| 1 | L1₹2.1 CrAccepted-AOC PUTHIRAKANDATHIL HOUSE VENDUVAZHY KOTHAMANGALAM P O ERNAKULAM PIN 682017 | KOTHAMANGALAM | ERNAKULAM | KERALA | 682017 | ₹2.1 Cr | L1 | Accepted-AOC L1 |
| 2 | Rejected-Technical | - | - | Rejected-Technical L3 |
| 3 | Rejected-Technical | - | - | Rejected-Technical L2 |
| Sl No | Description | Qty | Unit | D & C BUILDERS & DEVELOPERS L1 | K P ANTONY L2 | DELMANN CONSTRUCTIONS L3 |
|---|---|---|---|---|---|---|
| 1.00CIVIL WORKS | ||||||
| 1.00 | OD272171/2025-2026:Boring, providing and installation bored cast-in-situ reinforced cement concrete piles of grade M-25 of specified diameter and length below the pile cap, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and temporary casing of appropriate length for setting out and removal of same and the length of the pile to be embedded in the pile cap etc. by percussion drilling using Direct mud circulation (DMC) or Bailer and chisel technique by tripod and mechanical Winch Machine all complete, including removal of excavated earth with all its lifts and leads (length of pile for payment shall be measured up to bottom of pile cap).800 mm dia piles | 1,271 | metre | 6,300 ₹80,07,300 Lowest | 6,470 ₹82,23,370 | 6,950 ₹88,33,450 |
| 1.00 | 60.2.2:Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete | 50 | hour | 400 ₹20,000 | 425 ₹21,250 | 320 ₹16,000 Lowest |
| 1.00 | 2.18.1:Close timbering over areas including strutting, shoring and packing cavities (wherever required) etc. complete ( Measurements to be taken of the face area timbered):Depth not exceeding 1.5 m | 163.68 | sqm | 129 ₹21,114.72 Lowest | 139 ₹22,751.52 | 135 ₹22,096.8 |
| 1.00 | 20.6.2.1:Vertical load testing of piles in accordance with IS 2911 (Part IV) including installation of loading platform by Kentledge/Anchor piles method and preparation of pile head or construction of test cap and dismantling of test cap after test etc. complete as per specification & the direction of Engineer in-charge.
Single pile above 50 tonne and upto 100 tonne capacityInitial test (Test Load 2.5 times the Safe capacity) | 1 | per test | 30,000 ₹30,000 Lowest | 70,000 ₹70,000 | 4,32,250 ₹4,32,250 |
| 1.00 | 20.6.2.2:Vertical load testing of piles in accordance with IS 2911 (Part IV) including installation of loading platform by Kentledge/Anchor piles method and preparation of pile head or construction of test cap and dismantling of test cap after test etc. complete as per specification & the direction of Engineer in-charge.
Single pile above 50 tonne and upto 100 tonne capacityRoutine test (Test Load 1.5 times the Safe capacity) | 1 | per test | 20,000 ₹20,000 Lowest | 36,500 ₹36,500 | 2,59,000 ₹2,59,000 |
| 1.01 | 20.9:Integrity testing of pile using Low Strain / Sonic Integrity Test/ Sonic Echo Test method in accordance with IS 14893 including surface preparation of pile top by removing soil, mud, dust & chipping lean concrete lumps etc. and use of computerised equipment and high skill trained personal for conducting the test & submission of results, all complete as per direction of Engineer-in-charge. Note:- The inclusion of the above item in the schedule of work shall be judiciously decided by the technical sanctioning authority, keeping in view the quality control, type of soil strata & importance of the project. | 31 | per test | 500 ₹15,500 Lowest | 1,150 ₹35,650 | 1,750 ₹54,250 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 63,429.1 | kilogram | 97.44 ₹61,80,531.5 Lowest | 104 ₹65,96,626.4 | 102 ₹64,69,768.2 |
| 1.01 | OD272177/2025-2026:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is not payable or recoverable separately. All work upto plinth level | 41.26 | cum | 9,250 ₹3,81,664.25 Lowest | 9,942 ₹4,10,216.86 | 9,590 ₹3,95,692.99 |
| 1.01 | 2.1.1:Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed:All Kinds of soil | 51.74 | sqm | 116 ₹6,001.61 Lowest | 125 ₹6,467.25 | 145 ₹7,502.01 |
Tender Value
₹2.4 Cr
EMD Value
₹1 L
Closing Date
13 Feb 2026, 5:00 pmClosed
Chairman and Managing Director KPHCC
Chairman and Managing Director KPHCC
MOPF 2024-25 (Central share)- Construction of New Building for Kannamali Police Station, Kochi City Ernakulam (DSR 2021)
2026_KPHCC_832097_1
NIT No.126/KPHCC/2025-26
Open Tender
Civil Works - Buildings
Item Rate
540 days
Ernakulam
Please refer Tender documents.
7 documents required · 7 mandatory
₹8,850
₹1 L
9 Mar 2026
30 Jan 2026
16 Feb 2026
30 Jan 2026
13 Feb 2026
30 Jan 2026
CIVIL WORKS
OD272171/2025-2026:Boring, providing and installation bored cast-in-situ reinforced cement concrete piles of grade M-25 of specified diameter and length below the pile cap, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and temporary casing of appropriate length for setting out and removal of same and the length of the pile to be embedded in the pile cap etc. by percussion drilling using Direct mud circulation (DMC) or Bailer and chisel technique by tripod and mechanical Winch Machine all complete, including removal of excavated earth with all its lifts and leads (length of pile for payment shall be measured up to bottom of pile cap).800 mm dia piles
60.2.2:Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
2.18.1:Close timbering over areas including strutting, shoring and packing cavities (wherever required) etc. complete ( Measurements to be taken of the face area timbered):Depth not exceeding 1.5 m
20.6.2.1:Vertical load testing of piles in accordance with IS 2911 (Part IV) including installation of loading platform by Kentledge/Anchor piles method and preparation of pile head or construction of test cap and dismantling of test cap after test etc. complete as per specification & the direction of Engineer in-charge. Single pile above 50 tonne and upto 100 tonne capacityInitial test (Test Load 2.5 times the Safe capacity)
20.6.2.2:Vertical load testing of piles in accordance with IS 2911 (Part IV) including installation of loading platform by Kentledge/Anchor piles method and preparation of pile head or construction of test cap and dismantling of test cap after test etc. complete as per specification & the direction of Engineer in-charge. Single pile above 50 tonne and upto 100 tonne capacityRoutine test (Test Load 1.5 times the Safe capacity)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
OD272177/2025-2026:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is not payable or recoverable separately. All work upto plinth level
2.1.1:Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed:All Kinds of soil
50.2.25.1:Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge
2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
OD266451/2025-2026:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 150 landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with M25 Grade concrete as per IS standards
5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.9.7:Centering and shuttering including strutting, etc. and removal of form for:Stairs, (excluding landings ) except spiral - staircases)
OD268160/2025-2026:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is not payable or recoverable separately. All work above plinth level upto floor V level
5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts
5.22A.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more
WATERSUPPLY AND SANITATION
50.18.9.10.1:Providing and fixing PVC pipes includings jointing of pipes with one step pvc solvent cement, trenching , refilling & testing of joints complete as per direction of Engineer in Charge. 150 mm dia 6 Kgf/cm2
50.18.9.19.1:Providing and fixing PVC pipes including fixing the pipe with clamps/ clips/ at 1.00 m spacing . This includes jointing of pipes with one step PVC solvent cement and testing of joints complete as per direction of Engineer-in-Charge 110 mm dia 6 Kgf/cm2 - External work- Exposed on wall
ELECTRICAL WORKS
1.21.1:Supplying and fixing of following sizes of medium class PVC conduit along with accessories in surface/ recess including cutting the wall and making good the same in case of recessed conduit as required.20 mm
1.21.2:Supplying and fixing of following sizes of medium class PVC conduit along with accessories in surface/ recess including cutting the wall and making good the same in case of recessed conduit as required.25 mm
1.21.3:Supplying and fixing of following sizes of medium class PVC conduit along with accessories in surface/ recess including cutting the wall and making good the same in case of recessed conduit as required.32 mm
90.4.1:Supply and installation of suitable size MS rod type fan clamp in the RCC slab as per IS 732 as required.
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1398526.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.10 MB
Tendernotice_2.pdf
PDF • 0.34 MB
tenderdocument2023.pdf
Tender Documents • 2.25 MB
BOQ_1398526.xls
BOQ • 0.25 MB
kannamaliAllDrawing.pdf
Other Document • 4.45 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .