Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.3 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹9.8 L+₹53,108.33 (5.71%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | |
| 3 | L3₹9.9 L+₹62,890 (6.76%)Admitted-Fee/PreQual/Technical/Finance NADACKAL PADINJATTETHIL EDAVATTOM VELLIMON P O KERALAPURAM KOLLAM | KOLLAM | KOLLAM | KERALA | L3 | Admitted-Fee/PreQual/Technical/Finance | |
| 4 | L4₹10.0 L+₹72,890 (7.83%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | |
| 5 | L5₹10.5 L+₹1.2 L (12.7%)Admitted-Fee/PreQual/Technical/Finance KALLUMKARATHAZHATHIL PUNAKANOOR PERUMPUZHA PO | PERUMPUZHA | KOLLAM | KERALA | L5 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | KOMARIO ENTERPRISES INDIA PRIVATE LIMITED L9 | PRASANNAKUMAR.R L7 | LIJEESH V L3 | Amal raj L5 | RAJENDRAN PILLAI L6 | VISWANADHAN D L8 | Jipin John Abraham L1 | Panayil Contractors L4 | BSR HI-SIGHT INFRASTRUCTURE PVT LTD L2 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Detailed Estimate | ||||||||||||
| 1.00 | 100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. | 990 | cum | 350 ₹3,46,500 Lowest | 450 ₹4,45,500 | 460 ₹4,55,400 | 500 ₹4,95,000 | 515.42 ₹5,10,265.8 | 535.77 ₹5,30,412.3 | 370 ₹3,66,300 | 400 ₹3,96,000 | 467.21 ₹4,62,537.9 |
| 1.00 | 100.8.1:Fencing one side of trenches, 1.50m height with two rows of 10cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2m intervals. | 500 | metre | 5 ₹2,500 Lowest | 25 ₹12,500 | 20 ₹10,000 | 23 ₹11,500 | 24.49 ₹12,245 | 30.61 ₹15,305 | 15 ₹7,500 | 20 ₹10,000 | 22.2 ₹11,100 |
| 1.00 | OD115427/2023-2024:Labour engaged for Bailing out water | 10 | no | 500 ₹5,000 Lowest | 750 ₹7,500 | 700 ₹7,000 | 798 ₹7,980 | 822.45 ₹8,224.5 | 1,028.07 ₹10,280.7 | 500 ₹5,000 Lowest | 500 ₹5,000 Lowest | 745.51 ₹7,455.1 |
| 1.00 | 15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 1.8 | cum | 2,000 ₹3,600 | 2,200 ₹3,960 | 1,900 ₹3,420 | 1,856 ₹3,340.8 | 1,912.86 ₹3,443.15 | 2,391.08 ₹4,303.94 | 1,000 ₹1,800 Lowest | 2,000 ₹3,600 | 1,733.91 ₹3,121.04 |
| 1.00 | 100.9.8:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 90 mm nominal outside diameter pipes. | 600 | metre | 50 ₹30,000 Lowest | 75 ₹45,000 | 70 ₹42,000 | 76 ₹45,600 | 79.27 ₹47,562 | 82.4 ₹49,440 | 81 ₹48,600 | 50 ₹30,000 Lowest | 71.86 ₹43,116 |
| 1.01 | 100.9.10:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 140 mm nominal outside diameter pipes. | 600 | metre | 80 ₹48,000 Lowest | 90 ₹54,000 | 140 ₹84,000 | 148 ₹88,800 | 153.25 ₹91,950 | 159.3 ₹95,580 | 82 ₹49,200 | 100 ₹60,000 | 138.92 ₹83,352 |
| 1.01 | 100.59.2:Refilling the trenches with a wet mix of close graded granular materials (Stone aggregate - 25mm nominal size - 17.5%, Stone aggregate - 10mm nominal size - 17.5%, Crushed Stone - 2.36mm to 12.5mm - 25%, Stone chippings / screenings - 4.75mm nominal size - 20%, Stone chippings / screenings - 150 micron nominal size - 20%), mixing properly after adding sufficient quantity of water, refilling in layers not exceeding 150mm, compacting properly at Optimum Moisture Content with Surface Plate Vibrator and disposing the excavated material etc. complete, including traffic control, providing caution boards and as per direction of Engineer-in-charge for road restoration works in pipeline leak sites. | 5.55 | cum | 5,500 ₹30,525 | 7,000 ₹38,850 | 6,150 ₹34,132.5 | 6,100 ₹33,855 | 6,683.05 ₹37,090.93 | 8,353.81 ₹46,363.65 | 3,000 ₹16,650 Lowest | 6,000 ₹33,300 | 6,057.84 ₹33,621.01 |
| 1.01 | 100.59.1:Cutting the bituminous / concrete roads with cutting machine for a minimum depth of 200mm along the sides of proposed alignment of the pipe to be laid without causing any damage to other utilities, including the charges for hire and conveyance of tools and plant, cost of consumables and charges for lighting, watching, ribbon fencing, caution boards, traffic diversion, and as per the direction of departmental officers etc. complete, before carrying out the demolition of bituminous / concrete road by mechanical means and carrying out the excavation. | 1.25 | metre | 20 ₹25 | 27.11 ₹33.89 | 10 ₹12.5 Lowest | 19 ₹23.75 | 20.63 ₹25.79 | 27.11 ₹33.89 | 20 ₹25 | 20 ₹25 | 18.68 ₹23.35 |
| 1.01 | 100.7.1:Bailing out water with 5HP engine and pump set including conveyance to the site, erecting, dismantling and taking back of engine and pump, cost of fuel lubricating oil and other stores pay of staff etc., complete. | 50 | Kwh | 15 ₹750 Lowest | 35 ₹1,750 | 20 ₹1,000 | 28 ₹1,400 | 29.9 ₹1,495 | 37.38 ₹1,869 | 20 ₹1,000 | 25 ₹1,250 | 27.11 ₹1,355.5 |
Tender Value
₹14.3 L
EMD Value
₹35,703
Closing Date
28 Sept 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Executive Engineer PH Division,Kollam
DEPOSIT of RBDCK-Construction of Puthiyacavu Chakkuvalli ROB in Kollam District - Utility shifting - RWSS to Thazhava Thodiyoor Re laying newly layid for existing distribution line by 90mm and 140mm PVC 6kg/cm2 pipe-Chittumoola
2026_KWA_871085_1
41/etndr 01// TR/18068/2023
Open Tender
Civil Works - Water Works
Item Rate
30 days
Chittumoola railway cross
Please refer Tender documents.
6 documents required · 6 mandatory
₹2,760
₹35,703
1 Oct 2026
18 Sept 2026
29 Sept 2026
18 Sept 2026
28 Sept 2026
18 Sept 2026
120 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Detailed Estimate | |||||
| 1.001 | 100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. | 990 | cum | - | - |
| 1.002 | 100.8.1:Fencing one side of trenches, 1.50m height with two rows of 10cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2m intervals. | 500 | metre | - | - |
| 1.003 | OD115427/2023-2024:Labour engaged for Bailing out water | 10 | no | - | - |
| 1.004 | 15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 1.8 | cum | - | - |
| 1.005 | 100.9.8:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 90 mm nominal outside diameter pipes. | 600 | metre | - | - |
| 1.006 | 100.9.10:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 140 mm nominal outside diameter pipes. | 600 | metre | - | - |
| 1.007 | 100.59.2:Refilling the trenches with a wet mix of close graded granular materials (Stone aggregate - 25mm nominal size - 17.5%, Stone aggregate - 10mm nominal size - 17.5%, Crushed Stone - 2.36mm to 12.5mm - 25%, Stone chippings / screenings - 4.75mm nominal size - 20%, Stone chippings / screenings - 150 micron nominal size - 20%), mixing properly after adding sufficient quantity of water, refilling in layers not exceeding 150mm, compacting properly at Optimum Moisture Content with Surface Plate Vibrator and disposing the excavated material etc. complete, including traffic control, providing caution boards and as per direction of Engineer-in-charge for road restoration works in pipeline leak sites. | 5.55 | cum | - | - |
| 1.008 | 100.59.1:Cutting the bituminous / concrete roads with cutting machine for a minimum depth of 200mm along the sides of proposed alignment of the pipe to be laid without causing any damage to other utilities, including the charges for hire and conveyance of tools and plant, cost of consumables and charges for lighting, watching, ribbon fencing, caution boards, traffic diversion, and as per the direction of departmental officers etc. complete, before carrying out the demolition of bituminous / concrete road by mechanical means and carrying out the excavation. | 1.25 | metre | - | - |
| 1.009 | 100.7.1:Bailing out water with 5HP engine and pump set including conveyance to the site, erecting, dismantling and taking back of engine and pump, cost of fuel lubricating oil and other stores pay of staff etc., complete. | 50 | Kwh | - | - |
stage.html
html • 0.03 MB
finance_1476284.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
KWAGeneralConditionsforeTenderingV5.pdf
PDF • 0.69 MB
Tendernotice_1.pdf
PDF • 0.05 MB
nit41.pdf
Tender Documents • 0.49 MB
GENERALSPECIALCONDITION1.pdf
Other Document • 0.03 MB
BOQ_1476284.xls
BOQ • 0.31 MB
SpecialConditions.pdf
Additional Documents • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .