Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.8 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹6.0 L+₹1.1 L (23.2%)Admitted-Fee/PreQual/Technical/Finance AT LOYABAD NO 09 P O BANSJORA DHANBAD 828101 | DHANBAD | DHANBAD | JHARKHAND | 828101 | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹6.1 L+₹1.2 L (25.8%)Admitted-Fee/PreQual/Technical/Finance AT BANSJORA 12 NO BANSJORA PO BANSJORA DHANBAD 828101 | DHANBAD | DHANBAD | JHARKHAND | 828101 | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹6.2 L+₹1.4 L (28.9%)Admitted-Fee/PreQual/Technical/Finance AT MOHLIDIH BHULI PO BHULI DHANBAD 828104 | DHANBAD | JHARKHAND | 828104 | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹5.0 L
EMD Value
₹6,300
Closing Date
21 Sept 2026, 5:00 pmClosed
ACE, SIJUA
OFFICE OF ACE, SIJUA
Repair and Maintainance of Sijua GM bungalow for outside portion and other miscelaneous work under sijua area
2026_BCCL_365473_1
GM/SA/Civil/2026-27/eNIT-37
Open Tender
Civil Works - Buildings
Percentage
15 days
GM Bungalow
please refer tender documents
3 documents required · 3 mandatory
₹6,300
22 Sept 2026
14 Sept 2026
22 Sept 2026
15 Sept 2026
21 Sept 2026
15 Sept 2026
15 Sept 2026 - 19 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0Item Description/ Heading | |||||
| 1.01 | Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete. 15.45 | 500.4 | sqm | 15.45 | ₹7,731.18 |
| 1.02 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. | 20 | Sqm | 32.85 | ₹657 |
| 1.03 | 12 mm cement plaster of mix : 1:6 (1 cement: 6 fine sand) sqm 222.00 | 55 | sqm | 222 | ₹12,210 |
| 1.04 | Finishing walls with textured exterior paint of required shade :Old work (One or more coats) applied @ 1.82 ltr/10 sqm. | 280.8 | sqm | 92.4 | ₹25,945.92 |
| 1.05 | Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 3,600 | sqm | 5.35 | ₹19,260 |
| 1.06 | Felling trees of the girth (measured at a height of 1 m above ground level), including cutting of trunks and branches, removing the roots and stacking of serviceable materialand disposal of unserviceable material. | 4 | Each | 1,421.3 | ₹5,685.2 |
| 1.07 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, ifnishing and reinforcement- All work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources: 4 graded stoneaggregate 20 mm nominal size derived from natural sources). | 0.87 | cum | 6,520.45 | ₹5,672.79 |
| 1.08 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more | 69.6 | kg | 75.65 | ₹5,265.24 |
| 1.09 | Centering and shuttering including strutting, propping etc. and removal of form for Shelves (Cast in situ) | 10.12 | sqm | 611.45 | ₹6,187.87 |
stage.html
html • 0.02 MB
finance_378407.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 3.10 MB
BOQ_378407.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .