| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1st₹2.1 CrAccepted-AOC | ₹2.1 Cr | 1st | Accepted-AOC L1 Bidder |
| 2 | 2nd₹2.2 Cr+₹3.8 L (1.77%)Rejected-AOC | ₹2.2 Cr+₹3.8 L (1.77%) | 2nd | Rejected-AOC L2 Bidder |
| 3 | 3rd₹2.2 Cr+₹9.7 L (4.52%)Rejected-Finance | ₹2.2 Cr+₹9.7 L (4.52%) | 3rd | Rejected-Finance L3 Bidder. |
Tender Value
₹2.1 Cr
EMD Value
₹4.3 L
Closing Date
16 Mar 2026, 1:30 pmClosed
SE, Planning Circle, GAP Wing, WS Sector, KMDA
OFFICE OF THE SUPERINTENDING ENGINEER PLANNING CIRCLE, GAP WING, WS SECTOR, KMDA 1ST FLOOR, UNNAYAN BHAVAN , D-BLOCK SALT LAKE CITY, KOLKATA -700 091
Renovation and protection work of Nangi Ghat (Bata Ghat) of river Ganga including beautification and allied works under the jurisdiction of Mahestala Municipality, South 24 Parganas, West Bengal (2nd call).
2026_KMDA_1008252_1
KMDA/WS/GAP Wing/SE/Planning Circle/08 (2nd call), OF 2025-26
Open Tender
CIVIL WORKS
Percentage
Mahestala Municipal area
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹4.3 L
8 Jun 2026
18 Feb 2026
18 Mar 2026
18 Feb 2026
16 Mar 2026
18 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. Depth of excavation not exceeding 1500 mm. | 682.5 | Cu.M | 119.27 | ₹81,401.78 |
| 1.01 | Depth of excavation for additional depth beyond 1,500 mm. and upto 3,000 mm. but not requiring shoring. | 485 | Cu.M | 192.83 | ₹93,522.55 |
| 2 | Filling in foundation or plinth by silver sand in
layers not exceeding 150 mm as directed and
consolidating the same by thorough saturation with
water, ramming complete including the cost of supply
of sand. (payment to be made on measurement of
finished quantity) | 302.12 | Cu.M | 1,048.41 | ₹3,16,745.63 |
| 3 | Earth work in filling in compound, tank, low land, ditches etc. good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) | 233.5 | Cu.M | 419.58 | ₹97,971.93 |
| 4 | Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m.
a) In ground floor including roof. | - | Cu.M | 447 | - |
| 5 | Dismantling all types of plain cement concrete works, stackingserviceablematerialsat siteand removing rubbish as directed within alead of 75 m. In ground floor including roof. (a) upto 150 mm. thick | 5.47 | Cu.M | 939 | ₹5,136.33 |
| 6 | Dismantling R.C. floor,roof,beamsetc. including cutting rods and removing rubbish as directed withinaleadof75m. includingstackingof steel bars. (a) In ground floor including roof. | 15.81 | Cu.M | 1,956 | ₹30,924.36 |
| 7 | Removal of rubbish,earth etc. from theworking site and disposal of the same beyond the compound, in conformity with theMunicipal / CorporationRulesforsuchdisposal, loadinginto truckandcleaning the site inall respect asper direction of Engineer in charge | 27.4 | Cu.M | 166 | ₹4,548.4 |
| 8 | OrdinaryCement concrete (mix 1:2:4) with graded stone chips (20mm nominal size) excluding shuttering and reinforcement, if any, in ground floor as per relevant IS codes. a) Pakur Variety | 114.41 | Cu.M | 5,362.37 | ₹6,13,508.75 |
| 9 | ControlledCement concrete withwell gradedstonechips (20mmnominal size) excluding shuttering and reinforcement with complete design of concrete asper IS : 456and relevant special publications, submission of jobmix formula after preliminary mix design after testing of concrete cubes as per direction of Engineer-incharge.Consumption ofcementwillnotbelessthan 320Kg of cement with super plasticiser per cubicmeter of controlled concrete but actual consumption will be determined on the basis of preliminary test and jobmix foumula.In ground floor and foundation.[using concrete mixture] M 30 Grade
(i) Pakur Variety | 358.42 | Cu.M | 6,546.36 | ₹23,46,346.35 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.21 MB
DRW.pdf
Additional Documents • 0.39 MB
KMDAFormNo1.pdf
Tender Documents • 1.17 MB
Declaration.pdf
Tender Documents • 0.40 MB
TS.pdf
Tender Documents • 1.03 MB
STC.pdf
Tender Documents • 0.92 MB
BOQ_2474665.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .