Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹29.8 Cr
Closing Date
17 Sept 2026, 3:00 pm5d left
GM
TCIL Bhawan, GK-1, New Delhi-110048
Selection of Consortium partner for Request for Proposal for Selection of Master System Integrator (MSI) to Design, Implement, Integrate, Operate and Maintain Intelligent Traffic and Management and Enforcement System (ITMES) in Ahmedabad for 10 Years
2026_TCIL_289835_1
TCIL/ITCS/ITMES/0903
Open Tender
Information Technology
EOI
Ahemadanbad
Please refer Tender documents.
3 documents required · 3 mandatory
₹11,800
Payable To TCIL
₹29.8 Cr
3 Sept 2026
3 Sept 2026
18 Sept 2026
3 Sept 2026
17 Sept 2026
3 Sept 2026
Sr. System Components SITC of following items Unit of Measurement Existing Quantity proposed to be co-used Proposed new Quantity (Indicative) All inclusive, without GST (in INR) (to fulfil all requirements of the RFP)
Sr. System Components SITC of following items Unit of Measurement Existing Quantity proposed to be co-used Proposed new Quantity (Indicative) Unit Rate for SITC for each item Total CapEx Total OPEX for 10 years from date of Go-Live (including repair / replacement of components to maintain the SLA for entire project period.
1. ATCS Adaptive Traffic Control System ATCS Controller and Police Control Panel Controller Board, Outdoor Cabinet for Controller, Signal Light Cable and Power cable etc. And Manual Override switch for Traffic Police - Pole and / or booth Set (Per junction) 146 227
2. ATCS Adaptive Traffic Control System Vehicle Detector Covering all lanes of a arms Number (Per arm) 0 1385
3. ATCS Adaptive Traffic Control System Traffic Signal Aspects -Red Number (Per unit) 1500 2885
4. ATCS Adaptive Traffic Control System Traffic Signal Aspects – Amber Number (Per unit) 1500 2885
5. ATCS Adaptive Traffic Control System Traffic Signal Aspects -Green Arrow, Straight, Right & Left Number (Per unit) 4500 7534
6. ATCS Adaptive Traffic Control System Vehicle Countdown Timer Number (Per unit) 500 962
7. ATCS Adaptive Traffic Control System Pedestrian Countdown + Pedestrian Walk Man and Stop Man (combined) Number (Per unit) 0 2748
8. ATCS Adaptive Traffic Control System BRT Signals (Red and Green - combined) Number (Per unit) 0 238
9. ATCS Adaptive Traffic Control System Non-Motarized Cycle (Red and Green - combined) Number (Per unit) 0 100
10. ATCS Adaptive Traffic Control System Disabled Friendly Equipment with Audio Tactile Device and Pedestrian Push Button (Set per Junctions- irrespective of number of approaches) Set (per junction) 0 93
Sr. System Components SITC of following items Unit of Measurement Existing Quantity proposed to be co-used Proposed new Quantity (Indicative) All inclusive, without GST (in INR) (to fulfil all requirements of the RFP)
Sr. System Components SITC of following items Unit of Measurement Existing Quantity proposed to be co-used Proposed new Quantity (Indicative) Unit Rate for SITC for each item Total CapEx Total OPEX for 10 years from date of Go-Live (including repair / replacement of components to maintain the SLA for entire project period.
11. Violation Detection System Red Light, Stop Line Violation Detection System Red-Light Violation Detection (RLVD) and Stop-line violation Detection Evidence Camera Number / Set per arm (as per bidder solution) 0 1507
12 Violation Detection System Red Light, Stop Line Violation Detection System Video Analytics for Red Light Violation Detection Number / Set per arm (as per bidder solution) 0 1507
13 Violation Detection System Red Light, Stop Line Violation Detection System Video Analytics for Stop Line Violation Detection Number / Set per arm (as per bidder solution) 0 1507
14. Violation Detection System Red Light, Stop Line Violation Detection System ANPR Camera with external IR (covering all the lanes of the arm) Number (Per lane) 0 3651
15. Violation Detection System Red Light, Stop Line Violation Detection System Local processing unit and ancillary components including SD Card Number per junction 0 432
16. Violation Detection System Spot Speed VDS 4 Lane (single corridor) Speed Detection Sensor - 4D Radar Number / Set per location as per bidder solution 0 20
17. Violation Detection System Spot Speed VDS 4 Lane (single corridor) Evidence Camera with IR Number per location 0 20
18. Violation Detection System Spot Speed VDS 4 Lane (single corridor) ANPR Camera with external IR (covering all lanes of the corridor) Number per lane 0 80
19. Violation Detection System Spot Speed VDS 4 Lane (single corridor) Local processing unit and ancillary components including SD Card Number per location 0 20
20. Violation Detection System Spot Speed VDS 4 Lane (single corridor) Speed Display Number per location 0 20
21. Violation Detection System Spot Speed VDS 3 Lane (single corridor) Speed Detection Sensor - 4D Radar Number / Set per location as per bidder solution 0 20
22. Violation Detection System Spot Speed VDS 3 Lane (single corridor) Evidence Camera with IR Number per location 0 20
23. Violation Detection System Spot Speed VDS 3 Lane (single corridor) ANPR Camera with external IR (covering all lanes of the corridor) Number per lane 0 60
24. Violation Detection System Spot Speed VDS 3 Lane (single corridor) Local processing unit and ancillary components including SD Card Number per location 0 20
25 Violation Detection System Spot Speed VDS 3 Lane (single corridor) Speed Display Number per lane 0 20
26. Violation Detection System Spot Speed VDS 2 Lane (single corridor) Speed Detection Sensor - 4D Radar Number / Set per location as per bidder solution 0 20
27. Violation Detection System Spot Speed VDS 2 Lane (single corridor) Evidence Camera with IR Number per location 0 20
28. Violation Detection System Spot Speed VDS 2 Lane (single corridor) ANPR Camera with external IR (covering all lanes of the corridor) Number per lane 0 40
29. Violation Detection System Spot Speed VDS 2 Lane (single corridor) Local processing unit and ancillary components including SD Card Number per location 0 20
30 Violation Detection System Spot Speed VDS 2 Lane (single corridor) Speed Display Number per lane 0 20
31. Violation Detection System Spot Speed VDS 1 Lane Speed Detection Sensor - 4D Radar Number / Set per location as per bidder solution 0 10
32. Violation Detection System Spot Speed VDS 1 Lane Evidence Camera with IR Number per location 0 10
Sr. System Components SITC of following items Unit of Measurement Existing Quantity proposed to be co-used Proposed new Quantity (Indicative) All inclusive, without GST (in INR) (to fulfil all requirements of the RFP)
Sr. System Components SITC of following items Unit of Measurement Existing Quantity proposed to be co-used Proposed new Quantity (Indicative) Unit Rate for SITC for each item Total CapEx Total OPEX for 10 years from date of Go-Live (including repair / replacement of components to maintain the SLA for entire project period.
33. (single corridor) ANPR Camera with external IR (covering all lanes of the corridor) Number per lane 0 10
34. (single corridor) Local processing unit and ancillary components including SD Card Number per location 0 10
35 (single corridor) Speed Display Number per lane 0 10
36. Average Speed VDS Average Speed Calculation System between two junctions / location (using existing ANPR and evidence camera at those junctions / locations) Number per stretch 0 44
37. Additional ANPR ANPR Camera + IR (with LPU and ancillary components as required, including SD Card) (covering all lanes of the arm) Number per lanes 0 559
38. Additional Evidence Camera for FR and other analytics FR Camera + IR (with LPU and ancillary components as required) (covering all lanes of the arm) Number per location 0 100
39. Surveillance Camera Fixed Box / Bullet Camera Surveillance camera (8 MP) with mounting, SD Card support and SD card Set 0 50
40. Surveillance Camera PTZ Camera with mounting accessories, SD Card support and SD card Set 0 50
41. Other Analytics and violation detection Video Analytics for Lane Discipline VDS - at all SVDS locations (Overtaking from Left, Heavy Vehicles on Left most lane) Number of License per Camera (ANPR / Evidence Camera as applicable) 0 190
42 Other Analytics and violation detection Video Analytics for No Parking VDS Number of License per Camera (ANPR / Evidence Camera as applicable) 0 1385
43. Other Analytics and violation detection Video Analytics for Wrong Direction, Wrong Way Driving, Reverse Driving VDS, Illegal U-Turn Number of License per Camera (ANPR / Evidence Camera as applicable) 0 1855
44 Other Analytics and violation detection Illegal U-Turn Number of License per Camera (ANPR / Evidence Camera as applicable) 0 100
45 Other Analytics and violation detection Video Analytics for No- Helmet Number of License per Camera (ANPR / Evidence Camera as applicable) 0 3795
46 Other Analytics and violation detection Video Analytics for Triple Riding Number of License per Camera (ANPR / Evidence Camera as applicable) 0 3795
47 Other Analytics and violation detection Video Analytics for Seat Belt Violation Detection Number of License per Camera (ANPR / Evidence Camera as applicable) 0 3795
48 Other Analytics and violation detection Video Analytics for Mobile phone use violation Detection Number of License per Camera (ANPR / Evidence Camera as applicable) 0 3795
49 Other Analytics and violation detection Video Analytics for Traffic accidents and incidents Number of License per Camera (ANPR / Evidence Camera as applicable) 0 1575
50. Other Analytics and violation detection Detection of Class of Vehicle illegally plying in no-entry (Eg. no other vehicles are allowed in BRTS lanes) Number of License per Camera (ANPR / Evidence Camera as applicable) 0 476
51. Other Analytics and violation detection Unauthorized vehicle movement (as per class of vehicle and time of day etc.) Number of License per Camera (ANPR / Evidence Camera as applicable) 0 100
52 Other Analytics and violation detection Video Analytics for Traffic accidents and incidents Number of License per Camera (ANPR / Evidence Camera as applicable) 0 1575
53 Other Analytics and violation detection Unusual Traffic Snarl (based on past trends) Number of License per Camera (ANPR / Evidence Camera as applicable) 0 1575
54. Other Analytics and violation detection Number Plate Recognition for chain, purse and ornaments snatching Number of License per Camera (ANPR / Evidence Camera as applicable) 0 1575
55. Other Analytics and violation detection Number Plate Recognition for Stalking/ following women in public places/ Isolated areas during day and night Number of License per Camera (ANPR / Evidence Camera as applicable) 0 1575
Sr. System Components SITC of following items Unit of Measurement Existing Quantity proposed to be co-used Proposed new Quantity (Indicative) All inclusive, without GST (in INR) (to fulfil all requirements of the RFP)
Sr. System Components SITC of following items Unit of Measurement Existing Quantity proposed to be co-used Proposed new Quantity (Indicative) Unit Rate for SITC for each item Total CapEx Total OPEX for 10 years from date of Go-Live (including repair / replacement of components to maintain the SLA for entire project period.
56 Number Plate Recognition for Group of bikers 0 1575
57. Crossing of pedestrians off-Zebra Crossing in large number and multiple times (trend analysis) 0 1385
58. Video Analytics for detection of commuter throwing garbage on road from the vehicle 0 3036
59 Video Analytics for detection of damaged infrastructure 0 3036
60 Video Analytics for detection of Potholes on Road 0 3036
61 Video Analytics for detection of Cattle on road 0 1897
62 Video Analytics for detection of uncovered debris in truck 0 3795
63. Video Analytics for detection of commuter Spitting on the road from the vehicle 0 3795
64. Video Analytics for detection of faded stop lines & zebra crossings 0 1567
65 Video Analytics for detection of water logging 0 1567
66 Video Analytics for Facial Recognition 0 100
67 Video Analytics for Video summarization 0 100
68. Video Analytics for Video summarization - concurrent client license 0 5
69 Encroachment Detection 0 3036
70 Visual Clutter Detection 0 3036
71 Vagabond/Beggar Loitering detection 0 3036
72. Document related Video Analytics for Non – Standard Number Plates LumpSum for all ANPR camera 0 1
73. Document related eDetection - Restricted Vehicle Type/ Over Dimensional Cargo, Other Vehicle Document Related Violation To be included 0 1 To be included
74. Other field components VMS + WMS + AQI Variable Messaging Signages (7.68 mtr. X 2.95 mtr.) VMS + VMS Controller + Box Set per location 0 200
75. Other field components VMS + WMS + AQI Variable Messaging Signages - Customized curved / wrap around display VMS + VMS Controller + Box Per Meter Square 0 600 (approx. 15 to 40 quantity)
76 Other field components VMS + WMS + AQI Weather Monitoring Set per location 0 20
77 Other field components VMS + WMS + AQI AQI Monitoring Set per location 0 20
78 Other field components VMS + WMS + AQI GPS based Vehicle Tracking Set per vehicle 0 369
79. Std. and Cantilever Pole Traffic Signals and ATCS (including Aspects and VDC) Galvanized Standard Poles with Foundation - 4.5 mtr (Traffic + Pedestrian + BRT) Number 500 1328
80. Std. and Cantilever Pole Traffic Signals and ATCS (including Aspects and VDC) Galvanized LED Cantilever Poles with Foundation - (6 - 9) mtr as per site requirement (for existing and new signals) - parabolic cantilever poles Number 0 750
81. Std. and Cantilever Pole Traffic Signals and ATCS (including Aspects and VDC) Galvanized LED Cantilever Poles with Foundation - (6 - 9) mtr as per site requirement (for existing and new signals) -angular (90°) LED cantilever poles Number 0 761
82. Std. and Cantilever Pole VDS at junctions Galvanized Cantilever Poles with Foundation - 9 mtr- for VDS at Junction Number 0 1648
Sr. System Components SITC of following items Unit of Measurement Existing Quantity proposed to be co-used Proposed new Quantity (Indicative) All inclusive, without GST (in INR) (to fulfil all requirements of the RFP)
Sr. System Components SITC of following items Unit of Measurement Existing Quantity proposed to be co-used Proposed new Quantity (Indicative) Unit Rate for SITC for each item Total CapEx Total OPEX for 10 years from date of Go-Live (including repair / replacement of components to maintain the SLA for entire project period.
83. VDS dedicated location Galvanized LED Standard Poles with Foundation - (6 - 9) mtr as per site requirement Number 0 559
84. Gantry for VDS Galvanized Gantry (4 - 5 lanes) Number 0 84
85. Spot Speed Locations Galvanized Cantilever Poles with Foundation - 9 mtr Number 0 70
86. For VMS Galvanized Standard Poles with Foundation - 6 to 9 mtr- (as per site requirement) Number 0 240
87. Galvanized Standard Poles with Foundation - 6 to 9 mtr- (as per site requirement) Number 0 20
ԀༀԀကԀᄀԀሀԀ ⠀Ԁ⤀Ԁ⨀Ԁ⬀ԀⰀԀⴀԀ⸀Ԁ⼀Ԁ ԀԀ㈀Ԁ㐀Ԁ㔀Ԁ㘀Ԁ㜀Ԁ㠀Ԁ㤀Ԁ㰀Ԁ㼀Ԁ 笀ԃ簀ԃ缀ԃ耀ԃ脀ԃ舀ԃ茀ԃ萀ԃ蔀ԃ蘀ԃ蜀ԃ謀܃谀܃錀܃鐀ԃ销ԃ需ԃ頀ԃ鰀ԃ鴀ԃꀀԃꄀԃꐀԃꔀԃꘀԃ꜀ԃꠀԃ꤀ԃꨀԃԃ가ԃ글ԃ꼀ԃ뀀ԃ넀ԃ눀ԃ대ԃ됀ԃ똀ԃ뜀ԃ뤀ԃ먀ԃ묀ԃ밀ԃ봀ԃ쀀ԃ섀ԃ ࠀ界灭畳 敳⁴獡瀠牥爠煥極敲敭瑮 Ĉ〵.Ԁ稀ࠀ_〵䬠䅖洠摯汵牡唠卐眠瑩楌椭湯戠瑡整祲戠湡楷桴㘠‰業慢正灵ⴠ愠⁴硥獩楴杮唠卐愠摮戠瑡整祲爠潯獡瀠牥删偆匊数楣楦慣楴湯 !"#$%&'()+,-0123456789:>?@ACDEFLMNPQRSTUVWX\]^_abcdefghijmnopqrstuvwx؈倀牥唠楮tԀĀԀȀԀ̀ԀЀԀԀԀ⌀湉整湲污䐠浯慃敭慲椨敲畱物摥ܩ界灭畓ѭࠀ㔱⸲@㌈䄀捣獥潃瑮潲祓瑳浥映牯匠牥敶潲浯愠摮唠卐爠潯੭椨敲畱物摥)ԀԀ܀ԀࠀԀऀԀԀԀఀԀԀༀԀကԀሀԀጀԀ᐀ԀᔀԀᘀԀᜀԀ᠀ԀᤀԀᨀԀᰀԀᴀԀḀԀἀԀ Ԁ℀Ԁ∀Ԁ⌀Ԁ─Ԁ☀Ԁ✀Ԁ⤀Ԁ⨀Ԁ⬀ԀⴀԀ⸀Ԁ⼀Ԁ ԀԀ㌀Ԁ㐀Ԁ㘀Ԁ㜀Ԁ㠀Ԁ㤀Ԁ㨀Ԁ㬀Ԁ㰀Ԁ㴀Ԁ㸀Ԁ㼀ԀЀࠀ㔱⸳Z䜈䄀摤敲獳扡敬䘠物污牡祳瑳浥映牯猠牥敶潲浯☠唠卐爠潯੭倨湡汥⬠䐠瑥捥潴獲⬠愠慬浲瑥)ԀԀԀԀ܀ԀࠀԀऀԀԀఀԀഀԀကԀᄀԀሀԀጀԀ᐀ԀᔀԀᘀԀᜀԀ᠀ԀᤀԀᨀԀᬀԀᰀԀᴀԀḀԀἀԀ℀Ԁ∀Ԁ⌀Ԁ␀Ԁ─Ԁ☀Ԁ✀Ԁ⠀Ԁ⤀Ԁ⬀ԀⰀԀⴀԀ⸀Ԁ⼀Ԁ ԀԀ㌀Ԁ㐀Ԁ㔀Ԁ㤀Ԁ㨀Ԁ㬀Ԁ㰀Ԁ㴀Ԁ㸀Ԁ㼀Ԁ䀀Ԁ䄀Ԁ䈀Ԁ䌀Ԁ䐀Ԁ䠀Ԁ䤀Ԁ䨀Ԁ䬀Ԁ䰀Ԁ䴀Ԁ一Ԁ伀Ԁ倀Ԁ儀Ԁ刀Ԁ吀Ԁ唀Ԁ嘀Ԁ圀ԀЀࠀ㔱⸴<ㄈ䘀物硥楴杮極桳牥映牯匠牥敶潲浯愠摮唠卐爠潯੭椨敲畱物摥)ԀĀԀȀԀЀԀԀԀ܀ԀࠀԀԀఀԀഀԀԀༀԀᄀԀሀԀᔀԀᘀԀᜀԀ᠀ԀᤀԀᨀԀᰀԀᴀԀḀ 眠牯晫牯散†映牯†〱†番据楴湯†湩†慰慲汬汥䄊数楢摤牥爠煥極敲敭瑮⠠敲敬慶瑮攠灸牥獴䕏⁍整浡ⱳ漠数慲潴獲潣普杩牵湩瑳晡ⱦ朠潲湵瑳晡ⱦ猠慴敫潨摬牥挠潯摲湩瑡潩瑳晡瑥)ԀĀԀȀԀ̀ԀЀԀԀԀԀ܀ԀࠀԀऀԀԀԀఀԀഀԀԀༀԀကԀᄀԀሀԀጀԀ᐀ԀᔀԀᘀԀ᠀ԀᤀԀᨀԀᬀԀᰀԀᴀԀḀԀἀԀ Ԁ℀Ԁ∀Ԁ⌀Ԁ␀Ԁ─Ԁ☀Ԁ✀Ԁ⠀Ԁ⤀Ԁ⨀Ԁ⬀ԀⰀԀⴀԀ⸀Ԁ ԀԀ㈀Ԁ㌀Ԁ㔀Ԁ㘀Ԁ㜀Ԁ㠀Ԁ㤀Ԁ㨀Ԁ㬀Ԁ㴀Ԁ㸀Ԁ㼀Ԁ䀀Ԁ䄀Ԁ䈀Ԁ䌀Ԁ䐀Ԁ䘀Ԁ䜀Ԁ䠀Ԁ䨀Ԁ䬀Ԁ䰀Ԁ䴀Ԁ一Ԁ伀Ԁ倀Ԁ儀Ԁ刀Ԁ匀Ԁ吀Ԁ娀Ԁ尀Ԁ崀Ԁ帀Ԁ开Ԁ怀Ԁ愀Ԁ戀Ԁ挀Ԁ最Ԁ栀Ԁ椀Ԁ欀Ԁ氀Ԁ漀Ԁ瀀Ԁ焀Ԁ猀Ԁ琀Ԁ甀Ԁ瘀Ԁ眀Ԁ砀Ԁ礀Ԁ笀Ԁ簀Ԁ紀Ԁ縀Ԁ缀Ԁ耀Ԁ脀Ԁ蘀Ԁ蜀Ԁ蠀Ԁ褀Ԁ言Ԁ謀Ԁ谀Ԁ贀Ԁ踀Ԁ輀Ԁ退Ԁ鄀Ԁ鈀Ԁ鐀Ԁ销Ԁ阀Ԁ需Ԁ頀Ԁ餀Ԁ鰀Ԁ鴀Ԁ鸀Ԁ鼀ԀꀀԀꄀԀꈀԀꐀԀꔀԀꘀԀꠀԀ꤀Ԁ관Ԁ글Ԁ꼀Ԁ뀀Ԁ넀Ԁ똀Ԁ뜀Ԁ렀Ԁ뤀Ԁ먀Ԁ묀Ԁ밀Ԁ봀Ԁ븀Ԁ뼀Ԁ쀀Ԁ쐀Ԁ씀Ԁ준Ԁ쨀Ԁ쬀Ԁ츀Ԁ케Ԁ퐀Ԁ픀Ԁ혀Ԁ휀ԀԀԀԀԀԀԀԀԀԀԀ☀ࠀ界灭猠浵ਊ愨数牰橯捥⁴敲畱物浥湥⥴ !"#$%Ĉ㔷.Ԁ─ࠀ♏⁍慍灮睯牥ਊ愨敤楦敮湩琠敨删偆)Ԁ̀ԀЀԀԀԀԀԀԀԀༀԀᄀԀሀԀጀԀ᐀ԀᔀԀᘀԀᜀԀᤀԀᨀԀᰀԀᴀԀ Ԁ℀Ԁ∀Ԁ㤀ࠀ"呉卍䔠灸牥ੴ䄊⁴敬獡⁴湯䈠獵湩獥潨牵湡畢楳敮獳搠祡sԀĀԀȀԀ̀ԀЀԀԀԀԀ܀ԀࠀԀऀԀԀഀԀༀԀကԀᔀԀᘀԀ᠀ԀᤀԀᬀԀᰀԀ℀Ԁ∀Ԁ␀Ԁ─Ԁ☀Ԁ✀Ԁ⠀Ԁ⬀ԀⰀԀ⸀Ԁ⼀Ԁ㐀Ԁ㔀Ԁ㘀ԀЀࠀ㜱⸶X䀈吀慲晦捩䔠杮湩敥 汐湡敮湡呁千䔠灸牥ੴ䄊⁴敬獡⁴湯䈠獵湩獥潨牵湡畢楳敮獳搠祡sԀĀԀȀԀ̀ԀЀԀԀԀ܀ԀࠀԀऀԀԀԀఀԀഀԀԀༀԀကԀᄀԀሀԀጀԀ᐀ԀᔀԀᘀԀᜀԀ᠀ԀᤀԀᨀԀᬀԀᰀԀᴀԀḀԀἀԀ Ԁ℀Ԁ∀Ԁ⌀Ԁ␀Ԁ─Ԁ☀Ԁ✀Ԁ⠀Ԁ⤀ԀⰀԀ⸀Ԁ⼀Ԁ㐀Ԁ㔀Ԁ㜀Ԁ㠀Ԁ㨀Ԁ㬀Ԁ䀀Ԁ䄀Ԁ䌀Ԁ䐀Ԁ䔀Ԁ䘀Ԁ䜀Ԁ䨀Ԁ䬀Ԁ䴀Ԁ一Ԁ匀Ԁ吀Ԁ唀ԀЀࠀ㜱⸷Q䜈䰀慥牔晡楦慍慮敧敭瑮䌠湥整灏牥瑡牯ਊ㈨‴⁸ⰷ椠潣灭楬湡散眠瑩慬潢牵氠睡⥳ !"#$%&)*,-./12456789:;<=>?@ABDEFGIJKLMNO ਈ倀牥倠獯瑩潩nԀĀԀȀԀ̀ԀЀԀԀԀԀ܀ԀԀԀЀࠀ㜱⸸~椈䄀䍔⁓湡楓畭慬楴湯†灏牥瑡牯ੳ㈨‴⁸ⰷ椠潣灭楬湡散眠瑩慬潢牵氠睡⥳䴠湩㈠映潲‷浡琠ㄱ瀠䴊湩ㄠ映潲ㄱ瀠潴㜠愠mԀĀԀȀԀ̀ԀЀԀԀԀԀ܀ԀࠀԀऀԀԀԀఀԀഀԀԀༀԀကԀᄀԀሀԀጀԀ᐀ԀᔀԀᘀԀᜀԀ᠀ԀᤀԀᨀԀᬀԀᰀԀᴀԀἀԀ Ԁ∀Ԁ⌀Ԁ␀Ԁ─Ԁ✀Ԁ⠀Ԁ⨀Ԁ⬀ԀⰀԀⴀԀ⸀Ԁ⼀Ԁ ԀԀ㈀Ԁ㌀Ԁ㐀Ԁ㔀Ԁ㘀Ԁ㜀Ԁ㠀Ԁ㨀Ԁ㬀Ԁ㰀Ԁ㴀Ԁ㼀Ԁ䀀Ԁ䄀Ԁ䈀Ԁ䌀Ԁ䐀Ԁ䔀Ԁ䜀Ԁ䠀Ԁ䬀Ԁ䰀Ԁ䴀Ԁ一Ԁ倀Ԁ儀Ԁ刀Ԁ匀Ԁ吀Ԁ唀Ԁ嘀Ԁ圀Ԁ夀Ԁ娀Ԁ尀Ԁ崀Ԁ开Ԁ怀Ԁ愀Ԁ搀Ԁ最Ԁ栀Ԁ椀Ԁ樀Ԁ氀Ԁ洀Ԁ渀Ԁ漀Ԁ瀀Ԁ焀Ԁ猀Ԁ琀Ԁ瘀Ԁ眀Ԁ礀Ԁ稀Ԁ笀Ԁ簀Ԁ紀Ԁ᐀ࠀ敐桓晩⁴潐楳楴湯 ᄈ䴀湩浩浵㌠猠楨瑦ⴊ瀠獯瑩潩nԀЀԀԀԀ܀ԀࠀԀऀԀԀԀఀԀഀԀԀကԀᄀԀሀԀᔀԀᘀԀᜀԀЀࠀ㜱⸹o师䤀䵔⁓灏牥瑡牯ੳ㈨‴⁸ⰷ椠潣灭楬湡散眠瑩慬潢牵氠睡⥳䴠湩ㄠ‰牦浯ⴠ㜠愠潴ㄠ‱浰ਮ楍″牦浯ⴠㄠ‱浰琠‷浡 !"#$%&'(*+,-/01234578;<=>?@ACDEFGHIJKLMNOPQRSUXYZ[]^_`abdeghjklmnဈ䴀湩浩浵㈠″桳晩⁴潰楳楴湯 Ĉ〸.Ԁ氀ࠀW䵔⁃灏牥瑡牯⠊㐲砠㜠湩挠浯汰慩据楷桴氠扡畯慬獷 楍″牦浯ⴠ㜠愠潴ㄠ‱浰ਮ楍‱牦浯ⴠㄠ‱浰琠‷浡 !"#$%&()*+-./0123569:;<>?@ABCDEGHJKMNORUVWXZ[\]^_abdeghijkᄈ䴀湩浩浵㜠猠楨瑦ⴊ瀠獯瑩潩nԀЀԀԀԀ܀ԀࠀԀऀԀԀԀఀԀഀԀԀကԀᄀԀሀԀᔀԀᘀԀᜀԀЀࠀ㠱⸱G㸈䐀瑡敃瑮牥䠠牡睤牡湅楧敮牥ਊ㈨‴⁸ⰷ椠潣灭楬湡散眠瑩慬潢牵氠睡⥳ "#$%'(*+,-./012345678:;<=?@ABCDEĈ㈸.Ԁ嘀ࠀK敎睴牯湅楧敮牥⼠丠瑥潷歲匠捥牵瑩⁹湅楧敮牥ਊ㈨‴⁸ⰷ椠潣灭楬湡散眠瑩慬潢牵氠睡⥳ !"#$%&'()*+./1234679:;<=>?@ABCDEFGIJKLNOPQRSTĈ㌸.Ԁ␀ࠀ 楆汥敒慰物愠摮䴠楡瑮湥湡散匠慴晦 !"#ఈ䈀摩敤潴瀠潲潰敳 Ĉ㐸.Ԁ怀ࠀF䵔⁃畓灰牯⁴瑓晡ⱦ䘠捡汩瑩⁹慍慮敧敭瑮敓畣楲祴匠慴晦ਊ㈨‴⁸ⰷ椠潣灭楬湡散眠瑩慬潢牵氠睡⥳ !"#$%'()*+0123489;<=>@ACDEFGHIJKLMNOPQSTUVXYZ[\]^ ਈ匀扵ⴠ吠瑯污 ' 䤀洀瀀氀攀洀攀渀琀愀琀椀漀渀䌀栀愀爀最攀猀 ᰀ传渀攀吀椀洀攀 䌀愀瀀攀砀ᴀ ԀĀԀȀԀ̀ԀԀ܀ԀࠀԀԀԀఀԀഀԀༀԀကԀᄀԀሀԀጀԀ᐀ԀᔀԀᘀԀᜀԀ᠀ԀᤀԀᰀԀᴀԀḀԀἀԀ Ԁ℀Ԁ∀Ԁ⌀Ԁ␀Ԁ─Ԁ㘀ऀ)Operations and Maintenance Charges “Opex for 10 years” !"#$%&'()*,-/012345*⠈䜀慲摮吠瑯污⠊污湩汣獵癩ⱥ攠捸畬楤杮䜠呓)ԀĀԀȀԀ̀ԀЀԀԀԀԀ܀ԀࠀԀऀԀԀఀԀഀԀԀༀԀကԀᄀԀሀԀጀԀ᐀ԀᔀԀᘀԀᜀԀ᠀ԀᤀԀᬀԀᰀԀᴀԀḀԀἀԀ Ԁ℀Ԁ∀Ԁ⌀Ԁ␀Ԁ─Ԁ☀Ԁ✀Ԁ⠀Ԁ⤀Ԁကࠀ⁁‽慃䕰⁸灏硅 䜀呓倠牥散瑮条॥匨祡ㄠ┸ऩ升⁔潔慴ᙬ⁂‽⁁升⁔敐捲湥慴敧*✈䜀慲摮吠瑯污⠊污湩汣獵癩ⱥ椠据畬楤杮䜠呓)ԀĀԀȀԀ̀ԀЀԀԀԀԀ܀ԀࠀԀऀԀԀఀԀഀԀԀༀԀကԀᄀԀሀԀጀԀ᐀ԀᔀԀᘀԀᜀԀ᠀ԀᤀԀᬀԀᰀԀᴀԀḀԀ Ԁ℀Ԁ∀Ԁ⌀Ԁ␀Ԁ─Ԁ☀Ԁ✀Ԁ⠀Ԁ⤀Ԁऀࠀ ⁃‽⁁BԀĀԀȀԀ̀ԀЀԀԀԀԀ܀ԀࠀԀऀ剐䍉⁅䥂ቄ䅎䕍传⁆䡔⁅䥂䑄剅 0
⠀Ԁ⤀Ԁ⨀Ԁ⬀ԀⰀԀⴀԀ⸀Ԁ⼀Ԁ ԀԀ㈀Ԁ㐀Ԁ㔀Ԁ㘀Ԁ㜀Ԁ㠀Ԁ㤀Ԁ㰀Ԁ㼀Ԁ 笀ԃ簀ԃ缀ԃ耀ԃ脀ԃ舀ԃ茀ԃ萀ԃ蔀ԃ蘀ԃ蜀ԃ謀܃谀܃錀܃鐀ԃ销ԃ需ԃ頀ԃ鰀ԃ鴀ԃꀀԃꄀԃꐀԃꔀԃꘀԃ꜀ԃꠀԃ꤀ԃꨀԃԃ가ԃ글ԃ꼀ԃ뀀ԃ넀ԃ눀ԃ대ԃ됀ԃ똀ԃ뜀ԃ뤀ԃ먀ԃ묀ԃ밀ԃ봀ԃ쀀ԃ섀ԃ ࠀ界灭畳 敳⁴獡瀠牥爠煥極敲敭瑮 Ĉ〵.Ԁ稀ࠀ_〵䬠䅖洠摯汵牡唠卐眠瑩楌椭湯戠瑡整祲戠湡楷桴㘠‰業慢正灵ⴠ愠⁴硥獩楴杮唠卐愠摮戠瑡整祲爠潯獡瀠牥删偆匊数楣楦慣楴湯 !"#$%&'()+,-0123456789:>?@ACDEFLMNPQRSTUVWX\]^_abcdefghijmnopqrstuvwx؈倀牥唠楮tԀĀԀȀԀ̀ԀЀԀԀԀ⌀湉整湲污䐠浯慃敭慲椨敲畱物摥ܩ界灭畓ѭࠀ㔱⸲@㌈䄀捣獥潃瑮潲祓瑳浥映牯匠牥敶潲浯愠摮唠卐爠潯੭椨敲畱物摥)ԀԀ܀ԀࠀԀऀԀԀԀఀԀԀༀԀကԀሀԀጀԀ᐀ԀᔀԀᘀԀᜀԀ᠀ԀᤀԀᨀԀᰀԀᴀԀḀԀἀԀ Ԁ℀Ԁ∀Ԁ⌀Ԁ─Ԁ☀Ԁ✀Ԁ⤀Ԁ⨀Ԁ⬀ԀⴀԀ⸀Ԁ⼀Ԁ ԀԀ㌀Ԁ㐀Ԁ㘀Ԁ㜀Ԁ㠀Ԁ㤀Ԁ㨀Ԁ㬀Ԁ㰀Ԁ㴀Ԁ㸀Ԁ㼀ԀЀࠀ㔱⸳Z䜈䄀摤敲獳扡敬䘠物污牡祳瑳浥映牯猠牥敶潲浯☠唠卐爠潯੭倨湡汥⬠䐠瑥捥潴獲⬠愠慬浲瑥)ԀԀԀԀ܀ԀࠀԀऀԀԀఀԀഀԀကԀᄀԀሀԀጀԀ᐀ԀᔀԀᘀԀᜀԀ᠀ԀᤀԀᨀԀᬀԀᰀԀᴀԀḀԀἀԀ℀Ԁ∀Ԁ⌀Ԁ␀Ԁ─Ԁ☀Ԁ✀Ԁ⠀Ԁ⤀Ԁ⬀ԀⰀԀⴀԀ⸀Ԁ⼀Ԁ ԀԀ㌀Ԁ㐀Ԁ㔀Ԁ㤀Ԁ㨀Ԁ㬀Ԁ㰀Ԁ㴀Ԁ㸀Ԁ㼀Ԁ䀀Ԁ䄀Ԁ䈀Ԁ䌀Ԁ䐀Ԁ䠀Ԁ䤀Ԁ䨀Ԁ䬀Ԁ䰀Ԁ䴀Ԁ一Ԁ伀Ԁ倀Ԁ儀Ԁ刀Ԁ吀Ԁ唀Ԁ嘀Ԁ圀ԀЀࠀ㔱⸴<ㄈ䘀物硥楴杮極桳牥映牯匠牥敶潲浯愠摮唠卐爠潯੭椨敲畱物摥)ԀĀԀȀԀЀԀԀԀ܀ԀࠀԀԀఀԀഀԀԀༀԀᄀԀሀԀᔀԀᘀԀᜀԀ᠀ԀᤀԀᨀԀᰀԀᴀԀḀ 0
⠀Ԁ⤀Ԁ⨀Ԁ⬀ԀⰀԀⴀԀ⸀Ԁ⼀Ԁ ԀԀ㈀Ԁ㐀Ԁ㔀Ԁ㘀Ԁ㜀Ԁ㠀Ԁ㤀Ԁ㰀Ԁ㼀Ԁ 笀ԃ簀ԃ缀ԃ耀ԃ脀ԃ舀ԃ茀ԃ萀ԃ蔀ԃ蘀ԃ蜀ԃ謀܃谀܃錀܃鐀ԃ销ԃ需ԃ頀ԃ鰀ԃ鴀ԃꀀԃꄀԃꐀԃꔀԃꘀԃ꜀ԃꠀԃ꤀ԃꨀԃԃ가ԃ글ԃ꼀ԃ뀀ԃ넀ԃ눀ԃ대ԃ됀ԃ똀ԃ뜀ԃ뤀ԃ먀ԃ묀ԃ밀ԃ봀ԃ쀀ԃ섀ԃ ࠀ界灭畳 敳⁴獡瀠牥爠煥極敲敭瑮 Ĉ〵.Ԁ稀ࠀ_〵䬠䅖洠摯汵牡唠卐眠瑩楌椭湯戠瑡整祲戠湡楷桴㘠‰業慢正灵ⴠ愠⁴硥獩楴杮唠卐愠摮戠瑡整祲爠潯獡瀠牥删偆匊数楣楦慣楴湯 !"#$%&'()+,-0123456789:>?@ACDEFLMNPQRSTUVWX\]^_abcdefghijmnopqrstuvwx؈倀牥唠楮tԀĀԀȀԀ̀ԀЀԀԀԀ⌀湉整湲污䐠浯慃敭慲椨敲畱物摥ܩ界灭畓ѭࠀ㔱⸲@㌈䄀捣獥潃瑮潲祓瑳浥映牯匠牥敶潲浯愠摮唠卐爠潯੭椨敲畱物摥)ԀԀ܀ԀࠀԀऀԀԀԀఀԀԀༀԀကԀሀԀጀԀ᐀ԀᔀԀᘀԀᜀԀ᠀ԀᤀԀᨀԀᰀԀᴀԀḀԀἀԀ Ԁ℀Ԁ∀Ԁ⌀Ԁ─Ԁ☀Ԁ✀Ԁ⤀Ԁ⨀Ԁ⬀ԀⴀԀ⸀Ԁ⼀Ԁ ԀԀ㌀Ԁ㐀Ԁ㘀Ԁ㜀Ԁ㠀Ԁ㤀Ԁ㨀Ԁ㬀Ԁ㰀Ԁ㴀Ԁ㸀Ԁ㼀ԀЀࠀ㔱⸳Z䜈䄀摤敲獳扡敬䘠物污牡祳瑳浥映牯猠牥敶潲浯☠唠卐爠潯੭倨湡汥⬠䐠瑥捥潴獲⬠愠慬浲瑥)ԀԀԀԀ܀ԀࠀԀऀԀԀఀԀഀԀကԀᄀԀሀԀጀԀ᐀ԀᔀԀᘀԀᜀԀ᠀ԀᤀԀᨀԀᬀԀᰀԀᴀԀḀԀἀԀ℀Ԁ∀Ԁ⌀Ԁ␀Ԁ─Ԁ☀Ԁ✀Ԁ⠀Ԁ⤀Ԁ⬀ԀⰀԀⴀԀ⸀Ԁ⼀Ԁ ԀԀ㌀Ԁ㐀Ԁ㔀Ԁ㤀Ԁ㨀Ԁ㬀Ԁ㰀Ԁ㴀Ԁ㸀Ԁ㼀Ԁ䀀Ԁ䄀Ԁ䈀Ԁ䌀Ԁ䐀Ԁ䠀Ԁ䤀Ԁ䨀Ԁ䬀Ԁ䰀Ԁ䴀Ԁ一Ԁ伀Ԁ倀Ԁ儀Ԁ刀Ԁ吀Ԁ唀Ԁ嘀Ԁ圀ԀЀࠀ㔱⸴<ㄈ䘀物硥楴杮極桳牥映牯匠牥敶潲浯愠摮唠卐爠潯੭椨敲畱物摥)ԀĀԀȀԀЀԀԀԀ܀ԀࠀԀԀఀԀഀԀԀༀԀᄀԀሀԀᔀԀᘀԀᜀԀ᠀ԀᤀԀᨀԀᰀԀᴀԀḀ 0
⠀Ԁ⤀Ԁ⨀Ԁ⬀ԀⰀԀⴀԀ⸀Ԁ⼀Ԁ ԀԀ㈀Ԁ㐀Ԁ㔀Ԁ㘀Ԁ㜀Ԁ㠀Ԁ㤀Ԁ㰀Ԁ㼀Ԁ 笀ԃ簀ԃ缀ԃ耀ԃ脀ԃ舀ԃ茀ԃ萀ԃ蔀ԃ蘀ԃ蜀ԃ謀܃谀܃錀܃鐀ԃ销ԃ需ԃ頀ԃ鰀ԃ鴀ԃꀀԃꄀԃꐀԃꔀԃꘀԃ꜀ԃꠀԃ꤀ԃꨀԃԃ가ԃ글ԃ꼀ԃ뀀ԃ넀ԃ눀ԃ대ԃ됀ԃ똀ԃ뜀ԃ뤀ԃ먀ԃ묀ԃ밀ԃ봀ԃ쀀ԃ섀ԃ ࠀ界灭畳 敳⁴獡瀠牥爠煥極敲敭瑮 Ĉ〵.Ԁ稀ࠀ_〵䬠䅖洠摯汵牡唠卐眠瑩楌椭湯戠瑡整祲戠湡楷桴㘠‰業慢正灵ⴠ愠⁴硥獩楴杮唠卐愠摮戠瑡整祲爠潯獡瀠牥删偆匊数楣楦慣楴湯 !"#$%&'()+,-0123456789:>?@ACDEFLMNPQRSTUVWX\]^_abcdefghijmnopqrstuvwx؈倀牥唠楮tԀĀԀȀԀ̀ԀЀԀԀԀ⌀湉整湲污䐠浯慃敭慲椨敲畱物摥ܩ界灭畓ѭࠀ㔱⸲@㌈䄀捣獥潃瑮潲祓瑳浥映牯匠牥敶潲浯愠摮唠卐爠潯੭椨敲畱物摥)ԀԀ܀ԀࠀԀऀԀԀԀఀԀԀༀԀကԀሀԀጀԀ᐀ԀᔀԀᘀԀᜀԀ᠀ԀᤀԀᨀԀᰀԀᴀԀḀԀἀԀ Ԁ℀Ԁ∀Ԁ⌀Ԁ─Ԁ☀Ԁ✀Ԁ⤀Ԁ⨀Ԁ⬀ԀⴀԀ⸀Ԁ⼀Ԁ ԀԀ㌀Ԁ㐀Ԁ㘀Ԁ㜀Ԁ㠀Ԁ㤀Ԁ㨀Ԁ㬀Ԁ㰀Ԁ㴀Ԁ㸀Ԁ㼀ԀЀࠀ㔱⸳Z䜈䄀摤敲獳扡敬䘠物污牡祳瑳浥映牯猠牥敶潲浯☠唠卐爠潯੭倨湡汥⬠䐠瑥捥潴獲⬠愠慬浲瑥)ԀԀԀԀ܀ԀࠀԀऀԀԀఀԀഀԀကԀᄀԀሀԀጀԀ᐀ԀᔀԀᘀԀᜀԀ᠀ԀᤀԀᨀԀᬀԀᰀԀᴀԀḀԀἀԀ℀Ԁ∀Ԁ⌀Ԁ␀Ԁ─Ԁ☀Ԁ✀Ԁ⠀Ԁ⤀Ԁ⬀ԀⰀԀⴀԀ⸀Ԁ⼀Ԁ ԀԀ㌀Ԁ㐀Ԁ㔀Ԁ㤀Ԁ㨀Ԁ㬀Ԁ㰀Ԁ㴀Ԁ㸀Ԁ㼀Ԁ䀀Ԁ䄀Ԁ䈀Ԁ䌀Ԁ䐀Ԁ䠀Ԁ䤀Ԁ䨀Ԁ䬀Ԁ䰀Ԁ䴀Ԁ一Ԁ伀Ԁ倀Ԁ儀Ԁ刀Ԁ吀Ԁ唀Ԁ嘀Ԁ圀ԀЀࠀ㔱⸴<ㄈ䘀物硥楴杮極桳牥映牯匠牥敶潲浯愠摮唠卐爠潯੭椨敲畱物摥)ԀĀԀȀԀЀԀԀԀ܀ԀࠀԀԀఀԀഀԀԀༀԀᄀԀሀԀᔀԀᘀԀᜀԀ᠀ԀᤀԀᨀԀᰀԀᴀԀḀ 0
Sr. System Components SITC of following items Unit of Measurement Existing Quantity proposed to be co-used Proposed new Quantity (Indicative) All inclusive, without GST (in INR) (to fulfil all requirements of the RFP)
Sr. System Components SITC of following items Unit of Measurement Existing Quantity proposed to be co-used Proposed new Quantity (Indicative) Unit Rate for SITC for each item Total CapEx Total OPEX for 10 years from date of Go-Live (including repair / replacement of components to maintain the SLA for entire project period.
Set per location 0
Sr. SITC of following items Unit of Measurement Existing Quantity proposed to be co-used Proposed new Quantity (Indicative) All inclusive, without GST (in INR) (to fulfil all requirements of the RFP)
Sr. SITC of following items Unit of Measurement Existing Quantity proposed to be co-used Proposed new Quantity (Indicative) Unit Rate for SITC for each item Total CapEx Total OPEX for 10 years from date of Go-Live (including repair / replacement of components to maintain the SLA for entire project period.
Sr. System Components SITC of following items Unit of Measurement Existing Quantity proposed to be co-used Proposed new Quantity (Indicative) All inclusive, without GST (in INR) (to fulfil all requirements of the RFP)
Sr. System Components SITC of following items Unit of Measurement Existing Quantity proposed to be co-used Proposed new Quantity (Indicative) Unit Rate for SITC for each item Total CapEx Total OPEX for 10 years from date of Go-Live (including repair / replacement of components to maintain the SLA for entire project period.
145 GPS based Vehicle Tracking 0 1
Sr. System Components SITC of following items Unit of Measurement Existing Quantity proposed to be co-used Proposed new Quantity (Indicative) All inclusive, without GST (in INR) (to fulfil all requirements of the RFP)
Sr. System Components SITC of following items Unit of Measurement Existing Quantity proposed to be co-used Proposed new Quantity (Indicative) Unit Rate for SITC for each item Total CapEx Total OPEX for 10 years from date of Go-Live (including repair / replacement of components to maintain the SLA for entire project period.
Sr. System Components SITC of following items Unit of Measurement Existing Quantity proposed to be co-used Proposed new Quantity (Indicative) All inclusive, without GST (in INR) (to fulfil all requirements of the RFP)
Sr. System Components SITC of following items Unit of Measurement Existing Quantity proposed to be co-used Proposed new Quantity (Indicative) Unit Rate for SITC for each item Total CapEx Total OPEX for 10 years from date of Go-Live (including repair / replacement of components to maintain the SLA for entire project period.
Sr. System Components SITC of following items Unit of Measurement Existing Quantity proposed to be co-used Proposed new Quantity (Indicative) All inclusive, without GST (in INR) (to fulfil all requirements of the RFP)
Sr. System Components SITC of following items Unit of Measurement Existing Quantity proposed to be co-used Proposed new Quantity (Indicative) Unit Rate for SITC for each item Total CapEx Total OPEX for 10 years from date of Go-Live (including repair / replacement of components to maintain the SLA for entire project period.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.88 MB
RFPPart1Aand1B.pdf
Tender Documents • 4.91 MB
AnnxureA.pdf
Additional Documents • 0.16 MB
Checklist.pdf
Additional Documents • 0.19 MB
RFPPart2.pdf
Additional Documents • 0.95 MB
pricebid.xls
Additional Documents • 0.13 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .