| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.6 CrAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹20.6 Cr+₹5.5 L (0.27%)Admitted-Finance PLOT NO 18 VANAPADI ROAD OPPOSITE PARI G M BUNGALOW RANIPET 632403 | RANIPET | TAMIL NADU | 632403 | L2 | Admitted-Finance | |
| 3 | L3₹20.8 Cr+₹24.4 L (1.19%)Admitted-Finance 74 T N H B COLONY NEAR BALAMURUGAN TEMPLE MADURAI 625017 | MADURAI | TAMIL NADU | 625017 | L3 | Admitted-Finance | |
| 4 | L4₹23.2 Cr+₹2.6 Cr (12.6%)Admitted-Finance | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | S.R.CONSTRUCTION L4 | Sri Sivaram and co L3 | SR CONSTRUCTION SERVICES PRIVATE LIMITED L1 | M/s.KUMAR BUILDERS L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling, clearing away the floor finish & dadooing walls in cement mortar with Mosaic Tiles / Glazed Tiles / Clay Tiles / Cuddapah Slabsand carefully stacking materials useful for re-use w-0042 Sor Vol-I pg no:31 | 2,300 | Sqm | 60 ₹1,38,000 | 57 ₹1,31,100 | 51 ₹1,17,300 Lowest | 52 ₹1,19,600 |
| 2.00 | Clearing Heavy Jungle & conveyence w-0001 Sor Vol-I pg no:29 | 1,88,900 | Sqm | 9 ₹17,00,100 | 8 ₹15,11,200 | 9 ₹17,00,100 | 7 ₹13,22,300 Lowest |
| 3.00 | Trimming the bed and the side slope of the bank in all soils except hard rock upto a thickness of 7.5 cm to 15 cm and making it ready to receive the concrete w-0058 Sor Vol-I pg no:363 | 10,800 | Sqm | 25 ₹2,70,000 | 23.5 ₹2,53,800 | 25 ₹2,70,000 | 21 ₹2,26,800 Lowest |
| 4.00 | Earth work excavation for desilting the existing rivers / canals / channels/odai/ nullas / drains/flood bowls/tanks/ reservoirs etc., consisting of very loose soil, silt, oily silt, slushy, marshy, loany, organic soil, sea shell and flat mica particles with zero present air void in unhygienic & insanitary conditions in under water and not under water deploying earth moving machinery with suitable floats buoys barge/ hydraulic excavator & other mechanical devices including the cost of hire charges for machinery, with cost of skilled operators with helper & cleaners for the entire operations to reach the banks in which the removed silt & sludge has to be dumped over either one of the rivers / canals / channels/odai/ nullas /drains/floods bowls / tanks / reservoirs etc, bank whichever is convenient as per the prevailing site conditions for easy conveyance and including jungle clearance etc.. complete (Rate excluding conveyance to dumping yard or low lying area) WR-0007 Sor Vol-I pg no:365 | 1,78,090 | Cum | 100 ₹1,78,09,000 | 90 ₹1,60,28,100 Lowest | 106 ₹1,88,77,540 | 93 ₹1,65,62,370 |
| 5.00 | Boring. providing and installing Bored cast-in-situ reinforced cement Concrete Pile of diameter of 450 mm and length below the pile cap in cement concrete 1:1.5:3 (1 cement, 1 .5 Coarse sand & 3 graded stone aggregate of 20 mm nominal size) to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including Bentonite solution machinery charges labour chargers etc., all complete. | 156 | RM | 2,400 ₹3,74,400 | 1,900 ₹2,96,400 | 1,689 ₹2,63,484 Lowest | 1,990 ₹3,10,440 |
| 6.00 | Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation W-0059 Sor vol I pg no:363 | 3,357 | Cum | 16 ₹53,712 | 14.3 ₹48,005.1 | 19 ₹63,783 | 13 ₹43,641 Lowest |
| 7.00 | Turfing in slopes including watering and fixing with initial lead upto 50m W-0073 Sor vol I pg no:364 | 22,380 | Sqm | 45 ₹10,07,100 | 40 ₹8,95,200 | 57 ₹12,75,660 | 36 ₹8,05,680 Lowest |
| 8.00 | Supply and filling in foundation and basement with Gravel in layers of not more than 15cm.thick well rammed watered and compacted with surface vibrator, watered and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 1,640 | Cum | 500 ₹8,20,000 | 465 ₹7,62,600 | 2,416 ₹39,62,240 | 422 ₹6,92,080 Lowest |
| 9.00 | Supplying and filling in foundation, basement, etc with filling 20 mm HBG Jelly in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 1,230 | Cum | 2,400 ₹29,52,000 | 2,000 ₹24,60,000 Lowest | 2,416 ₹29,71,680 | 2,002 ₹24,62,460 |
| 10.00 | Supplying and filling in foundation, basement, etc with filling coarse sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 820 | Cum | 300 ₹2,46,000 | 270 ₹2,21,400 | 3,239 ₹26,55,980 | 246 ₹2,01,720 Lowest |
Tender Value
₹33.6 Cr
EMD Value
₹33.6 L
Closing Date
10 Aug 2026, 3:00 pmClosed
The Commissioner, Tiruchirappalli City Corporation
Bharathidasan Road, Cantonment, Trichy - 620 001
Execution of developments works at Kottapattu Lake in Ward No.61 Tiruchirappalli CIty Municipal Corporation
2026_MAWS_682171_1
TN08/2026-2027, SERIAL NO.2
Open Tender
Civil Works
Lump-sum
710 days
zone 4
AS PER BID CONDITION
3 documents required · 3 mandatory
₹0
₹33.6 L
Main office, Tiruchirappalli City Corporation
15 Oct 2026
22 Jun 2026
10 Aug 2026
22 Jun 2026
10 Aug 2026
2 Jul 2026
2 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling, clearing away the floor finish & dadooing walls in cement mortar with Mosaic Tiles / Glazed Tiles / Clay Tiles / Cuddapah Slabsand carefully stacking materials useful for re-use w-0042 Sor Vol-I pg no:31 | 2,300 | Sqm | - | - |
| 2 | Clearing Heavy Jungle & conveyence w-0001 Sor Vol-I pg no:29 | 1,88,900 | Sqm | - | - |
| 3 | Trimming the bed and the side slope of the bank in all soils except hard rock upto a thickness of 7.5 cm to 15 cm and making it ready to receive the concrete w-0058 Sor Vol-I pg no:363 | 10,800 | Sqm | - | - |
| 4 | Earth work excavation for desilting the existing rivers / canals / channels/odai/ nullas / drains/flood bowls/tanks/ reservoirs etc., consisting of very loose soil, silt, oily silt, slushy, marshy, loany, organic soil, sea shell and flat mica particles with zero present air void in unhygienic & insanitary conditions in under water and not under water deploying earth moving machinery with suitable floats buoys barge/ hydraulic excavator & other mechanical devices including the cost of hire charges for machinery, with cost of skilled operators with helper & cleaners for the entire operations to reach the banks in which the removed silt & sludge has to be dumped over either one of the rivers / canals / channels/odai/ nullas /drains/floods bowls / tanks / reservoirs etc, bank whichever is convenient as per the prevailing site conditions for easy conveyance and including jungle clearance etc.. complete (Rate excluding conveyance to dumping yard or low lying area) WR-0007 Sor Vol-I pg no:365 | 1,78,090 | Cum | - | - |
| 5 | Boring. providing and installing Bored cast-in-situ reinforced cement Concrete Pile of diameter of 450 mm and length below the pile cap in cement concrete 1:1.5:3 (1 cement, 1 .5 Coarse sand & 3 graded stone aggregate of 20 mm nominal size) to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including Bentonite solution machinery charges labour chargers etc., all complete. | 156 | RM | - | - |
| 6 | Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation W-0059 Sor vol I pg no:363 | 3,357 | Cum | - | - |
| 7 | Turfing in slopes including watering and fixing with initial lead upto 50m W-0073 Sor vol I pg no:364 | 22,380 | Sqm | - | - |
| 8 | Supply and filling in foundation and basement with Gravel in layers of not more than 15cm.thick well rammed watered and compacted with surface vibrator, watered and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 1,640 | Cum | - | - |
| 9 | Supplying and filling in foundation, basement, etc with filling 20 mm HBG Jelly in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 1,230 | Cum | - | - |
| 10 | Supplying and filling in foundation, basement, etc with filling coarse sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 820 | Cum | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.58 MB
Kottapattu_LFD_BD_Vol1.pdf
Tender Documents • 3.24 MB
SMIFTNIIILFD_BD_Vol2.pdf
Additional Documents • 1.09 MB
FD_BD_Vol4A.pdf
Tender Documents • 38.83 MB
FD_BD_VolB.pdf
Additional Documents • 34.01 MB
FD_BD_VolC.pdf
Additional Documents • 20.42 MB
Vol5.pdf
Additional Documents • 5.79 MB
BOQ_819934.xls
BOQ • 0.49 MB
pp_08.pdf
PDF • 0.45 MB
BOQ_819934.xls
PDF • 0.54 MB
8_2.pdf
PDF • 0.37 MB
SMIF_TN_Kottapattu.pdf
PDF • 0.71 MB
KottapattuLake_Reply.pdf
PDF • 0.12 MB
SMIF_TN_Kottapattu.pdf
PDF • 0.71 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .