| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹56.9 LAccepted-AOC 54 13 360 7TH ROAD KVR KRISHNA ESTATES FLAT NO 102 SRINIVASANAGAR BANK COLONY GUNADALA KRISHNA ANDHRA PRADESH 520008 | NTR | ANDHRA PRADESH | 520008 | L1 | Accepted-AOC LOWEST | |
| 2 | L2₹75.8 L+₹18.8 L (33.0%)Rejected-Finance PLOT NO 178 A MLA COLONY ROAD NO 12 BANJARA HILLS HYDERABAD 500 034 | HYDERABAD | TELANGANA | 500034 | L2 | Rejected-Finance L2 | |
| 3 | L3₹75.9 L+₹19.0 L (33.3%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹85.8 L+₹28.9 L (50.7%)Rejected-Finance | L4 | Rejected-Finance L4 |
Tender Value
₹85 L
EMD Value
₹1.7 L
Closing Date
30 Jan 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Chief Engineer
Chief Engineer, BARC(V), Anu Vihar, Mekarasi Hill, Gajuwaka -Yellamanchili Road, Maduturu Sub Post Office,Visakhapatnam-531 011
Excavation of excess earth including transporting the same from Anu Vihar, Mekarasi Colony to BARC(V) Main campus, Atchutapuram, Near Visakhapatnam , A.P.
2023_BARC_734388_1
BARC (V)/CES/Earth Anu Vihar /115, Dated 09.01.20
Limited
Civil Works
Item Rate
90 days
Atchutapuram, Visakhapatnam
As per Tender
6 documents required · 6 mandatory
₹0
₹1.7 L
Yes
Atchutapuram, Visakhapatnam
5 Jul 2023
11 Jan 2023
2 Feb 2023
11 Jan 2023
30 Jan 2023
25 Jan 2023
11 Jan 2023 - 23 Jan 2023
23 Jan 2023
Amount
Notes : The rate quoted for earth work excavation by contractor is deemed to have included the following points (a) to (h) a) removal of all kinds of vegetation, small shrubs, light/heavy jungle, trees etc., alongwith roots, including disposal/stack in the identified location. b) shoring, strutting, stepping, dressing, grading required for keeping the earth in position on sides of trenches with approved timber/steel accessories wherever necessary to prevent sides from falling including bailing or pumping out of water if necessary including removal of debris/unserviceable materials and excavated excess soil, if any. c) dewatering of both ground and surface water, including removal of slurry generated while excavation and keeping the area free from water, to be let out of the building area through proper pipes & channels if required by suitable pumps, d) watering, ramming and thoroughly consolidate the bottom of all excavations & ground before the construction of foundation/footing/plinth beam, filling in basement or other work is commenced. e) the loose pockets shall be excavated and compacted after back filling as directed by Engineer-in-charge, as per detailed specification and conforming to safety rules during progress of the work. f) Contour levels to be taken jointly with the Engineer-in-charge and prior written approval be taken before starting any excavation/ filling at every 3 m grids for arriving at the actual quantity, g) Backfilling will be done in layers of thickness as specified below. h) cost of items shall include all labour charges, hire charges of machinery, lubricants, fuels and tests etc.
Earth work excavation upto an average depths of 2.0m from existing ground level in Hard Rock by chiselling without blasting and by mechanical means (Hydraulic excavator) / manual means including dewatering if necessary, dressing the areas, ramming , and stacking and / or disposing within a distance of 200 m , well rammed and compacted etc.complete all as per drawings, technical specifications and as directed by Engineer-in-charge.
Embankment/Filling in low lying areas using the sources within the campus with all type of soils including boulders including excavation at source with hydraulic excavator at all levels including loading,Transporting, unloading to site up to a lead of 11.0km, spreading in 250mm thick layers and compacting each layer with suitable power capacity roller/vibratory power roller to acheive 90% proctor density,making suitable temperory approach roads for the movement of excavator, tipper, dumper and other equipments, dewatering if required complete all as per drawings, specifications and as directed by the Engineer-In-charge.
SRICO PROJECTS PVT LTD
Y V R and COMPANY
SVC PROJECTS PVT LIMITED
stage.html
html • 0.05 MB
techsummary_772268.pdf
PDF • 0.09 MB
BOQ Comparative Chart
xlsx • 0.01 MB
finsummary_772268.pdf
PDF • 0.44 MB
WOEarth.pdf
PDF • 4.14 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .