Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹8.2 L
EMD Value
₹20,551
Closing Date
21 Oct 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
ExecutiveEngineer
ExecutiveEngineer PH Division Muvattupuzha
KWA Revenue ANNUAL MAINTENANCE 20252026 Maintenance of RWSS to NellikkuzhyRepairing pipelines and taps in various locations in Nellikuzhy Panchayath for the year 202526Pipeline WorkPipeline Work
2025_KWA_808947_1
10/2025-26/EE/PHDN/MVPA
Open Tender
Civil Works - Water Works
Item Rate
365 days
Nellikkuzhy Panchayth
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,815
₹20,551
5 Dec 2025
13 Oct 2025
23 Oct 2025
13 Oct 2025
21 Oct 2025
13 Oct 2025
Work Name:KWA Revenue-ANNUAL MAINTENANCE 2025 - 2026-Maintenance of RWSS to Nellikkuzhy - Repairing pipelines and taps in various locations in Nellikkuzhy Panchayath for the year 2025-26 -Pipeline Work-Pipeline Work
to 6) pipeline including detecting and locating leak, earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe to the site, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or any available joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and without causing any damages to the existing utilities and refilling the trenc
hes using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers including the cost of pipe and uPVC specials; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: All Socketed Jointing.x100.47.1.3:Leak rectification work in 50mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe to the site, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or any available joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers including the cost of pipe and uPVC specials; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: All Socketed Jointing.x100.47.1.4:Leak rectification work in 63mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe to the site, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or any available joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers including the cost of pipe and uPVC specials; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: All Socketed Jointing.x100.47.1.5:Leak rectification work in 75mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe to the site, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or any available joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers including the cost of pipe and uPVC specials; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: All Socketed Jointing.x100.47.1.6:Leak rectification work in 90mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe to the site, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or any available joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers including the cost of pipe and uPVC specials; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: All Socketed Jointing.q100.47.2.2:Leak rectification work in 110mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earth work excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairable joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, without causing any damages to the existing utilities, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, ribbon fencing, watching, traffic control etc., complete as per the direction of Departmental officers, including the cost of pipe & specials but excluding the cost of C.I.R. Joints; uPVC Pipes and specials shall be of good quality and conforming to
standards: Socket & C.I.R. Jointing.pOD137381/2025-2026:Leak rectification work in 110mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earth work excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairable join
t and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, without causing any damages to the existing utilities, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, ribbon fencing, watching, traffic control etc., complete as per the direction of Departmental officers, including the cost of pipe & specials but excluding the cost of C.I.R. Joints; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: ALL Socket.q100.47.2.3:Leak rectification work in 140mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earth work excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairable joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, without causing any damages to the existing utilities, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, ribbon fencing, watching, traffic control etc., complete as per the direction of Departmental officers, including the cost of pipe & specials but excluding the cost of C.I.R. Joints; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: Socket & C.I.R. Jointing.u100.47.3.3.a:Leak rectification work in 140 mm PVC (Class 2 to 6) pipe line including detecting and locating leak, earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairable joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, without causing any damage to the existing utilities, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, ribbon fencing, lighting, watching, traffic control etc., complete as per the direction of Departmental officers, including the cost of pipe & specials but excluding the cost of C.I.R. Joints; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: C.I.R. Jointing.q100.47.2.4:Leak rectification work in 160mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earth work excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairable joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, without causing any damages to the existing utilities, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, ribbon fencing, watching, traffic control etc., complete as per the direction of Departmental officers, including the cost of pipe & specials but excluding the cost of C.I.R. Joints; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: Socket & C.I.R. Jointing.j100.47.3.4:Leak rectification work in 160mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairable joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, without causing any damage to the existing utilities, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, ribbon fencing, lighting, watching, traffic control etc., complete as per the direction of Departmental officers, including the cost of pipe & specials but excluding the cost of C.I.R. Joints; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: C.I.R. Jointing.OD137380/2025-2026:Rectification of leakages in 32/40/50 size of GI Pipes in exposed portions by providing fabricated MS saddle rectifying any defects noticed, without causing any damages to any other utilities, including the charges hire and conveyance of tools and materials to the leak site, bailing out water, lighting, watching, saddle, rectifying any defects noticed, without causing any damages to any other utilities, including fencing, caution boards, traffic diversion as per the direction of departmental officers etc. complete¼OD137379/2025-2026:Rectification of leakages in 65/80 various size of GI Pipes in exposed portions by providing fabricated MS saddle, rectifying any defects noticed, without causing any damages to any other utilities, including the charges hire and conveyance of tools and materials to the leak site, bailing out water, lighting, watching, fencing, caution boards, traffic diversion as per the direction of departmental officers etc. complete.·OD137378/2025-2026:Rectification of leakages in 100/125mm size of GI Pipes in exposed portions by providing fabricated MS saddle, rectifying any defects noticed, without causing any damages to any other utilities, including the charges hire and conveyance of tools and materials to the leak site, bailing out water, lighting, watching, fencing, caution boards, traffic diversion as per the direction of departmental officers etc. complete³OD137376/2025-2026:Rectification of leakages in 150mm size of GI Pipes in exposed portions by providing fabricated MS saddle, rectifying any defects noticed, without causing any damages to any other utilities, including the charges hire and conveyance of tools and materials to the leak site, bailing out water, lighting, watching, fencing, caution boards, traffic diversion as per the direction of departmental officers etc. complete¢100.50.1.1:Rectification of leaka
ges of 32mm, 40mm & 50mm G.I. Pipes by replacing lengths up to 1.0m including earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar / concrete cutting, by cutting, removing and stacking the damaged portion from the existing line without causing any damages to the remaining portion and specials and conveying and replacing with G.I. Pipes of suitable size and jointing by thraded coupler and union of suitable size including threading, alignment, laying and jointing to make a water tight joint, testing the line to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges hire and conveyance of tools, plant and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, including the cost of specials but excluding cost of pipe and as per the direction of departmental officers etc., complete.X100.50.3.1:Rectification of leakages of 50mm G.I. Pipes in exposed portions by replacing lengths up to 1.0m by cutting, removing and stacking the damaged portion from the existing line without causing any damages to the remaining portion and specials and conveying and replacing with G.I. Pipes of suitable size and jointing by three run welding to make a water tight joint, painting the welded portion, testing the line to the required pressure, rectifying any defects noticed, without causing any damages to any other utilities, including the charges hire and conveyance of tools, plant and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, necessary scaffolding including the cost of specials but excluding cost of pipe and as per the direction of departmental officers etc., complete.X100.50.3.2:Rectification of leakages of 65mm G.I. Pipes in exposed portions by replacing lengths up to 1.0m by cutting, removing and stacking the damaged portion from the existing line without causing any damages to the remaining portion and specials and conveying and replacing with G.I. Pipes of suitable size and jointing by three run welding to make a water tight joint, painting the welded portion, testing the line to the required pressure, rectifying any defects noticed, without causing any damages to any other utilities, including the charges hire and conveyance of tools, plant and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, necessary scaffolding including the cost of specials but excluding cost of pipe and as per the direction of departmental officers etc., complete.X100.50.3.3:Rectification of leakages of 80mm G.I. Pipes in exposed portions by replacing lengths up to 1.0m by cutting, removing and stacking the damaged portion from the existing line without causing any damages to the remaining portion and specials and conveying and replacing with G.I. Pipes of suitable size and jointing by three run welding to make a water tight joint, painting the welded portion, testing the line to the required pressure, rectifying any defects noticed, without causing any damages to any other utilities, including the charges hire and conveyance of tools, plant and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, necessary scaffolding including the cost of specials but excluding cost of pipe and as per the direction of departmental officers etc., complete.U100.50.3.4:Rectification of leakages of 100 mm GI Pipes in exposed portions by replacing lengths up to 1.0m by cutting, removing and stacking the damaged portion from the existing line without causing any damages to the remaining portion and specials and conveying and replacing with GI Pipes of suitable size and jointing by three run welding to make a water tight joint, painting the welded portion, testing the line to the required pressure, rectifying any defects noticed, without causing any damages to any other utilities, including the charges hire and conveyance of tools, plant and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, necessary scaffolding including the cost of specials but excluding cost of pipe and as per the direction of departmental officers etc. complete.U100.50.3.6:Rectification of leakages of 150 mm GI Pipes in exposed portions by replacing lengths up to 1.0m by cutting, removing and stacking the damaged portion from the existing line without causing any damages to the remaining portion and specials and conveying and replacing with GI Pipes of suitable size and jointing by three run welding to make a water tight joint, painting the welded portion, testing the line to the required pressure, rectifying any defects noticed, without causing any damages to any other utilities, including the charges hire and conveyance of tools, plant and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, necessary scaffolding including the cost of specials but excluding cost of pipe and as per the direction of departmental officers etc. complete. 100.51.1: Disconnecting water connection from service mains along earthern road without causing any damage to the existing line including charges of earth work excavation in all kinds of soil for exposing connection point including tar cutting / conrete cutting if any, making the disconnection point water tight charging and testing to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other existing utilities, including the charges of hire for tools and plant, conveyance of tools and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion but excluding cost of materials and as per the direction of departmental officers etc. complete. Disconnection100.51.2:Disconnecting water connection from service mains along Concrete road without causing any damage to the existing line including charges of earth work excavation in all kinds of soil for exposing connection point including tar cutting / conrete cutting, making the disconnection point water tight charging and testing to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other existing utilities, including the charges of hire for tools and plant, conveyance of tools and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion but excluding cost of materials and as per the direction of departmental officers etc. complete.100.51.3:Disconnecting water connection from service mains along Asphalt road without causing any damage to the existing line including charges of earth work excavation in all kinds of soil for exposing connection point including tar cutting / conrete cutting, making the disconnection point water tight charging and testing to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other existing utilities, including the charges of hire for tools and plant, conveyance of tools and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion but excluding cost of materials and as per the direction of departmental officers etc
. complete.,100.53.1.a:Washing OHSR/GLSR using brooms, brushes and bleaching powder by engaging coolies, scrubbing twice, washing and cleaning using fresh water, including side wall, floor slab and columns, disposing the the slurry / waste materials away from the immediate premises and within the initial lead of 50m from the periphery of the tank, without causing any damage to the existing structure and installations, charges including the operation of valves, conveyance and hire charges of tools and as per the direction of the department officers etc. complete.sqmÛ100.56.1:Supplying and fixing 15 / 20 mm PVC public tap after dismantling the damaged tap including all cost of materials, labour charges, hire for tools and as per the direction of the department officers etc complete.ú100.57.1:Rectifying the leakages in boring point of public tap connection including earth work excavation in all kinds of soil for exposing the boring point including concrete / tar cutting, dismantling the damaged saddle piece,cutting and removing damaged portion of pipe line,fixing new saddle piece,laying 20/25 mm PVC 10Kg/cm2 pipe in place of damaged portion of pipe and connecting with existing pipe line,testing the line to the required test pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges of hire and conveyance of tools, plants and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, including cost of pipe and saddle piece and as per the direction of departmental officers etc. complete.Leakµ100.58.1:Rectifying the leakages in vertical pipe of public tap connection including earth work excavation in all kinds of soil for exposing the pipeline including concrete / tar cutting, cutting and removing damaged portion of pipe, fixing new 20/25 mm GI pipe and specials in place of damaged portion of pipe and connecting with existing pipe line, testing the line to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges of hire and conveyance of tools, plants and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, including cost of pipe and specials and as per the direction of departmental officers etc. complete.(4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)cum¤100.41.39:Supply, stacking, spreading and consolidating of Quarry Muck in the trench of pipe line, including carriage, loading, unloading & stacking up to any lead.Å100.48.2.6:Rectification of minor joint leakages in 250mm C.I. Pipe including earthwork excavation in all kinds of soil for exposing leaking joint including tar cutting / concrete cutting, without causing any damages to the line and specials, cleaning the joints including raking out the damaged lead wool, conveying and inserting hemp and lead wool and caulking after cleaning the ends, charging and testing to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges of conveyance and hire for tools and plant, bailing out water, lighting, watching, ribbon fencing, providing caution boards, traffic diversion, including cost of materials and as per the direction of departmental officers etc., complete.y100.49.1.4:Rectification of joint leakages in 250mm D.I. Pipe (cutting, removing and laying back a length of 1.0m from one side of the joint) including earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, by cutting and removing a portion of pipe from the damaged joint without causing any damages to the remaining portion of the line and specials and replacing the pipe with mechanical and tyton joint after cleaning the ends, centering the pipe, providing the joints, testing the line to the required test pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges of hire and conveyance of tools, plants and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion but excluding cost of mechanical joint and as per the direction of departmental officers etc., complete.y100.49.1.5:Rectification of joint leakages in 300mm D.I. Pipe (cutting, removing and laying back a length of 1.0m from one side of the joint) including earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, by cutting and removing a portion of pipe from the damaged joint without causing any damages to the remaining portion of the line and specials and replacing the pipe with mechanical and tyton joint after cleaning the ends, centering the pipe, providing the joints, testing the line to the required test pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges of hire and conveyance of tools, plants and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion but excluding cost of mechanical joint and as per the direction of departmental officers etc., complete.100.50.2.1:Rectification of leakages of 50mm G.I. Pipes in exposed portions by replacing lengths up to 1.0m by cutting, removing and stacking the damaged portion from the existing line without causing any damages to the remaining portion and specials and conveying and replacing with G.I. Pipes of suitable size and jointing by thraded coupler and union of suitable size including threading, alignement, laying and jointing to make a water tight joint, testing the line to the required pressure, rectifying any defects noticed, without causing any damages to any other utilities, including the charges hire and conveyance of tools, plant and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, necessary scaffolding including the cost of specials but excluding cost of pipe and as per the direction of departmental officers etc., complete.100.50.2.2:Rectification of leakages of 65mm G.I. Pipes in exposed portions by replacing lengths up to 1.0m by cutting, removing and stacking the damaged portion from the existing line without causing any damages to the remaining portion and specials and conveying and replacing with G.I. Pipes of suitable size and jointing by thraded coupler and union of suitable size including threading, alignement, laying and jointing to make a water tight joint, testing the line to the required pressure, rectifying any defects noticed, without causing any damages to any other utilities, including the charges hire and conveyance of tools, plant and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, necessary scaffolding including the co
st of specials but excluding cost of pipe and as per the direction of departmental officers etc., complete.100.50.2.3:Rectification of leakages of 80mm G.I. Pipes in exposed portions by replacing lengths up to 1.0m by cutting, removing and stacking the damaged portion from the existing line without causing any damages to the remaining portion and specials and conveying and replacing with G.I. Pipes of suitable size and jointing by thraded coupler and union of suitable size including threading, alignement, laying and jointing to make a water tight joint, testing the line to the required pressure, r
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.08 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
KWAGeneralConditionsforeTenderingV5.pdf
PDF • 0.69 MB
Tendernotice_1.pdf
PDF • 0.12 MB
NIT.pdf
Other Document • 0.62 MB
Circularsordersandconditions.pdf
Other Document • 13.07 MB
BOQ_1349372.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .