| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹53.7 LAccepted-AOC | ₹53.7 L Quoted ₹55.5 L | L1 | Accepted-AOC Lowest bidder |
| 2 | L2₹63.7 L+₹8.2 L (14.7%)Rejected-Finance HOUSE NO 29 A SIJUBARI NIZARA PATH PO PS HATTIGAON GUWAHATI 38 | KAMRUP METRO | ASSAM | 781038 | ₹63.7 L+₹8.2 L (14.7%) | L2 | Rejected-Finance Unsuccessful bidder |
| 3 | Rejected-Technical WZ 409 0 B 1ST FLOOR PLOT NO 12 JANAK PARK HARI NAGAR NEW DELHI 110064 | NEW DELHI | WEST DELHI | DELHI | 110064 | - | - | Rejected-Technical Being NO remarked in WLR of CE WC for QE Dec 2025 |
| Sl No | Description | Qty | Unit | REMCO L1 | M/S SEWAK SINGH L2 |
|---|---|---|---|---|---|
| 1.00 | Labour for Quarterly Maintenance contract for Daikin Chiller Model No- PFS2451DBRY of 3 x 220 TR capacity by OEM with following conditions. 1. 01 no of quarterly maintenance services & All breakdown calls. 2. inspecting entire system for any unusual condition such as noise, vibration etc. 3. check operating presssure and temperatures to ensure proper operating conditions, Evapouaror and condenser, chilled water flow, pressure drop 3. checking the entire system. 4. The Items if required will be measured & paid separately under different Items as supply only and labour work for replacement shall be included in the above quoted rates. The contractor should produce MOU with Daikin Company. | 2 | Each job | 3,80,000 ₹7,60,000 | 3,20,000 ₹6,40,000 Lowest |
| 1.01NOTES: (i) The contractor shall submit MOU with Dakin (OEM) Company. MOU (between OEM i,e M/S Daikin and contractor) along with all essential documents shall be submitted to Accepting Officer before commencement of work. (ii) During break down of plant, Technician from OEM have to attend the plant within 24 hrs, failing which penalty of Rs 200/- per hour per day be imposed on contractor. | |||||
| 1.02 | Supply only in replacement of Old lube oil of Screw compressor, flushing and replacement with New Lube oil all as per specification of OEM standard (RL- 68H) including testing complete to the entire satisfaction all as specified and directed. | 90 | Litres | 2,500 ₹2,25,000 | 1,650 ₹1,48,500 Lowest |
| 1.03 | Supply only in replacement of unserviceable Drier Core as per existing site complete all as specified and directed. | 3 | Each | 21,000 ₹63,000 | 3,000 ₹9,000 Lowest |
| 1.04 | Supply only in replacement of unserviceable Filter Drier all as per existing site complete all as specified and directed. | 3 | Each | 8,000 ₹24,000 | 2,500 ₹7,500 Lowest |
| 1.05 | Supply only in replacement of old temperature sensors in the incoming/outgoing water pipeline of the chiller unit all as per existing site complete to the entire satisfaction all as specified and directed. | 5 | Each | 10,000 ₹50,000 | 2,500 ₹12,500 Lowest |
| 1.06 | Supply only in replacement of old pressure transducers on the chiller unit all as per existing site and specifications complete to the entire satisfaction all as specified and directed. | 2 | Each | 12,000 ₹24,000 Lowest | 25,000 ₹50,000 |
| 1.07 | Supply only in replacement of old driver for Expansion valve all as per existing site and specifications complete to the entire satisfaction all as specified and directed. | 1 | Each | 3,500 ₹3,500 Lowest | 5,000 ₹5,000 |
| 1.08 | Supply only in replacement of old unserviseable Expansion valve all as per existing site and specifications complete to the entire satisfaction all as specified and directed. | 1 | Each | 3,500 ₹3,500 Lowest | 25,000 ₹25,000 |
| 1.09 | Supply only in replacement of old unserviseable oil level switch on the chiller unit all as per existing site and specifications complete to the entire satisfaction all as specified and directed. | 2 | Each | 18,000 ₹36,000 Lowest | 20,000 ₹40,000 |
Tender Value
₹70 L
EMD Value
₹1.3 L
Closing Date
21 May 2026, 6:00 pmClosed
CWE Tezpur
HQ CWE TEZPUR PO DEKARGAON DIST SONITPUR PIN 784501 (ASSAM)
REPAIR/MAINT OF CENTRAL TYPE AC PLANT VALVES, COOLING TOWERS, AHUs AT SAA UNDER GE (S) TEZPUR
2026_MES_761734_1
8278/TEZ(S)/E8
Open Tender
Electrical and Maintenance Works
Item Rate
270 days
Tezpur
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,000
GE (S) Tezpur
₹1.3 L
Yes
29 Jul 2026
23 Apr 2026
26 May 2026
23 Apr 2026
21 May 2026
14 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Labour for Quarterly Maintenance contract for Daikin Chiller Model No- PFS2451DBRY of 3 x 220 TR capacity by OEM with following conditions. 1. 01 no of quarterly maintenance services & All breakdown calls. 2. inspecting entire system for any unusual condition such as noise, vibration etc. 3. check operating presssure and temperatures to ensure proper operating conditions, Evapouaror and condenser, chilled water flow, pressure drop 3. checking the entire system. 4. The Items if required will be measured & paid separately under different Items . The contractor should produce MOU with Daikin Company. | - | Each job | - | - |
| - | Supply only in replacement of Old lube oil of Screw compressor, flushing and replacement with New Lube oil all as per specification of OEM standard (RL- 68H) including testing complete to the entire satisfaction all as specified and directed. | - | Litres | - | - |
| - | Supply only in replacement of unserviceable Drier Core as per existing site complete all as specified and directed. | - | Each | - | - |
| - | Supply only in replacement of unserviceable Filter Drier all as per existing site complete all as specified and directed. | - | Each | - | - |
| - | Supply only in replacement of old temperature sensors in the incoming/outgoing water pipeline of the chiller unit all as per existing site complete to the entire satisfaction all as specified and directed. | - | Each | - | - |
| - | Supply only in replacement of old pressure transducers on the chiller unit all as per existing site and specifications complete to the entire satisfaction all as specified and directed. | - | Each | - | - |
| - | Supply only in replacement of old driver for Expansion valve all as per existing site and specifications complete to the entire satisfaction all as specified and directed. | - | Each | - | - |
| - | Supply only in replacement of old unserviseable Expansion valve all as per existing site and specifications complete to the entire satisfaction all as specified and directed. | - | Each | - | - |
| - | Supply only in replacement of old unserviseable oil level switch on the chiller unit all as per existing site and specifications complete to the entire satisfaction all as specified and directed.(Labour shall be included in item No 1) | - | Each | - | - |
| - | Supply and charging of Gas Vacuum the system and after maintaining vacuum for 24 hours supply and charge refrigerant gas R-134A complete all as specified.(3x220TR AC plant) and directed. | - | Kgs | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.52 MB
BOQ_853251.xls
BOQ • 0.65 MB
8278tenderdocus.pdf
Tender Documents • 1.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .