| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 CrAccepted-AOC SHRI CHANDRAPAL SINGH VILLAGE BADRADURPUR POST KHEDA BUJURG DISTRICT ALIGARH | ALIGARH | UTTAR PRADESH | 202001 | ₹1.6 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.8 Cr+₹22.3 L (14.0%)Rejected-Finance 14 15 VINAY NAGAR VIJITEM PUBLIC SCHOOL QUARSI RAMGHAT ROAD ALIGARH | ALIGARH | ALIGARH | UTTAR PRADESH | ₹1.8 Cr+₹22.3 L (14.0%) | L2 | Rejected-Finance L2 |
| 3 | L3₹1.8 Cr+₹22.4 L (14.0%)Rejected-Finance NA | NA | NA | 121004 | ₹1.8 Cr+₹22.4 L (14.0%) | L3 | Rejected-Finance L3 |
| 4 | L4₹1.9 Cr+₹31.8 L (20.0%)Rejected-Finance | ₹1.9 Cr+₹31.8 L (20.0%) | L4 | Rejected-Finance L4 |
| 5 | Rejected-Technical | - | - | Rejected-Technical technical bid not Qualified |
Tender Value
₹2.5 Cr
EMD Value
₹4.9 L
Closing Date
18 Sept 2023, 12:00 pmClosed
Superintendent Engineer
Office of superintendent engineer IWC Moradabad
LOT NO. 2 PILAKHAR NEHAR PRADALI KE ANTARGAT BAYA PILAKHAR NEHAR KI PUNARSTHAPNA HETU SILAI MINOR AVAM POORV NIRMIT BAYA PILAKHAR FEEDER NEHAR KI REMODELLING KA KARYA
2023_UPIDC_835318_4
07/SE/2023-34
Open Tender
Civil Works
Item Rate
180 days
Rampur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹4.9 L
26 Oct 2023
12 Sept 2023
18 Sept 2023
12 Sept 2023
18 Sept 2023
12 Sept 2023
Amount
Laying and Jointing PVC Pipe. Heading
Dismantling brick or stone masnory in lime or cement including stacking within 60m including Labour T&P etc completion of work as directed by Engineer - incharge
Dismantling CC Work including Labour T&P completion of work as directed by Engineer - incharge
Dismantling R.B. OR R.C.C. work including stacking materials within 60m including Labour T&P etc completion of work as directed by Engineer - incharge .
Collection, cleaning, and stacking of old bricks including , Labour T&P etccompletion of work as directed by Engineer - incharge
Earth work in filling or in embankment in ordinary soil for bank strenghting/Diversion to be in 20cm layers including ramming and dressing the surface to the required levels and slop also i/c 1.50 m lift and lead up to 600 m including cost of earth all labour, T&P, Loading ,unloading etc for completion of work as directed by Engineer - incharge .
Earth work in Foundation in dry soil including lift up to 1.50M and lead up to 30m and including back filling ,watering and ramming of excavated earth in to the plinth with removal and disposal of surplus earth as directed by Engineer in charge
Providing & Laying Local sand under C.C. including all cost of materials ,Labour & T&P etc complete
Providing and Laying Cement concrete 1:3:6 (M-10 Grade) in (cement,coarse sand and crushed aggregate) i/c cost of all material ,labour,mechanical mixing & vibration T&P etc. required for proper completion of work
Providing fist class M-100 Brick work in 1:4 cement mortar including cost of all materials , Labour T&P etc complete.
Providing and fixing Centering & Shuttering For R.C.C and C.C. works ( Formwork of Concrete )including cost of all materials , Labour , T&P etc for proper completion of work.
Providing and fixing steel reinforcement including cost of steel ,binding wire ,bending , binding ,cutting placing in proper position , all labour and T&P etc for proper completion of work
Filling expension joint by Permould joint filler 25mm thick including cost of material,T&P , etc complete as per direction of Engineer in charge .
Providing and fixing of 75mm dia P.V.C. pipe in proper position for drainage apout including cost of material, cutting ,jointing , Labour , T&P , etc complete as per direction of Engineer in charge .
Two coat painting over abuetment cap with bitumen @0.85kg per Sqm. In each coat including supply of all materials,labour and T & P etc. required proper completion of work.
Supply and laying two layer of tarfelt over abuetment cap as per direction of the Engineer in charge including necessary overlap including supply of all materials,labour and T & P etc. required proper completion of work.
Providing and Laying Cement concrete 1:1:2 (M-25 Grade) in (cement,coarse sand and crushed aggregate) i/c cost of all material ,labour,mechanical mixing & vibration T&P etc. required for proper completion of work
Providing and Laying Cement concrete 1:2:4(M-15 Grade) in (cement,coarse sand and crushed aggregate) i/c cost of all material ,labour,mechanical mixing & vibration T&P etc. required for proper completion of work
Providing and Laying Cement concrete 1:1.5:3 (M-20 Grade) in (cement,coarse sand and crushed aggregate) i/c cost of all material ,labour,mechanical mixing & vibration T&P etc. required for proper completion of work
Providing and Laying Lean concrete 1:6:12 in (cement,coarse sand and crushed aggregate) i/c cost of all material ,labour,mechanical mixing & vibration T&P etc. required for proper completion of work
Providing Struck Deep Cement Pointing in 1:2 cement mortar including cost of all materials , Labour T&P etc complete.
Finishing wall with one coat of water proof cement paint weather coat of approved quality on previously new surface with the paint to give an even shade including supply of all materials , labour , T&P etc required for proper completion of the work.
Earth work in cutting in ordinary soil, including ramming, dressing the surface to be required level and slope also Including lift 1.50 m. and lead upto 30 m. etc. Complete (DIVERSION & OTHER)
Providing and Laying non Pressure NP-3 class (Medium duty) R.C.C Pipes including coller /spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement :2 fine sand ) including testing of joints etc .complete .
Provide and fixing steel gate including cost of all materials ,fabrication ,bearing plate with required T&P with wealding ,painting, carriage up to work site etc .complete
Clearence of sarvar/patera from canal
providing laying and jointing glazed stoneware pipes A with stiff mixture of cement mortar in the of 1:1 (1cement :1 fine sand) including testing of joints etc. complete.
Earth Work in Slush clearence including lift upto 1.50m and lead upto 1.00km
Earth work in silt clearance including lift up to 1.5 M and lead up to 30 M including rough dressing. (The earth from clearance to be used in side embankment or to be disposed on spoil banks or as directed by (Engineer-in-charge)
Providing & laying Dry Brick on Edge flooring & Soiling including all cost of labour, material and T&P etc. complete.
GOMATINETRA CONSTRUCTIONS
M/S S R CONSTRUCTION
VIJAY ASSOCIATES
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .