| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹223.6 CrAccepted-AOC 7TH FLOOR KALPATARU SYNERGY OPP GRAND HYATT SANTACRUZ EAST MUMBAI 400055 MAHARASHTRA INDIA | MUMBAI | MUMBAI | MAHARASHTRA | 400055 | ₹223.6 Cr | L1 | Accepted-AOC FINANCIALLY ACCEPTED |
| 2 | L2₹228.8 CrRejected-Finance PLOT NO 1080 BIRLA AURORA LEVEL 21 DR ANNIE BESANT ROAD WORLI MUMBAI MAHARASHTRA 400030 | MUMBAI | MAHARASHTRA | 400030 | ₹228.8 Cr | L2 | Rejected-Finance FINANCIALLY DISQUALIFIED |
| 3 | L3₹238.5 CrRejected-Finance 1ST FLOOR KRISHNA TOWERS OPP TO THRIKKAKARA TEMPLE THRIKKAKARA P O COCHIN 682 021 | ERNAKULAM | KERALA | 682021 | ₹238.5 Cr | L3 | Rejected-Finance FINANCIALLY DISQUALIFIED |
| Sl No | Description | Qty | Unit | Siemens Limited L2 | Sterling & Wilson Pvt.Ltd L3 | Kalpataru Projects International Ltd -KPIL L1 |
|---|---|---|---|---|---|---|
| 1.00Schedule A 33kV Cable | ||||||
| 1.10Kaloor KSEBL To Chembumukku ASS Feeder | ||||||
| 1.10Engineering, Supply, laying, termination,testing and commissioning of 33kV (1Cx240sqmm) FRLS Cu armoured Cables and Cable connections from 33 KV CB in Kaloor KSEBL to incoming CB in Chembumukku ASS | ||||||
| 1.10 | Supply of Items as per 1.101 | 20 | KM | - | - | - |
| 1.10 | Erection & Commissioning etc of Items as per 1.101 | 20 | KM | - | - | - |
| 1.20Ring Cables at Elevated | ||||||
| 1.20Engineering,Supply, laying, termination, testing and commissioning of 33 kV (1Cx240sqmm) FRLS Cu armoured Cables and connections. Ring main between ASS & TSS stations for elevated Stations | ||||||
| 1.20 | Supply of Items as per 1.201 | 75 | KM | 56,71,528.4 ₹1.1 Cr | 1,43,47,510.74 ₹2.9 Cr | 59,23,600 ₹1.2 Cr |
| 1.20 | Erection & Commissioning etc of Items as per 1.201 | 75 | KM | - | - | - |
| 1.30Aux./Rectifier Transformer Connection | ||||||
Updated dates
Tender Value
Refer Docs
EMD Value
₹1.8 Cr
Closing Date
30 Oct 2025, 3:00 pmClosed
Director Systems
Kochi Metro Rail Limited, 4th Floor, JLN Stadium Metro Station, Kaloor, Ernakulam, Kerala, India. 682017
Design verification, detail engineering, manufacture, supply, installation, testing and commissioning of 750 V DC third rail traction system electrification and Auxiliary Sub Stations (ASS) and Associated Scada Systems for Phase 2 of KMRL Project.
2025_KMRL_782298_1
KMRL/PROC/TENDER/2025-26/039
Open Tender
Miscellaneous Works
730 days
Kochi
Please refer Tender documents.
19 documents required · 19 mandatory
₹35,400
₹1.8 Cr
Yes
Kochi Metro Rail Limited
29 May 2026
6 Aug 2025
31 Oct 2025
6 Aug 2025
30 Oct 2025
18 Sept 2025
6 Aug 2025 - 18 Aug 2025
14 Aug 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.79 MB
Drawings.rar
Additional Documents • 25.79 MB
WorksRequirement.pdf
Tender Documents • 7.52 MB
ConditionsOfContract.pdf
Tender Documents • 2.21 MB
BiddingProcedure.pdf
Tender Documents • 4.43 MB
Financials.pdf
Tender Documents • 11.60 MB
BOQ_1283450.xls
BOQ • 0.50 MB
Download all tender documents and submit your bid