABLE, SPECIFICATION GIVEN BY THE ENGINEER-IN-CHARGE SHALL BE FOLLOWED
AND FOR THE SAME I AGREE TO ABIDE BY THEM.
Conctractor's Signature Addl.City Engineer
Address & Mobile no. ( North Zone)
Yours faithfully,
Contractor's Signature Addl. City Engineer
& Stamp (North Zone)
AHEMDABAD MUNICIPAL CORPORATION
FORM OF BID AND APPENDIX TO BID
FORM 1 - BID SECURITY (BANK GUARANTEE)
(Hereinafter called the Tenderer) is desirous and preferred to tender for works in accordance with the term and
conditions of tender for the work of
Rectifying of Damage Existing Drainage line and breakdown reparairing work by
construction of RCC chamber with using sinking method for removing choking of drainage
main line at Laxminagar main road and Diff.Road in Kubernagar at North Zone. (ARC
1. Therefore. We hereby affirm that -we are guarantors on behalf of the Tenderer up to total
rupees………………..(in words............................................) Rs. (in figures) and we undertake to pay to Municipal
Commissioner, AHEMDABAD Municipal Corporation, A'bad. Specified tip to his first written demand, without
demur without delay and without the necessary of a previous of judicial or administrative procedures and without
the necessity of a previous of judicial or administrative procedures and without the necessity to prove to the Bank
the defects or short comings or debits of the contractor any sum within the limit of
2. We further agree that the Guarantee herein contemned shall remain in full force and effect during the period
that would be taken for the acceptance of tender. However unless a demand of claim under this guarantee is made
on its in writing on or before the (Date to be specified will not be less than 180 days from the stipulated date of
receiving the tender) we shall be discharge from all liabilities under the guarantee thereafter
3. We undertake not to revoke the guarantee during it currency except with the previous
consent of the Municipal Commissioner, AHEMDABAD Municipal Corporation, A' bad in
4. We lastly undertake not to revoke the guarantee for any charge in constitution of the
Tenderer or of the Bank.
Signature & Seal of Guarantor ...........................
5. The contractors shall have to furnish income tax clearance certificate before his tender is accepted and intimate
assessment number and ward under which he is assessed.
6. Copies of certificate as regards previous experience, if any, must accompany the tender.
7. List of approved banks As per ANNEXURE –
Seal and Signature of the Bidder Addl. City Engineer (N.Z)
FORM -2 PERFORMANCE GUARANTEE BOND
(BANK GUARANTEE)
(Clause 37 of Section I Volume 1)
Awarded a contract dated_ __________________FOR
Rectifying of Damage Existing Drainage line and breakdown reparairing work by
construction of RCC chamber with using sinking method for removing choking of drainage
main line at Laxminagar main road and Diff.Road in Kubernagar at North Zone. (ARC
tender)Whereas the said M/s _________________________________________has approached Us
___________________________________________Bank to provided a PERFORMANCE GUARANTES BOND to the AMC for
the work undertakes by M/s.
________________________ and Whereas. We, the _____________________________Bank have agreed to
provided such a PERFORMANCE GUARANTEE BOND. Now therefore, we the_ ______________________Bank
provided the following Performance Bank, Guarantee by way of these Bond to the AMC.
1. The contract value of the contract provided to M/s. _____________________by the AMC in Rs. _ __________.
This guarantee in the nature of PERFORMANCE GUARANTEE is provided so as to ensure and indemnify the AMC for
full and proper performance of the contract by M/s.______________________
the _______________________________Bank hereby indemnify the AMC for all losses and / or damages to the
road surface which would be laid or resurface by M/s.________________________ and such PERFORMACE
GUARANTEE would include any damage to hot mixes, dense bituminous macadam asphalt, concrete, seal coat,
concrete blocks, road markings, signage, steel structures which may be suffered by the AMC as a result of defective
production of mixes, because of poor workmanship, or at all, by way of this bond, we the
_________________________________Bank agree and promises that in the eventuality of the contractors M/s.
__________________________________________not repairing or remeding the Problem, loss or damage to the
road surface we shall indemnify and pay the AMC such expenses, losses and damages that may be incurred by the
AMC, as a result of the AMC getting the work done itself or from the other source.
2. We _______________________________ Bank agree and understand that the decision as to whether any losses
or damages to the project have taken place or not and / or whether the work suffers from poor workmanship or
not will be taken by the Commissioner of AMC and on the Commissioner's decision regarding such losses or
damages or defect whatsoever being so notified by the AMC to us, We shall immediately take steps and ensure
that M/s.__________________________________ faithfully and diligently carry out the necessary remedial steps
to the full satisfaction of the Commissioner of the AMC. The opinion of the Commissioner as to whether full and
complete remedial steps, to the full satisfaction the Commissioner of the AMC has been taken or not, will be that
of the AMC. For the purpose, of arriving at such decision as aforesaid it will be open to the Commissioner of the
AMC in case he so desires, to delegate this power to subordinate like the city Engineer to take appreciate decision
and the decisions referred to above will be deemed to be properly take and as if taken by the Commissioner of the
AMC. In the eventually of M/s.______________ not taking remedial action to the almost satisfaction of
the Commissioner of AMC. The AMC will be entitled to get the work done itself or from sources. On the
Commissioner of the AMC notifying to us the total expenses incurred for this purpose. We hereby expressly have
under taken to pay the AMC the said amount forth with and in any case not less than 7 days from taken to pay the
AMC the said binding the amount indicted by the Commissioner of the AMC and our obligation to pay such amount
will be continuing of the AMC and our obligation irrespective of any dispute of differences that may arise between
us and M/s. _____________________________ of between the AMC and M/s.
3. The contract value is Rs. __________________________. This PERFORMANCE GURANTEE is limited to 5% of the
said contract value and accordingly it comes to Rs. _______________________ our liability will be in all cases be
limited to Rs._________________.
4. We agree and undertake that this PERFORMANCE GURANTEE will be valid for a period of five years and one
month from the date when the contract work is completed by the
M/s._____________________________________. The Commissioner of the AMC notify such completion that to
us. In case, no such completion it is notified, this performance guarantee will be a valid from five years from the
date of execution of this agreement. The Performance Guarantee will come into effect from such completion date.
In case however, the contract of several parts it will be opened to the Commissioner to indicate separate
completion dates for separate part and to simultaneously indicate a break up of the contract value equivalent to
the separate part. In which case the PERFORMANCE GUARNATEE to extent of the different completion dates. It is
expressly understood that the considering this period of five years and one month, the date by which the
Corporation, intimate the Bank about the losses, damages or problems as the case may be, shall be considered as
long as such intimation is within a period of five years and one month from the completion date. We the
___________________ Bank will be liable, irrespective of whether the remedial actions or lack thereof has taken
place after the period of the five years and one month.
5. We _________________________________ Bank agree that the PERFORMANCE GUARANTEE which is
continuing guarantee will be binding, and enforceable against us irrespective of any difference / disputes between
the AMC and M/s. __________________________of between us and M/s._________________________
and irrespective of any change or variation or execution time or any forbearance or waiver made or grant by the
6. In case any disputes arise as to the interpretation or implementation or implementation of this PERFORMANCE
GUARANTEE, the matter shall be referred to the sole arbitration of he Commissioner of AMC whose decision in the
matter will be final. In case any resource to any court of law is necessitated, the appropriate Civil Court in the
AMDAVAD along will have Jurisdiction.
Date: Signature of Contractor
FORM-3 FORM OF AGREEMENT
THIS AGREEMENT made the ____ day of _______, 20__ between AMDAVAD Municipal Corporation
………………..(here in after called “the Employer”) of the one part and
called “the Contractor”) of the other part.
WHEREAS the Employer is desirous that certain works should be executed by the Contractor, viz.
____________________________________________ and has accepted the bid by the contractor for the execution
and completion of such works and the remedying of any defects therein at a contract price of Rs.______________
NOW THIS AGREEMENT WITNESSETH as follows:
1. In this Agreement, words and expressions shall have the same meanings as are respectively assigned to them in
the Conditions of Contract hereinafter referred to.
2. The following documents shall be deemed to form and be read and construed as part of
this Agreement, viz.:
a) The Letter of Acceptance;
b) The General Conditions
c) The Financial Condition
d) The Technical Specifications;
e) The Priced Bill of Quantities; and
f) Other documents forming part of the contract.
3. In consideration of the payments to be made by the Employer to the Contractor as here in after mentioned, the
Contractor hereby covenants with the Employer to execute and complete the Works and remedy any defects
therein in conformity in all respects with the provisions of the Contract.
4. The Employer hereby covenants to pay the Contractor in consideration of the execution and completion of the
Works and the remedying of defects therein the Contract Price or such other sum as may become payable under
the provisions of the Contract at the times and in the manner prescribed by the Contract. IN WITNESS whereof the
parties hereto have caused this Agreement to be executed the day and year first before written.
Signed, sealed, and delivered by the said Employer and the Contractor in the presence of:
On behalf of AHEMDABAD Municipal Corporation On behalf of M/s.
Binding Signature of the Employer:
Binding Signature of the Contractor:
*Sample Form for updating - qualification information*
mkœCo: (1) ©b ylu htusdth htsgbkºte©e - lJe rœÕnelt vrhvºt ¢btkf C-III /011/2(82)2015/HQ
(2) fboathe CrJ»g rl^e mkdXl- lJe rœÕnelt vrhvºt ¢btkf CIAU/011(33)2015/HQ/5345
(3) ©b ylu htusdth rJCtd-dtkDeldh vrhvºt ¢btkf: RveyuV/182016/368596/b(3)
Cth< mhfth©elt ©b ylu htusdth bkºttjg-lJe rœÕne ylu fboathe CrJ»g rlr^ mkdXl
(R.ve.yuV.ytu.) lJerœÕneyu <ublt ylw¢bu <t.07/07/2015 ylu <t.21/06/2016lt vºttu&e
mhftherJCtdtu, mhftherldbtu <ubs htsgle mnfthe mkM&tytu ylu ctuzeytubtk ytWxmtumo&e ftb fh<tk bnufblu
mtbtrsf mwhûttlwk Aºt b¤e hnu <u btxu <ublu ftbœth CrJ»g rlr^ ylu vhawhK studJtRytult yr^rlgb,1952
nuX¤ ytJhe juJt sKtJuj Au.
yt ylwmk^tlu htsg mhfth©e lt mJuo rJCtdtu, ònuhrldbtu, htsgle mnfthe mkM&tytu, MJtg< mkM&tytu
ylu MJhtsgle mkM&tytubtk ytWxmtumeod yusLmeytu îtht ytWxmtumeod&e ftb fh<t, ftuLx[tfx
fboatheytu,htusbœth <&t mhfth©elt ftb btxu rVfm vdthu hFtgujt <uJt «ðguf fboathe fu sublu ftuR vK
yr^rlgb yk<do< mtbtSf mwhûttlt jtCtu b¤<t l&e <uJt fboatheytulu CrJ»g rlr^ Vt¤tu yaqf fvtg ylu
<ublu mtbtrsf mwhûttltu jtC b¤u <u btxu leau bwsclt vdjtk juJt sKtJtguj Au.
1. ftuR vK mkM&t/ yusLme/ ftuLx[tfxhlu ftuR vK mhfthe ftgtuo btxu ftuLx[tfx ytv<t vnujt <uble vtmu fboathe
CrJ»g rlr^ mkdXl yk<do< RMgw &guj «turJzLz Vkz hSMx[uNl Au fu lne <ule Ft<he fhJe.
2. Wvhtuf< fuxudhebtk ytJ<t fboatheytulu ftbœth CrJ»g rl^e ylu vhawhK studJtRytult
yr^rlgb,1952 ylu <u ykk<do< DzJtbtk ytJuj gtusltytule studJtRytu jtdw vzu <u btxu <tðftrjf
3. Wvhtuf< fuxudhebtkk ytJ<t fboatheytultu CrJ»g rlr^ltu Vt¤tu <&t ltufhe œt<t <hV&e WbuhJtltu &<tu
Vt¤tu yaqf fvtRlu <ublt «turJzLz Vkzlt Ft<tbtk sbt &tg,<ule aftmKe fhelu s vAelt brnltle
awfJKe ytWxmtumekd yusLmelu fhJe.
R.ve.yuV.ytu. fauhelt yr^f]< yr^fthe©eytult sKtÔgt bwsc ybœtJtœ Bgwrlrmvj ftuvtuohuNlbtk ftb
fh<tk ftuLx[tfxh©eytu, mÃjtgoh©eytu <&t fLmjxLx©eytu rJduhu suJe <btb cnthle yusLmeytuyu <ublt nM<flt
fboathe©eytultu vK R.ve.yuV.btk mbtJuN fhJtltu ylu R.ve.yuV.lt rlgb bwsc R.ve.yuV. awfJJtu sYhe ylu
VhSgt< Au. stu yub fhJtbtk awf &tg <tu r«Lmevtj yuBÃjtugh <hefu <ublt awfJJtlt ve.yuV. ykdult ltKtk rlg<
Ôgts, vulÕxe ylu zubuSm mne< ybœtJtœ Bgwrlrmvj ftuvtuohuNlu awfJJtle sJtcœthe l &R Nfu <u nu<w&e
mkœrCo< vºt ¢btkf 3 yLJgu bnu. Bgwrl. frbNlh©e XhtJlk.50 <t.06/08/2018&e b¤uj bkswhe
R.ve.yuV.yufx jtdw &guj ntug <uJt ybœtJtœ Bgwrlrmvj ftuvtuohuNlbtk ftb fh<t ntjbtk ftgoh< ntug <uJt ylu
yts vAe ftb ytvJtlt &tg <uJt <btb ftuLx[tfxhtulu ftb ytv<t vqJuo R.ve.yuV.hSMx[uNl fhtJuj ntug <u sYhe
Au.<ubs suytulu R.ve.yuV.yufx l&e jtdw vz<tu <uJt ftuLx[tfxhtuyu htFuj fboathe©eytu btxu R.ve.yuV. yufx <&t
htsg mhfth©elt vrhvºtbtk sKtÔgt bwsc r«Lmevtj yuBÃjtugh <hefu R.ve.yuV.le sJtcœthe ybœtJtœ
Bgwrlrmvj ftuvtuohuNlle hnu<e ntuJt&e CrJ»gbtk R.ve.yuV. yufxlwk vtjl l fhJt&e zebtLz ltuxem <&t
ftgœtfeg «r¢gt&e caJt btxu <&t ftgœtfeg vrhrM&<e WvrM&< l &tg <u nu<w&e htsg mhfth©elt ©b ylu
htusdth rJCtdlt yt mt&u mtbuj fhuj vrhvºt ¢btkf RveyuV/182016/368596/b(3) <t.07/07/2017 ltu
awM<vKu ybj fhJtu sYhe Au.
ybœtJtœ Bgwrlrmvj ftuvtuohuNllt <btb Ft<tlt Jztyr^fthe©eytulu <ublt nM<flt Ft<t/ rJCtdbtk
fhtJJtle &<e ftuR vK «fthle ftbdehe btxu fhtJJtbtk ytJ<t fJtuxuNl, xuLzh fu ytuVhbtk R.ve.yuV.yufx bwsc
sYhe hSMx[uNl ctc<u yawf ltuk^ fhJtle <&t R.ve.yuV.yufxltu awM< vKu ybj fhJtle Ftm ltuk^ juJt yºtu&e
sKtJJtbtk ytJu Au.
mne: zu.Bgwwrl.frbNlh
ltuku^:- y.Bgw.ftu lt mhfgwjh lk-41 <t.09/11/2021 bwsc ‘bwÏg bkºte yu«uLxemNev gtuslt’ yk<do< ftuLx[tfxh/xuLzhhu xuLzh mt&u VhSgt< R-Vtubo
mxeoVefux hsw fhJtlwk hnuNu sule yawf ltuk^ juJe.
xuLzhhle mne ylu rm¬tu
ybœtJtœ BgwÂlÂmvj ftuvtuohuNl
bntldh muJtmœl - W•thÍtul
W•th Ítul Ítulj ytuVem,
htSJ dtkk^e CJl, buBftu, lhtuzt htuz, ybœtJtœ.
yu.yth.me. xuLzh- Nh<tu
1. yu.yth.me. xuLzhbtk Jfoytuzh ytÃgt ctœ ftb NY fhJtle mbgbgtoœtbtk ftuLx[tfxh îtht ftb NY fhJtle òK fgto
ctœ 24 fjtflt ftb NY lrn fhJtbtk ytJu <tu yLg ftuLx[tfxh vtmu btfuox hux&e ftuLx[tfxhlt Faou ylu stuFbu
ftbdehe fhtJJtbtk ytJNu.
2. ftuLx[tfxhlu Jfoytuzoh ytÃgt ctœ yu.yth.me. «fthlkw xuLzh ntuR ftble sYhegt< bwsc xujeVtulef òK fhe su <u
ftb NY fhJt fnuJtbtk ytJNu ylu su ftble òK fgtolt 24 fjtfbtk NY fhJtbtk lrn ytJu ylu rlg<
mbgbgtoœtbtk vwKo fhJtbtk lrn ytJu <tu su <u ytRxblt SOR CtJ&e 1.5 dKe vulÕxe Jmwj juJtbtk ytJNu.
3. ºtK fu J^w Jth Wvh bwscle yLg ftuLx[tfxh vtmu&e ftbdehe fhtJJtle Vhs vzNu ylu/y&Jt ºtK fu J^w Jth
vulÕxe fhJtle Vhs vzNu <tu <u mkstudtubtk ftuLx[tfxhlu çjufjeMx fhJtbtk ytJNu sule ykr<b m•tt Bgw.frb¹lh©elu
bu.Bgwrl.frb§h©e, ybœtJtœ Bgwrl. ftuvtuhuNllt mhfgwjh lk.-81, <t.26.02.2015 bwsc <btb
«fthle fLmx[fNlle yufxeJexebtk bwÏg ftuLx[tfxh,mc ftuLx[tfxhlt su bswhtu ftbdehe fh<t ntug <u <btb
bswhtulwk dwsht< rcÕzekd yuLz y^h fLmx[fNl Jfombtk hSMx[uNl fhtJJwk VhSgt< Au.
Seal and Signature of the Bidder Addl. City Engineer
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
volume -1 tender-64.pdf
volume -2 tender-64.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .