5 Jun 2026, 6:00 pmClosed
ExecutiveEngineer,P.H.WorksDivision,Chhotaudepur,Dist:Chhotaudepur
Comprehensive Operation & Maintenance of Civil & Electromechanical assets such as offtake structures, elevated service reservoirs (E.S.R), HGLR, sump, water treatment plant, chemical house, staff quarters, pump house, gravity Main pipelines and distribution pipelines, valves, pumping machinery & electrical equipment etc for the Aug to Sankheda part-1 Regional Water Supply Scheme including supply of 9.79 MLD to 10.32 MLD potable water to all the 43 villages/ 21 Hamlates/04 Narmada Vasahat /38 Faliyas for 60 months period. Tal.- Sankheda/Bodeli Dist.- Chhotaudepur based on Sankheda Branch Narmada Canal. (Excluding supply of PAC, bleaching powder and chlorine gas.)
301583
01 of 2026-27
Open
Civil Works - Water Works
Works
Chhota Udaipur
2 documents required · 2 mandatory
₹12,000
Executive Engineer, P.H. Works Division, Chhotaudepur
₹9.5 L
6 May 2026
6 May 2026
6 May 2026
5 Jun 2026
6 May 2026
NAME OF WORK : Operation and Maintenance of all components of Aug to Sankheda part-1 Regional Water Supply Scheme
as per this tender document and name of work stated above for 60 months. Supply safe and potable water
on a daily basis (9.79 MLD to 10.32 MLD) to 43 villages/ 21 Hamlates/04 Narmada Vasahat & also including
38 Faliya of 43 Villages (with) of Faliya Connectivity including manpower, consumables, reporting,
maintenance, repairs etc. excluding electric power, raw water for the scheme of Tal.- Sankheda/Bodeli
Dist.- Chhotaudepur as per tender specifications. (Excluding supply of PAC, bleaching powder and
Estimated Cost : Rs.
Duration of O & M : 60 months
Schedule showing the approximately the materials to be supplied to the contractor from Government
stores for the work to be executed and the rate at which they are to be charged ::
Rate at which the
Sr. materials bill be Place of charge
Particulars. Qty. charged to the
1 Pipes (PVC/CI/MS/DI/HDPE/GI) ~Free of Cost~
As per At specified headworks/Sub
2 Chlorine Gas Cylinder 900/100 kg (Empty) ~Free of Cost~
requirement head works where required
As per material to be brought from
3 Bleaching powder ~Free of Cost~
requirement the available at
As per departmental store any
4 PAC Solution ~Free of Cost~
requirement Where in Gujarat.
All required size Sluice Valves, Air Valves, As per
5 ~Free of Cost~
Scour Valves requirement
1.The person or the firm submitting the tender should see that the rates of above schedule are filled up by the executive Engineer
or in charge of the work before issuing the tender.
2.The contractor should have to make his own arrangement for loading, unloading & carting of material issued from department
from store to site of work.
3.Material other than that as shown in schedule A, required for O & M work will be procured by contractor at his own cost, it
will be issued to the contractor if it is available with department subject to approval from competent authority and rate will be
charged at issue rate or market rate whichever is higher. Contractor has to deposit full amount for materials to be issued other
than as shown in Schedule "A".
4.Recovery will be made at the double rate of Purchase rate in case of use of material by contractor other then the departmental O
5.As per availability of material & as per instructions from competent authority contractor should have to make his own
arrangement for loading, unloading & carting the materials from store of Sankheda Part-1 Regional Water Supply Scheme
other than as above.
6.Work should not be sub. let to other contractor if it will come to notice of department, contract will be terminated.
7.If any material stolen or misplaced the same will be reissued by the department but the same shall be fixed by contractor at his
own cost and recovery for reissued material will be made from the bill of contractor at Board R.C. / S.O.R. rate whichever is
higher. Contractor has to do the police procedure for stolen material at his own cost.
(A) old materials required after repairing or replacement shell be return to the department by to agency
8.Contractor has to use the material of standard quality in O & M work after approval from in-charge officer
9.All material including tools & plants & man power required for O & M work excluding chlorine gas, Bleaching Powder and
Alum shall be procured by contractor at his own cost.
10.All illegal connection should be removed by the Contractor at own cost.
11.The contractor shall have to make his own arrangement for Refilling of chlorine gas Tonner/bottle for Prechlorination
(Excluding cost of chlorine gas), loading, unloading and carting from the source of supply to Tandalja Main H.W and Bodeli
Rurban HW. site. Empty toners if available with GWSSB shall be supplied at free of cost.
12.The materials issued free of cost as above shall be utilized in work as per requirement. Balance materials on completion of
work shall have to be returned in safe and sound condition at the departmental store specified in the Schedule- "A".
13.In case of any shortage or damaged to the material issued to the contractor the cost of the same shall have to be recovered from
contractor two times the issue rate. Issue rate will be calculated basd on latest prevailing Rate of SOR.
15.Materials not included in Schedule-"A", but required in the work shall be provided by the bidder and cost of such materials
shall not be paid extra.
16.The amount recoverable from the contractor by the GWSSB on any account shall be liable to be recovered from the amount
payable to the bidders under this clause.
17.The required CI / MS/DI Specials, PVC Specials such of tee, Saddle, Bend, Reducer, Coupler and Cement solvent for PVC
pipeline shall be brought by the contractor for which no extra payment will be made.
18.The Materials issued for the above work shall be used in the above O & M work only. If any of Materials issued for this work
and found used in other works shall be charged at the double rates.
19.The Materials to be brought/ purchase by the contractor shall be got approved from the EIC before using in the work.
20.Operation of all existing and additional Chlorine Plants installed and flow meter installed shall be carried out by the agency.
Dated Signature Dy. Executive Engineer Executive Engineer
of contractor Public Health Sanitary Sub Division Public Health Works Division
Bodeli Chhotaudepur
Aug to Snakheda Part-1 Regional Water Supply Scheme
Taluka: Sankheda/Bodeli District:Chhotaudepur
Breakup of Schedule B (Civil+ Mech)
Sr. No. Qty. Unit Item Rate (in Rs.) Per Total Amount in Rs.
Sr. No. Qty. Unit Item Rate (in Rs.) Per Total Amount in Rs.
Part A: Operation & Maintenance
Part-A: Operation and Maintenance of all
components of Aug to Sankheda part-1 Regional
Water Supply Scheme as per this tender document
and name of work stated above for 60 months.
Supply safe and potable water on a daily basis (9.79
MLD to 10.32 MLD) to 43 villages/ 21 Hamlates/04
Narmada Vasahat & also including 38 Faliya of
Villages (with) of Faliya Connectivity including
manpower, consumables, reporting, maintenance,
repairs etc. excluding electric power, raw waterfor
the scheme of Tal.- Sankheda/Bodeli Dist.-
Chhotaudepur as per tender specifications.
i 12 Months First Year (Civil+Mech) 11,87,899.15 Per Month
ii 12 Months Second Year (Civil+Mech) 12,99,699.77 Per Month
iii 12 Months Third Year (Civil+Mech) 14,24,230.24 Per Month
iv 12 Months Fourth Year (Civil+Mech) 15,09,684.06 Per Month
v 12 Months Fifth Year (Civil+Mech) 16,00,265.10 Per Month
Part B: Maintenance activities, measured and paid separately, such as painting, cleaning of reservoirs/ tanks, procurement and
replacement of filter media etc complete as per this tender document
B1 (i) ITEM NO.1-
Finsihing Wall With Weather Proof Exterior emulsion
paint on wall surface (TWO COATS) to given an
a 29688.54 Smt required shape even shade after thoroughly brushing 122.14 Smt
the surface to remove all dirt, and remains of loose
powdered materials etc. completed
B1 (ii) ITEM NO.2-
Distempeing (TWO COATS) With Oil Bound
Distemper of approved brand and manufacture and
of required shade on wall surfaces to give an even
shade, over and including a priming coat with
b 12223.73 Smt distemper primer of approved brand and 77.30 Smt
manufacture after throughly brushing the surface
free from mortor dropping and other foreign matter
and also including preparing the surface even and
sand papered smooth.
B1 (iii) ITEM NO.3
Painting Two Coat (Excluding Priming Coat) On
Previously Printed Steel And Other Metal Surface
With Synthetic Enamel Print Brushing To Give An
Even Shade Including Cleaning The Surface Of All
Dirt Dust And Other Foreign Matter ..Extra Over Item
for Every Subsequennt Coat Of Paint
B1 (iv) ITEM NO.4
Painting letter
Painting letter for "Capacity of tank" the size of letters
will be 45 Cm height and 50mm width
d 3000.00 Nos Painting letters 45Cm Ht. 35.70 Nos
e 3000.00 Nos Painting letters 23Cm Ht. 23.10 Nos
Sub Total- Part B1 (i, ii, iii & iv)
B2(i) ITEM NO.1-
Labour Charges for Cleaning of Sump /GL Cistern
including cleaning and removing algae, calcination,
sludge, dirt deposition from bottom and s well as
from wall of container, disinfection by bleaching
a 10.00 Nos 8498.07 Nos
powder with all necessary tools and plants, labours
and cost of disinfectant etc. completed. (Every Six
Month Cleaning Period) 864000 Liter @ Canal
b 10.00 Nos 3700000 Liter @ Tandalja MHW 33554.22 Nos
c 10.00 Nos 1250000 Liter @ Rajnagar SHW 11949.00 Nos
d 10.00 Nos 160000 Liter @ Ganeshwad SHW 2509.50 Nos
e 10.00 Nos 120000 Liter @ Nava dhanpur SHW 2389.80 Nos
B2(ii) ITEM NO.2-
Labour Charges for Cleaning of RCC ESR including
cleaning and removing algae, calcination, sludge,
dirt deposition from bottom and s well as from wall of
container, disinfection by bleaching powder with all
a 10.00 Nos 9261.00 Nos
necessary tools and plants, labours and cost of
disinfectant etc. completed.(Every Six Month
Cleaning Period) 1250000 Liter X 21 Mt @ Tandalja
b 10.00 Nos 450000 Liter X 25 Mt @ Rajnagar SHW 4660.95 Nos
c 10.00 Nos 350000 Liter X 22 Mt @ Rajnagar SHW 3704.40 Nos
d 10.00 Nos 80000 Liter X 15 Mt @ Ganeshvad SHW 2628.15 Nos
e 10.00 Nos 150000 Liter X 8 Mt @ Nava Dhanpur SHW 2748.90 Nos
Sub Total- Part B2(i) & B2(ii)
Procurement & replacement of filter media:
B3(i) ITEM NO.1-
Filter Media-Sand for Rapid Sand Filter Bed:
Providing & Supplying the filter sand of specified
effective size (0.45 to 0.70mm) and uniformly
a 840.84 Cum coefficient (not more than 1.7, nor less than 1.3) and 1340.85 Cum
laying over gravel support confirming to IS:8497 (i) -
77 in filter bed of required depth as per design as
per design and drawing. Inclusive of all lead
B3(ii) ITEM NO.2-
Filter Gravel: Providing & Supplying Gravels of
b 711.48 Cum different size as per design and drawing and laying 1340.85 Cum
inlayers I filter beds inclusive of all lead.
Sub Total- Part B3(i) & B3(ii)
Total- Part B (B1+B2+B3)
Part C: Repair & Upgradation of non functional Asset
Excavation for pipeline trenches for water supply,
sewerage line, manhole etc. all with shoring and
struting if required as per required gradient and line
including safety provisions using site rails and
1.1 7344.00 Cmt stacking excavated stuff including up to all required 93.45 Cmt
lead cleaning the site etc. complete for all lifts and
strata as specified.
(A) FROM DEPTH 0.00 TO 1.50 MTR.
(a) In all sorts of soil & soft murrum
1.2 2790.00 Cmt b) In hard murrum,boulders including macadam road 141.75 Cmt
Lowering, laying, fixing & jointing PVC/uPVC/cPVC
pipes & specials of following class & dia incl. cost of
conevyance from stores to site of work including cost
of labour, material, cement solvent giving satisfactory
hydraulic testing as per I.S.I. code.
2.2 2200.00 Rmt 110 mm PVC 19.95 Rmt
2.3 600.00 Rmt 180 mm PVC 35.70 Rmt
2.4 3800.00 Rmt 200 mm PVC 38.85 Rmt
2.5 130.00 Rmt 80 mm GI 28.35 Rmt
Providing C.C.M.:100 for encasing pipes using trap
metal size 12 mm to 50 mm incl. form work curing
consolidation etc. complete for various location on
pipeline, using trap metal 20 mm nominal size.
Refilling the pipe line trenches including ramming
watering consolidating, disposal of surplus stuff as
directed within a radius of 3.0 Km.
Net Qty of refilling
Gunning the Surface in CM 1:2 Having thickness of
40 mm to 50 mm (Ave) for beam column and
Container slab incl. chilselling and scraping loose
conctrete cleaning the surface with water and air
under pressure and including providing and fixing in
position steel wires square mesh 75 mm X 75 mm as
5 211.20 Sqmt 624.37 Sqmt
per IS 1966-1982 3.15 mm Wt/sq.mt 1.64 kg with
spote welding aherever necessary with main
reinforcement incl. tying binding with wir incl.
scaffolding centering staging all quipment and
material etc. complete incl. labour and testing of the
HDPE Storage Tanks:
Supplying Rotationally moulded HDPE storage tank
with ISI Mark of approved make incl. all taxes
transportation octroi etc. complete. Storage Tanks
With ISI Mark (with outside Black colour & inside
lining) 5000 Lit
HDPE (PE-100) Pipes in standard length suitable for
Sewage, Industrial Effluents & Rising main Providing
& Supplying of ISI Marked High Density Poly
Ethylene (HDPE - PE-100) Pipes in standard length
suitable for Sewage & Industrial Effluents as per IS
Specification no. 14333-1996 or its latest revision /
amendments including all local & central taxes &
duties, freight charges, loading, unloading &
conveyance to departmental stores etc. complete.
mm HDPE- 6kg/cm2
Lowering, laying and jointing HDPE pipes and
specials of following class and diameter (By butt
fusion welding method including cost of conveyance
from stores to site of works at all level including cost
of labour, material, giving satisfactory hydraulic
testing etc. comp. 90 mm HDPE
Total (Part-A+Part-B+ Part C)
1. Agency have to quote their rates in figure and words in both ways.
2. (a) The bidder should strictly note that rate will be fixed and firm for supplying water supply to 43 villages, 21 Hamlet and
Narmada Vasahat covered under the Sankheda part-1 Regional Water Supply Scheme & also including 35 Faliya of
Villages (with) of Faliya Connectivity.
(b) If villages/Narmada Vasahat demand / refuse to take water supply same has to be added / omitted and Payment shall be
made accordinly villages served per day. (As per 2026 Population) on basis of unit rate method.
(c) At present GWSSB is maintaining this scheme by engaging daily wages labours through contract system. So Preference
may be given to these labours.
3. Presently water supplied to 43 villages, 21 Hamlet and 04 Narmada Vasahat & 35 Faliya of 43 Villages (with) of Faliya
4. villages/Hamlet/Narmada Vasahat included in scheme ( Annexure attached ) It may be added/omitted ( Variable) for
supply of water as per situation & demand.
5. Agency has to pay as per prevelant minimum wages per days to Labour as per labour commisonar Act.
NOTE : 1) The Payment of Items shown in Item of Schedule B shall be made according to the actual work done by the
Total of Schedule B (Preventive Maintenance of Civil Structures & Providing Portable water )----
I/ WE am /are willing to carry out the work…………………………..above………………………………………...
1.Estimated cost put to tender 1.Estimated cost put to tender
2.Deduct Rs./-……………………………………. 2.Deduct Rs./-……………….
4.In words Rs/-………… 4.In words Rs/-………………
Note.:-Please strike out which ever is not applicable.
• Rates to be quoted exclusive of GST.
• Part A is payable on monthly basis whereas part B & C are subject to completion of activities and approval of the
• Water supply of target quantity of water to all habitations (village, towns and hamlets)on a daily basis. If due to
breakdown, agency is not capable of supplying water then such quantity should be supplied the next day to cope up
with the shortage. Such that the water supplied on the next day will be 2 times the regular per day target.
• Contractor should quote rate in words & figure both.
• Insurance Policy should be procured in favour of Executive Engineer, PH Works Division, Chhotaudepur, and
contractor has to produce it before entering into agreement with department, for the full period of O&M.
• The bidders should strictly note that rate will be fixed and firm. No escalation will be given during the maintenance
• The work should be carried out as per the terms and conditions laid down in the tender specification.
• The cost of raw water, electricity will be borne by GWSSB.
• GWSSB will supply necessary stock of Chlorine gas, PAC & bleaching powder.carting charges shall be bare by the
agency. All other required material for O&M work shall be brought by the contractor at his own cost including
loading, unloading and carting and the same material shall get approval from the Engineer-in-charge before use in
• The cost is including all type of taxes (other than GST), octroi, freight, loading, unloading, carting labour charges
payment to labour including insurance, P.F. and all other liabilities for the staff engaged for the O&M work.
• All replaced material (provided from the department’s store) shall be returned to department store by the contractor
at his own cost.
Date & sign Deputy Executive Engineer Deputy Executive Engineer
of P. H. M. Sub-Division P. H. & S. Sub-Division
contractor. Bodeli Bodeli
Deputy Executive Engineer
Executive Engineer Executive Engineer
P. H. Mech Division P. H. Works Division
Chhotaudepur Chhotaudepur
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1.EMD_2876_01-May-2025_273.pdf
2. Affidavit-GwSSB 300 stamp.pdf
3. G.S.T. all Circular.pdf
4. Insurance-GR.pdf
6. Labour cess GR.pdf
7. Time limit circular.pdf
8. Un balacne Rate.pdf
9 .I.P Address GR.pdf
10. Submission of Doc GR.pdf
11. GWSSB Circular.pdf
12. ERP Entry Letter.pdf
13. Price Variation Paripatra 2023.pdf
14. 2024-10-03.pdf
Integrity Pact and Insurance.pdf
2. O and M Volume 1 DTP SP-1.pdf
3. O and M Model DTP Vol II SP-1.pdf
4. S and M specification Aug to SP-1.pdf
1. Sch A and B Sankheda Part-1.pdf
5. VOL 1B GCC PART -1 SP-1.pdf
Tender Notice Nivida No.01.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .