Tender Value
₹29 L
EMD Value
₹58,000
Closing Date
17 Oct 2026, 6:00 pm
GE AF AMBALA
GE AF AMBALA
RUNWAY REHABILITATION SCHEME UNDER GE (AF) AMBALA
2026_MES_791361_1
GE AF/AMB-T-50/2026-27
Open Tender
Civil Works
Item Rate
240 days
GE AF AMBALA
ALL AS PER NIT TENDER DOCUMENTS
7 documents required · 7 mandatory
₹500
GE AF AMBALA
₹58,000
Yes
26 Sept 2026
26 Sept 2026
19 Oct 2026
26 Sept 2026
17 Oct 2026
10 Oct 2026
26 Sept 2026 - 3 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | M&L to carry out repair of the damaged runway/taxi track using the conventional runway rehabilitation system using (RAPIGROUT CEMENT) to restore pavement for aircraft operations as per the following methodology complete all as specified & directed by Engineer-in-charge:-
( Note:- Rapigrout Cement Bags will be issued by the department.)
(i) Size of crater shall be of 4.00 to 5.00 mtr in dia and 1.5 to 2.00 mtr depth.
(a) Excavation and preparation of required size crater as per site and removal soil/debris with the help of JCB/loader/excavator.
(b) Dewatering (if required) and sealing the crater with the help of high pressure water pumps and suitable water proofing methods as per ground for further progressing the work.
(c) Soil stabilization and filling up of the bottom portion of the crater with the stone boulders of maximum size 150mm upto appx 0.75 mtr depth in the layers not exceeding 150mm.
(d) M&L for Laying and consolidating of 63<d<90mm upto depth of 250mm.
(e) M&L for Laying and consolidating of 40<d<90mm upto depth of 150 mm.
(f) M&L for laying 400 micron polythene sheet, over a layer of 60 mm thick sand cushion.
(g) M&L for laying and consolidating of 20<d<63mm upto thickness of 300 mm and providing form work to sides 10 to 15 cm in height, for laying Rapigrout cement grouting.
(h) supply and Laying/Pouring of Rapigrout cement grouting over the upper layer of crushed stone aggreagte will be carried out by Air Force Authorities/MES
(ii)The assessed time schedule for above activities is as under :-
(a) Assessment by administrative as well as executive team- 1 Hrs
(b) Mobilization of resources, men, material and T&P (Parallel activity)- 1 to 2 Hrs
(c) Repair of crater- 3.5 Hrs
(d) Clearance of site- 0.5 Hrs
(e )Total time envisaged to accomplish the tasks - 6 to 7 Hrs
(iii) The rate quoted by bidder shall deemed to included for all activites stated here-in-above and no claim whatsoever shall be entertained on this account | 8 | Each Job | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.23 MB
BOQ_887206.xls
BOQ • 0.35 MB
50TenderPages.pdf
Tender Documents • 0.63 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .