| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 CrAdmitted-Finance HARIDWAR | ₹2.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.2 CrAdmitted-Finance 518 4 SAINI COLONY ROORKEE | ₹2.2 Cr | L2 | Admitted-Finance |
| 3 | L3₹2.2 CrAdmitted-Finance 2 FRIENDS ENCLAVE SHAH NAGAR P O DEFENCE COLONY DEHRADUN WORKS AT RESHAM MAJRI GURUDWARA ROAD LAL TAPPAR IND AREA RISHIKESH DEHRADUN | DEHRADUN | UTTARAKHAND | 248001 | ₹2.2 Cr | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Sagar Engineering Company L1 | VIKAS ELECTRICALS AND CONSTRUCTION L2 | UTTARANCHAL FORGINGS INDUSTRY L3 |
|---|---|---|---|---|---|---|
| 1.00Material | ||||||
| 2.00 | Dead End Clamp with I hook AB Cable SP-21 | 760 | No. | 475 ₹3.6 L | 490 ₹3.7 L | 525 ₹4.0 L |
| 3.00 | MS Half Clamp for LT Distribution Box SP-21 with N&B | 1,848 | No. | 275 ₹5.1 L | 280 ₹5.2 L | 225 ₹4.2 L |
| 4.00 | Holding Clamp J-I Hook for AB Cable | 610 | No. | 300 ₹1.8 L | 320 ₹2.0 L | 275 ₹1.7 L |
| 5.00 | Nut & Bolts | 550 | Kg. | 300 ₹1.6 L | 320 ₹1.8 L | 150 ₹82,500 |
| 6.00 | Stay Clamp for SP-21 with N&B | 42 | No. | 300 ₹12,600 | 320 ₹13,440 | 275 ₹11,550 |
| 7.00 | PP and Clamp for SP-21 without N&B | 40 | No. | 400 ₹16,000 | 415 ₹16,600 | 500 ₹20,000 |
| 8.00 | Suspention Clamp with I Hook AB Cable SP-21 | 610 | No. | 550 ₹3.4 L | 575 ₹3.5 L | 525 ₹3.2 L |
| 9.00 | Mid Jointing Sleeve 25mm | 40 | No. | 350 ₹14,000 | 395 ₹15,800 | 250 ₹10,000 |
| 10.00 | 11 KV Fuse set | 40 | No. | 14,000 ₹5.6 L | 14,400 ₹5.8 L | 7,500 ₹3 L |
Tender Value
₹1.9 Cr
EMD Value
₹3.8 L
Closing Date
29 Jan 2026, 12:00 pmClosed
SE EDC Srinagar Garhwal
SE EDC Srinagar Garhwal
Replacement of old and damaged LT Aerial Bunch Cable on 11 kv Rikhnikhal feeder under EDD kotdwar on Semi-turnkey Basis
2026_UPCL4_90967_1
Tender no. 37/EDC(s)/2025-26
Open Tender
Electrical Works
180 days
Srinagar
Replacement of old and
damaged LT Aerial Bunch
Cable on 11 kv Rikhnikhal
feeder under EDD kotdwar on
Semi-turnkey Basis
3 documents required · 3 mandatory
₹11,800
EE ETD Srinagar Garhwal
₹3.8 L
27 Mar 2026
14 Jan 2026
30 Jan 2026
14 Jan 2026
29 Jan 2026
14 Jan 2026
Material
Dead End Clamp with I hook AB Cable SP-21
MS Half Clamp for LT Distribution Box SP-21 with N&B
Holding Clamp J-I Hook for AB Cable
Nut & Bolts
Stay Clamp for SP-21 with N&B
PP and Clamp for SP-21 without N&B
Suspention Clamp with I Hook AB Cable SP-21
Mid Jointing Sleeve 25mm
11 KV Fuse set
MS Half Clamp for LT Distribution Box SP-23/33 with N&B
LT bare Neutral connector PG clamp for Distribution Box 25-25 sq.mm
LT bare Neutral connector PG clamp for Distribution Box 50-50 sq.mm
Chemical Earthing
IPC 70/35 sq.mm for line to line tapping
IPC 70 sq.mm to 25 sq.mm for Distribution Box
Head Shrink type end caps for LT AB Cable
1 Phase LT Distribution Box, inbuilt panel lock
3 Phase LT Distribution Box, inbuilt panel lock
LT XLPE Cable 1x16 sq.mm insulated for Distribution Box
LT XLPE Cable 1x50 sq.mm
LT XLPE AB Cable 3X35 +1X25 Sq.mm.
LT XLPE AB Cable 1X35 +1X25 Sq.mm.
MCCB for 100 KVA T/F 200A 35 K with Box
Crimping Type Al. lug (25-100) sq.mm
Aluminium lug 25 sq.mm
Labour
Chemical Earthing
Erection of LT stay set
Erection of Single SP-10 Pole
Erection of Single SP-21Pole
Cartage of following material from store center Kotdwar to road site different road site with loading unloading and proper stocking at both end. Dist. 151-200 Km. Aprox.
ST Pole SP- 10
ST Pole SP-21/23
Misc line Material.
Head Load cartage of following material from road site to work site. Dist.- 1-3 Km. Aprox.
ST Pole SP-10
ST Pole SP-21/23
Disconnection & Reconnectio of Service Cable
Laying of LT Ab Cable 3X35+1X25 Sq.mm.
Installation of LT DB 1 PH &3 Ph for LT AB Cable
Straightning of Tilted existing LT Pole
Laying and Fixing of LT XLPE cable
Installation of MCCB with Box at DTRs
Dismantling of LT XLPE/PVC Cable
Laying and Fixing of 1x35 sq.mm XLPE Cable
Back Head Load Cartage of Petty Material 1-3 Km
Head Load cartage of LT AB Cable 3x35+1x25 sq.mm
Head Load cartage of LT AB Cable 1x35+1x25 sq.mm
Installation of 50 sq.mm LT Al. Lugs
Dismantling of LT XLPE Cable ICx16+25
Supply and Fixing 1 Phase LT Distribution Box
Fixing of D-class heavy duty GI Clamp
Fixing of 11 KV Fuse set
Lopping and Chopping of Tree branches
Retighting of Top plate N&B etc
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.50 MB
Tendernotice_2.pdf
PDF • 1.14 MB
PQR37.pdf
Other Document • 0.49 MB
Tednderdocuments37.pdf
Tender Documents • 1.12 MB
BOQ_107777.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid