Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.5 LAccepted-AOC | ₹3.5 L | L1 | Accepted-AOC She has quoted less 15 percent |
| 2 | L2₹3.5 L+₹81.82 (0.02%)Rejected-AOC AT BAHARANA PO BAULANGA PS GOP DIST PURI | PURI | ODISHA | 752001 | ₹3.5 L+₹81.82 (0.02%) | L2 | Rejected-AOC he has quoted less 14.99 percent |
| 3 | L2₹3.5 L+₹81.82 (0.02%)Rejected-AOC | ₹3.5 L+₹81.82 (0.02%) | L2 | Rejected-AOC She has quoted less 14.99 percent |
Tender Value
₹4.1 L
EMD Value
₹4,100
Closing Date
11 Feb 2026, 5:30 pmClosed
Superintending Engineer
Superintending Engineer, Rourkela Irrigation Division
Renovation of Office building of Rourkela Irrigation Division, Rourkela
2026_CEBBS_125354_4
SERID-RKL-09/2025-26
Open Tender
Civil Works - Others
Percentage
30 days
Rourkela
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,000
₹4,100
Yes
14 Aug 2026
2 Feb 2026
12 Feb 2026
2 Feb 2026
11 Feb 2026
2 Feb 2026
2 Feb 2026 - 10 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Removing old lime or cement plaster from walls including racking out joints 12mm deep and removing the debris within 50m lead, with all labour charges & as per direction of the Engineer in Charge | 25.65 | Sqm | 57.7 | ₹1,480 |
| 2 | 6mm thick in C.M.(1:4) to RCC surfaces finished smooth surface including closed deep chiping and slury treatment, with all labour cost, royalty 7 taxes etc. complete as per direction of the engineer in charge | 67.99 | Sqm | 211.04 | ₹14,348.61 |
| 3 | Scraping old paint with scrapers and papering and washing with soap water or soda including scafolding charges upto 5M height and as per direction of engineering-in-charge. | 1 | Sqm | 8.2 | ₹8.19 |
| 4 | Dismentling and removing old tiled flooring including removing the base coarse and stacking the use full materials for reuse and removing the debris within 50m lead, with all labour charges & as per direction of the Engineer in Charge. | 16.41 | Sqm | 144.2 | ₹2,366.32 |
| 5 | Suppying, fitting and fixing Vetrified tile of size 600mm x 600mm of approved make confirming to IS :13755 laid on 20 mm thick cement mortar (1:4) (1cement : 4 course sand) and filling joints with white cement of approved quality including cost of all materials, labour T&P etc required for the work all complete as per direction of Engineer in charge. | 27.93 | Sqm | 1,128.15 | ₹31,509.23 |
| 6 | Finishing surface walls with cement based wall putty (Water based)of approved make & finished smooth & even surface to receive painting including cost of scaffolding staging charges with cost of all materials taxes, labour T&P etc complete for completion of item of work as per direction ofEngineer in Charge. | 133.63 | Sqm | 81.8 | ₹10,930.93 |
| 7 | Wall Painting 2coats with plastic emulsion paint of approved shade on new work to give an even shade including cost of all materials taxes, labour T&P etc complete as per direction of Engineer in Charge | 1 | Sqm | 103.6 | ₹103.5 |
| 8 | Supply all materials and labour for roof ceiling with gypsum board including frame with cost of all materials, suspended from ceilling etc. complete and including electrification & wire cost etc complete including cost of all materials taxes, labour T&P etc complete as per direction of Engineer in Charge | - | Sqm | 2,045.2 | - |
| 9 | Providing fitting and fixing up partition walling aluminum anodized section No 9210 and 9207 as single groove and double groove respectively as horizontal and vertical member and OEL section 4660 as Tapered clip and jointing angle No- 1855 etc. As per direction of Engineer-in-charge including cost of laminated board including cost of all materials taxes, labour T&P etc complete as per direction of Engineer in Charge | 1 | Sqm | 2,791.7 | ₹2,791.42 |
| 10 | Providing fitting and fixing up window (sliding type) made up aluminum anodized section No 9778 as windows frame section No. 4095, 4096 and 977, 3994 as shutter frame with 5mm thick black glass as panel fitted with rubber beading including cost of materials all taxes labour, T&P ending cost of glass etc. complete as per direction of Engineer in charge | - | Sqm | 5,143.9 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
Tendernotice_2.pdf
PDF • 0.26 MB
Rkloffice.pdf
Tender Documents • 1.04 MB
BOQ_578720.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .