Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹2.0 Cr
EMD Value
₹2.0 L
Closing Date
19 Oct 2026, 6:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
EXECUTIVE ENGINEER TAPI R AND B DIVISION VYARA
BLOCK NO. 10, 2ND FLOOR, JILLA SEVA SADAN, PANVADI TA. VYARA DIST. TAPI - 394650
Resurafacing of Akkalkiwa Taloda Shahda Road, Km. 136/600 to 138/800 , Ta. Kukarmunda, Dist. Tapi (CRIF 2025-26)
2026_MoRTH_928826_1
17 of 2026-27 CRIF A K
Open Tender
Civil Works - Roads
Works
180 days
AS PER TENDER
5 documents required · 5 mandatory
₹3,600
EXECUTIVE ENGINEER TAPI R AND B DIVISION VYARA
₹2.0 L
Yes
5 Oct 2026
5 Oct 2026
21 Oct 2026
5 Oct 2026
19 Oct 2026
5 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting trunk vegetation, grass bushes, shrubs, saplings and tree girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials (C) by mechanical means in area of light jungle | 0.35 | Hec. | 28,455.09 | ₹9,959.28 |
| 2 | Box cutting the road surface to proper slope and camber for making a base for road work including removing the excavated stuff and depositing on the road side slope as directed upto 50Mt.lead. | 1,680 | Cum | 106.64 | ₹1,79,155.2 |
| 3 | Providing and laying wet mix macadam base course 250 mm thick in two layers as per MORTH specification using machine crushed B.T. chips as per required gradation, mixing with required optimum quantity of water, conveying the mix to site of work, spreading in to grade and camber with paver/mechanical means and consolidation each layer with vibratory roller to aschieve the desired density including cost of material labour plant and equipment etc. complete. | 1,211 | Cum | 1,420.06 | ₹17,19,692.66 |
| 4 | Providing and apllying primin coat with Bitumen grade SS-1at the rate of 7.50 kg/10 sq.mt. including cost of asphalt and preparing the surface heating and applying etc. complete. | 93 | Sqm | 87.51 | ₹8,138.43 |
| 5 | Earth work for embankment including breaking clods, dressing with all lead and lift including watering, rolling and consolidation of sub grade in layers at O.M.C to required dry density including filling the depression which occur during the process using vibratory roller 8 to 10 Tonne (E) From borrow area within 3.0 Km. lead | 260 | Cum | 173.67 | ₹45,154.2 |
| 6 | Earth work in cutting in all sorts of soil and soft murrum including conveying and spreading the stuff embankment as and where directed within 200 meter from the end of cutting with all required lead and lift. | 2,112 | Cum | 130.93 | ₹2,76,524.16 |
| 7 | Rolling and watering of earth work in layers with power roller including filling in depression which occur during the process | 422 | Cum | 22.88 | ₹9,655.36 |
| 8 | Picking of the bituminous surface using JCB excavator or by any mechanical means, cleaning and removal of loose and unsuitable material on the road surface including cost of fuel, oil, lubricant, labour charges and disposal of loose unsuitable material from site to the disposal site as directed by Engineer in charge. | 10,850 | Sqm | 5.23 | ₹56,745.5 |
| 9 | Providing and laying 50 mm thick Dense graded bituminous macadam with tack coat at 2.50 Kg/10 Sq.mt. of Emusion RS-1 by mechanical sprayer and using stone chips as per MORT&H gradation and asphalt VG-30 grade @ 4.50% (As per mix design)by total weight of mix for binder by batch mix hot laid process including transporting the mix and spreading the same by paver finisher and consolidation by vibratory roller including providing and operating required drum mix plant & machinery cost of fuel, asphalt, oil, lubricant & labour charges etc. complete. | 2,126 | M.T. | 4,553.08 | ₹96,79,848.08 |
| 10 | Providing and laying 30 mm thick compacted Bituminuous Concrete using stone chips as per MORT&H gradation & VG-30 grade asphalt for mixing @ 5.50% (As per mix design) by weight of total mix for binder including heating the aggregate and asphalt by Batch mix plant and spreading the same by sensor paver finisher and consolidation with vibratory roller including providing all materials, equipments, tools and plants, oil, kerosene, fire wood, labour charges etc. complete | 1,165 | M.T. | 5,081.31 | ₹59,19,726.15 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.57 MB
Tendernotice_2.pdf
PDF • 0.11 MB
Tendernotice_3.pdf
PDF • 1.36 MB
Tendernotice_4.pdf
PDF • 0.81 MB
Tendernotice_5.pdf
PDF • 4.89 MB
Tendernotice_6.pdf
PDF • 0.97 MB
Tendernotice_7.pdf
PDF • 9.07 MB
Tendernotice_8.pdf
PDF • 8.00 MB
BOQ_976092.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .