Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹36.2 LAccepted-AOC 51 HANUMAN COLONY GALI NO 4 CHAK 5 E CHHOTI SRI GANGANAGAR RAJ | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹38.4 L+₹1.2 L (3.28%)Rejected-Finance | L2 | Rejected-Finance Other than L1 | |
| 3 | L3₹39.8 L+₹2.7 L (7.18%)Rejected-Finance | L3 | Rejected-Finance Other than L1 | |
| 4 | L4₹41.6 L+₹4.5 L (12.0%)Rejected-Finance H1 7 8 IT PARK ROAD NO 4 IPIA KOTA RAJ 324005 | KOTA | RAJASTHAN | 324005 | L4 | Rejected-Finance Other than L1 | |
| 5 | L5₹42.2 L+₹5.0 L (13.5%)Rejected-Finance | L5 | Rejected-Finance Other than L1 |
| Sl No | Description | Qty | Unit | Ganesh Contruction L6 | M/s Prem Associates L7 | M/S MOHINI ENTERPRISES L5 | SINGH ENTERPRISES L2 | Aditya Enterprises L4 | S AND A ENGINEERS CONSTRUCTION CO L8 | ANNAPURNA ENTERPRISES L3 | SHIVA CONSTRUCTION COMPANY L1 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Taking down cement plaster on stone/brick/concrete surfaces including racking out joint, hacking for key, scrubbing down with water complete all as specified and as directed. | 650 | Sqm | 25 ₹16,250 | 45 ₹29,250 | 50 ₹32,500 | 60 ₹39,000 | 10 ₹6,500 Lowest | 50 ₹32,500 | 12 ₹7,800 | 30 ₹19,500 |
| 2.00 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing), removing serviceable tiles to store and rubbish off the premises complete all as specified and directed. | 339 | Sqm | 25 ₹8,475 | 85 ₹28,815 | 80 ₹27,120 | 90 ₹30,510 | 10 ₹3,390 Lowest | 100 ₹33,900 | 12 ₹4,068 | 50 ₹16,950 |
| 3.00 | Demolition of cement concrete(unreinforced) in ground floors and paving not exceeding 15 cm thickness (below or above ground level) complete all as specified and as directed. | 15 | Cum | 250 ₹3,750 | 500 ₹7,500 | 450 ₹6,750 | 400 ₹6,000 | 100 ₹1,500 Lowest | 200 ₹3,000 | 123 ₹1,845 | 300 ₹4,500 |
| 4.00 | Demolition of cement concrete (unreinforced) of any description and in any position, above or below ground floors, not otherwise specifically provided for complete all as specified and as directed. | 3.75 | Cum | 250 ₹937.5 | 410 ₹1,537.5 | 400 ₹1,500 | 400 ₹1,500 | 100 ₹375 Lowest | 250 ₹937.5 | 123 ₹461.25 | 300 ₹1,125 |
| 5.00 | Demolition of brick work or stone/boulder masonry, built in cement mortar including all quoins, arches, pillars, etc, but excluding ashlar facings, dressed stonework and precast concrete articles complete all as specified and as directed. | 4 | Cum | 250 ₹1,000 | 460 ₹1,840 | 450 ₹1,800 | 400 ₹1,600 | 100 ₹400 Lowest | 200 ₹800 | 123 ₹492 | 300 ₹1,200 |
| 6.00 | Dismantling of cast iron, PVC pipe or reinforced concrete drain pipes of size 75mm /100 mm jointed in cement mortar and taking out from walls,floors or from trenches, if required complete all as specified and as directed. | 35 | Running Metre | 250 ₹8,750 | 50 ₹1,750 | 40 ₹1,400 | 22 ₹770 | 100 ₹3,500 | 50 ₹1,750 | 12 ₹420 Lowest | 40 ₹1,400 |
| 7.00 | Taking up or down 15 mm bore of steel tubing and connections, including cleaning for refixing or removal to store or taken on schedule of credit complete all as specified and as directed. | 90 | Running Metre | 25 ₹2,250 | 50 ₹4,500 | 60 ₹5,400 | 20 ₹1,800 | 10 ₹900 Lowest | 70 ₹6,300 | 21 ₹1,890 | 30 ₹2,700 |
| 8.00 | Taking up or down 20 mm bore of steel tubing and connections, including cleaning for refixing or removal to store or taken on schedule of credit complete all as specified and as directed. | 120 | Running Metre | 25 ₹3,000 | 40 ₹4,800 | 50 ₹6,000 | 29 ₹3,480 | 10 ₹1,200 Lowest | 90 ₹10,800 | 22 ₹2,640 | 40 ₹4,800 |
| 9.00 | Dismantling water tanks capacity exceeding 250 litres but not exceeding 500 Litres and removing to store complete all as specified and as directed. | 6 | Each | 250 ₹1,500 | 40 ₹240 | 50 ₹300 | 300 ₹1,800 | 100 ₹600 | 150 ₹900 | 12 ₹72 Lowest | 200 ₹1,200 |
| 10.00 | Taking down wooden chowkhats or frames with shutters (without taking off shutters from the frames) area not exceeding 1.50 sqm each complete all as specified and as directed. | 26 | Each | 250 ₹6,500 | 30 ₹780 Lowest | 40 ₹1,040 | 90 ₹2,340 | 200 ₹5,200 | 100 ₹2,600 | 112 ₹2,912 | 100 ₹2,600 |
Tender Value
Refer Docs
EMD Value
₹75,000
Closing Date
29 Jun 2026, 6:00 pmClosed
Sh Rakesh Birla, EE
GE KOTA Pin-324001
SPL REPAIR TO PADDOCK LINE OFFR ACCN AT MIL STN KOTA
2026_MES_770635_1
9083E8
Open Tender
Civil Works
Item Rate
180 days
Mil Stn Kota
As per tender documents
8 documents required · 8 mandatory
₹500
GE KOTA
₹75,000
Yes
14 Aug 2026
8 Jun 2026
6 Jul 2026
8 Jun 2026
29 Jun 2026
24 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Taking down cement plaster on stone/brick/concrete surfaces including racking out joint, hacking for key, scrubbing down with water complete all as specified and as directed. | 650 | Sqm | - | - |
| 2 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing), removing serviceable tiles to store and rubbish off the premises complete all as specified and directed. | 339 | Sqm | - | - |
| 3 | Demolition of cement concrete(unreinforced) in ground floors and paving not exceeding 15 cm thickness (below or above ground level) complete all as specified and as directed. | 15 | Cum | - | - |
| 4 | Demolition of cement concrete (unreinforced) of any description and in any position, above or below ground floors, not otherwise specifically provided for complete all as specified and as directed. | 3.75 | Cum | - | - |
| 5 | Demolition of brick work or stone/boulder masonry, built in cement mortar including all quoins, arches, pillars, etc, but excluding ashlar facings, dressed stonework and precast concrete articles complete all as specified and as directed. | 4 | Cum | - | - |
| 6 | Dismantling of cast iron, PVC pipe or reinforced concrete drain pipes of size 75mm /100 mm jointed in cement mortar and taking out from walls,floors or from trenches, if required complete all as specified and as directed. | 35 | Running Metre | - | - |
| 7 | Taking up or down 15 mm bore of steel tubing and connections, including cleaning for refixing or removal to store or taken on schedule of credit complete all as specified and as directed. | 90 | Running Metre | - | - |
| 8 | Taking up or down 20 mm bore of steel tubing and connections, including cleaning for refixing or removal to store or taken on schedule of credit complete all as specified and as directed. | 120 | Running Metre | - | - |
| 9 | Dismantling water tanks capacity exceeding 250 litres but not exceeding 500 Litres and removing to store complete all as specified and as directed. | 6 | Each | - | - |
| 10 | Taking down wooden chowkhats or frames with shutters (without taking off shutters from the frames) area not exceeding 1.50 sqm each complete all as specified and as directed. | 26 | Each | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.38 MB
BOQ_862995.xls
BOQ • 0.34 MB
Tender9083.pdf
Tender Documents • 0.99 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .