Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹12.1 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹12.5 L+₹42,631.06 (3.53%)Admitted-Finance | L2 | Admitted-Finance |
Tender Value
₹14.2 L
EMD Value
₹28,400
Closing Date
19 Jun 2026, 6:00 pmClosed
Executive Engineer
KDA KOTA
Civil Work
2026_UITKo_566597_1
NIT 05/2026-27 (54)
Open Tender
Civil Works
Percentage
90 days
Kota
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,500
1500 Secrectry KDA, 500 MD RISL
₹28,400
Yes
30 Jun 2026
10 Jun 2026
22 Jun 2026
10 Jun 2026
19 Jun 2026
10 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. All kinds of soils | |||||
| 1.1 | By Mannual Means | 31 | cum | 178 | ₹5,518 |
| 2 | Providing and laying at or near ground level factory made kerb stone of M-25 grade cement in position to the required line, level and curvature jointed with cement mortar 1:3 (1 cement : 3 coarse sand ) including making joints with without grooves (thickness of joints except at sharp curve shall not to more than 5mm) including making drainage opening wherever required complete including painting etc. as per direction of Engineer-in-charge (length of finished kerb edging shall be measured for payment). (Precast C.C. kerb stone shall be approved by Engineerin- charge). | 15 | cum | 6,103 | ₹91,545 |
| 3Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : | |||||
| 3.1 | Two or more coats on new work | 2,000 | Sqm | 69 | ₹1,38,000 |
| 4 | Providing and fixing steel gate, grating , and grills made of angles, tees, square bars, flats,or black pipe with holdfast and fittings complete as per design and drawing including cutting welding and fabrication with priming coat of red oxide | 500 | Kg. | 96 | ₹48,000 |
| 5Steel work in built up tubular trusses including cutting, hoisting (height upto 10 m)fixing in position and applying a priming cout of approved steel primer, welded and bolted including special shaped washers ete. complete. | |||||
| 5.1 | Hot finished welded type tubes. | 400 | Kg | 100 | ₹40,000 |
| 6Providing and fabricating reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding (including cost of binding wire) all complete up to floor five level. ('Original producers' who manufacture billet directly from iron ores and roll the bilets to produce steel conforming to IS:1786) | |||||
| 6.1 | Thermo-mechanically Treated bars (Conforming of relevent IS code) | 100 | Kg. | 77 | ₹7,700 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.57 MB
Speical_Condition54.pdf
Tender Documents • 2.85 MB
BOQ_1008027.xls
BOQ • 0.50 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .