Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.5 LAccepted-Finance ANDHRA POWER HOUSE DIVISION HPSEBL CHIRGAON 171208 | SHIMLA | HIMACHAL PRADESH | 171208 | ₹15.5 L | L1 | Accepted-Finance L1 |
| 2 | L2₹16.0 L+₹48,752.31 (3.14%)Rejected-Finance GOVT CONTRACTOR VILLAGE CHERI P O KIAR KOTI TEHSIL DISTT SHIMLA | ₹16.0 L+₹48,752.31 (3.14%) | L2 | Rejected-Finance L2 |
| 3 | L3₹16.6 L+₹1.1 L (7.13%)Rejected-Finance | ₹16.6 L+₹1.1 L (7.13%) | L3 | Rejected-Finance L3 |
| 4 | L4₹16.9 L+₹1.4 L (9.04%)Rejected-Finance N A | FARIDABAD | HARYANA | 121004 | ₹16.9 L+₹1.4 L (9.04%) | L4 | Rejected-Finance L4 |
| 5 | L5₹16.9 L+₹1.4 L (9.19%)Rejected-Finance | ₹16.9 L+₹1.4 L (9.19%) | L5 | Rejected-Finance L5 |
Tender Value
Refer Docs
EMD Value
₹40,000
Closing Date
5 Aug 2026, 11:00 amClosed
EE HPPWD SARAHAN
EE HPPWD SARAHAN
R/R damages on Machher Jabiyanan Wasni road Km 0/0 to 8/435 (SH C/O 4.0 mtr Span RCC Slab culvert alongwith wing wall at RD 0/800)
2026_PWD_140114_3
4290-4340 dated 17.07.2026
Open Tender
Civil Works - Roads
Percentage
90 days
SARAHAN
Please refer Tender documents.
10 documents required · 10 mandatory
₹500
₹40,000
17 Aug 2026
28 Jul 2026
5 Aug 2026
28 Jul 2026
5 Aug 2026
28 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavations for structure as per drawing and technical specifications clause 305.1 (Clause ThreeHundred Five point One) including setting out, construction of shoring and bracing removal of stumps and other deleterious material and disposal upto a lead of 50m, dressing of sides and bottom and backfilling in trenches with excavated suitable material in all leads and lifts to the entire satisfaction as per direction of Engineer-in- Charge. | 192.12 | Per Cubic Metre. | 261 | ₹50,143.32 |
| 2 | Providing and laying Plain Cement Concrete 1:3:6(one cement: three sand: six graded hard stone aggregate 20mm(twenty) millimeter)nominal size} and curing complete including the cost of formwork for plain/reinforcemed concrete as per drawing and HP PWD techinical specifications i/c carriage of all labour equipments and materials to various locations through all modes of transportations in all leads and lifts to the entire satisfaction as per direction of Engineer-in- Charge. | 9.95 | Per Cubic Metre. | 6,029 | ₹59,988.55 |
| 3 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1204 cement motor 1:2:4 (1cement : 2 sand :4 coarse Aggeregate)including the cost of form work and carriage of all labour equipments and materials to various locations through all modes of transportations in all leads and lifts to the entire satisfaction as per direction of Engineer-in-Charge. | 135.48 | Per Cubic Metre. | 6,055 | ₹8,20,331.4 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering -All work up to plinth level:cement motor 1:1.5:3 (1cement : 1.5sand :3 coarse Aggeregate) including the cost of form work and carriage of all labour equipments and materials to various locations through all modes of transportations in all leads and lifts to the entire satisfaction as per direction of Engineer-in-Charge. | 16.81 | Per cubic meter | 8,775.8 | ₹1,47,521.2 |
| 5 | Supplying fitting and placing HYSD bar reinforcement in super structure complete as per drawing and technical specification Clauses 1010 & 1202 including the cost of form work and carriage of all labour equipments and materials to various locations through all modes of transportations in all leads and lifts to the entire satisfaction as per direction of Engineer-in-Charge. | 1.8 | MT | 91,770.6 | ₹1,65,187.08 |
| 6 | Providing and laying concrete for plain/reinforced concrete in open foundations complete as par drawings and technical specifications C- 802, 803, 1202 & 1203(Clause - Eight hundred Two, Eight hundred Three, One thousand Two hundred Two and One thousand Two hundred Three) 1:4:8. (One Cement : Four Sand : Eight graded stone) aggregate 25 mm nominal size and curing complete including the cost of form work and carriage of all labour equipments and materials to various locations through all modes of transportations in all leads and lifts to the entire satisfaction as per direction of Engineer-in-Charge. | 119.12 | Per Cubic Metre. | 5,166.45 | ₹6,15,427.52 |
| 7 | Providing weepholes in brick masonry / stone masonry /plain reinforced concrete abutment, wing wall, return wall with 100 mm (One Hundred ) dia AC pipe extending through the full with of the structures with slop of 1(v):20(H) towards drawing face complete as per drawing and technical specification clauses 614, 709, 1204.3.7 (Clause - Six hundred Fourteen, Seven hundred Nine, One thousand Two hundred Four point Three point Seven) ),including hauling /carriage of all labour equipments and materials to various locations through all modes of transportations in all leads and lifts to the entire satisfaction as per direction of Engineer-in- Charge | 48 | No,s | 280 | ₹13,440 |
| 8 | Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 in granular material and as per direction of the Engineer-in Charge, including carriage of all labour equipments and materials to various locations through all modes of transportation in all leads and lifts to the entire satisfaction of the Engineer-in-Charge. | 61.16 | Per Cubic Metre. | 789.6 | ₹48,291.94 |
| 9 | Providing laying rubble stone flooring in cement mortar 1:6 laid over cement concrete bedding complete as per drawing and technical specification clause 1303. including the cost of form work and carriage of all labour equipments and materials to various locations through all modes of transportations in all leads and lifts to the entire satisfaction as per direction of Engineer-in-Charge. | 5.4 | Per Cubic Metre. | 4,800 | ₹25,920 |
| 10 | Providing fitting and fixing mild steel ralling complete as per drawing and technical specification clause 1208.2 including the cost of form work and carriage of all labour equipments and materials to various locations through all modes of transportations in all leads and lifts to the entire satisfaction as per direction of Engineer-in-Charge. | 12 | Per Rmt | 5,692.3 | ₹68,307.6 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.63 MB
SBD.pdf
Tender Documents • 3.14 MB
BOQ_207737.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .