| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.4 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹10.5 L+₹13,047.79 (1.26%)Rejected-AOC | L2 | Rejected-AOC L2 |
Tender Value
₹10.5 L
EMD Value
₹26,400
Closing Date
7 Jan 2020, 6:55 pmClosed
Assistant Executive Engineer
Assistant Executive Engineer Kuttiady Irrigation Project Subdivision Vatakara
Construction of bridge
2019_Irrig_332740_1
AEE/VTK/41/2019-20
Open Tender
Civil Works - Bridges
Item Rate
180 days
Meppayyur
5 documents required · 5 mandatory
₹2,601
Yes
online
₹26,400
Yes
1 Jun 2023
28 Dec 2019
14 Jan 2020
28 Dec 2019
7 Jan 2020
28 Dec 2019
28 Dec 2019 - 7 Jan 2020
Amount
DetailedEstimate
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
60.7.2 : DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site.
4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
4.2.5 : Providing and laying cement concrete in retaining walls, return walls, walls ( any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts,buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor, etc. up to floor five level, excluding the cost of centering, shuttering and finishing:1:3:6 ( 1 cement : 3 coarse sand :6 graded stone aggregate 20 mm nominal size)
4.3.3 : Centering and shuttering including strutting, propping etc. and removal of form work for:Columns, piers, abutments, pillars, posts and struts
5.9.5 : Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.9.3 : Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
5.9.16.2 : Centering and shuttering including strutting, etc. and removal of form for:Edges of slabs and breaks in floors and wallsAbove 20 cm wide
5.1.2 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
13.16.1 : 6 mm cement plaster of mix:1:3 ( 1 cement : 3 fine sand)
16.92 : Providing and fixing 10x10x7.50 cm Granite stone block hand cut and chisel dressed on top, for paving in floors, drains etc. laid over 20mm thick base mortar 1:4 (1 cement : 4 coarse sand) with joints 10 mm wide filled with same mortar including ruled pointing etc. complete as per direction of engineer-in-charge
16.21 : Engraving letters in hard stone
ANUSREE A P
Bidder Name
ANUSREE A P
MADATHUMBAGAM LABOUR CONTRACT CO OPERATIVE SOCIETY
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_463416.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .