Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹10.5 LAccepted-Finance | 1 | Accepted-Finance L1 | |
| 2 | 2₹10.7 L+₹19,392.38 (1.85%)Accepted-Finance | 2 | Accepted-Finance L2 |
Tender Value
Refer Docs
EMD Value
₹19,800
Closing Date
5 Jan 2022, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SA, ASI, Amaravati Circle, Vijayawada
Aurobindo Plaza,6-134/1, Kanuru Main Road, Kanuru, Vijayawada -520007 (A.P)
As per Tender document
2021_ASI_664962_1
30/NIT/2021-22/Amaravati /Kurnool Sub circle
Open Tender
Civil Works
Works
90 days
Yaganti, Kurnool Dist.
As per Tender document
7 documents required · 7 mandatory
₹0
₹19,800
Yes
O/o The SA, ASI, Amaravati Circle, Vijayawada
2 Mar 2022
24 Dec 2021
6 Jan 2022
24 Dec 2021
5 Jan 2022
24 Dec 2021
30 Dec 2021
90 days
Amount
Replacing of Broken beam in Nandi Mandap
Execution of work with the Departmental materials at site- Documentation of structural members like roof slabs, beams, capitals, sunshade slabs etc. to be removed for replacing the broken beam located on NE corner in Maha-Mandapa including all labour charges etc. complete as directed
Execution of work with the Departmental materials at site- Erection of scaffolding (Using departmental materials) of all around the Two aisle roof slabs for facilitating the labour including supporting the temporary props to intact roof beam to avoid unforeseen slippery if any during the process of replacing the cracked beam Note: As per site condition it is required to provide temporary props to all existing beams and lateral braces to all columns to unforeseen endanger, including all labour charges etc. complete. as directed
Execution of work with the Departmental materials at site- Erection of Supports with packed sand bags to intact roof beams/Columns to avoid unforeseen slippery/ lateral moments if any during the process of replacing the cracked beams including all labour charges etc. complete. as directed
Execution of work with the Departmental materials at site- Dismantling and removal of the clay tiles over the two aisle roof top of maha mandapa using chiseling rods slowly without causing any damage to bottom roof slabs at the height of 3.00m including disposing the same as debris by head loads through the steps around 120 no by ascending and descending and to be disposed beyond the protected limits approximately more than 300m including all labour charges etc.complete. as directed
Execution of work with the Departmental materials at site- Removal/ Dismantling the lime terracing concrete from the two aisle roof slabs of mukha mandap at N-E side using chisels slowly without causing any damage to bottom roof slabs at the height of 3.00m, 0.25m thick disposing the same (debris) by head loads to 120 no. steps by ascending and descending stair beyond the protected limits. (Lead is 300mts.) Including all labour charges etc. complete. as directed
Execution of work with the Departmental materials at site- Removal and placing at a side separately for carrying to stack point for reusing the useful taki stone roof slabs using chain pulley blocks and derrick poles and disposing the same broken slabs by head loads to 120 no. steps by ascending and descending stair beyond the protected limits. (lead is 300 mts.) including all labour charges etc. complete. as directed
Execution of work with the Departmental materials at site- Removal and disposing away the broken beam of size 2.80X0.28X0.37 mts. in Nandi mandap using chain pulley blocks and derrick polesand disposing the same broken beam by head loads to 120 no. steps by ascending and descending stair beyond the protected limits . (lead is 300 mts.) including all labour charges etc. complete. as directed
Execution of work with the Departmental materials at site- Setting/placing of Granite stone (Beam) block of size 3.00 X 0.33X0.42 mts, three-line dressing on all faces, sides and bottom and fixing in position as beams of size 2.80 X 0.28 X 0.37 mts. using chain pulley blocks and derrick poles, including all labour charges etc. complete. as directed
Execution of work with the Departmental materials at site- Setting of taki stone (Roof Slabs) blocks of average size 2.00X1.00X0.20 mts, cyclopean / wedge shape cutting and three line dressing the sides , bottom using chain pulley blocks and derrick poles , including all labour charges etc. complete. as directed
Execution of work with the Departmental materials at site- Resetting of removed taki stone roof slabs at stack point and fixing them to the original position in place of removed roof slab and joints sealed with lime mortar 1:2 using chain pulley blocks and derrick poles including all labour charges etc. complete. as directed
Execution of work with the Departmental materials at site- Laying of brick jelly, brick surkhi and burnt kankar lime concrete in 1:2 ( 1 brickjelly & 1 brick surkhi ) proportion as primary water tightening layer to 0.25 mts. thick, laid to required slopes for easy draining of rain water, well beating the surface by wooden rafter after the concrete became plastic mass by palming mixer of soaked and boiled gallnut and joggery till the surface readily rebounds and does not show any impressions on the surface, including all labour charges etc. complete. as directed
Execution of work with the Departmental materials at site- Laying of country clay tiles of size 150X150X20 mm mm over roof and joints sealed with silicon sealant, laid to required slopes for easy draining of rain water and as top finishing impervious layer, including all labour charges etc. complete. as directed
Execution of work with the Departmental materials at site- Removal of scaffolding all around the Two aisle roof slabs including all labour charges etc. complete. as directed
Execution of work with the Departmental materials at site- Removal of sand bags to intact roof beams/ Columns including all labour charges etc. complete. as directed
Pointing/joints sealed to outer periphery of garbha griha sikara – Vimana Portion of Temple
Execution of work with the Departmental materials at site- Raking and removing the cement mortar from the joints of outer periphery of garbha griha sikarawith out causing damage to the Structures and disposing the cement mortar by head loads, 120 no. steps by descending beyond the protected limits. (lead is 300 mts.) including all labour charges etc. complete. as directed
Execution of work with the Departmental materials at site- Sealing of Joints with silicon sealant to outer periphery of garbha gruha sikara to avoid inside seepage including all labour charges etc. complete. as directed
Conserving the old brick structures (gopuras) North and South side of Main Temple
Execution of work with the Departmental materials at site- Raking and removing the dead lime mortar from the joints of brick structure without causing damage to the brick layers, side walls and surface and top of the walls / Structures of gopuras and disposing the cement mortar by head loads, 120 no. steps by descending beyond the protected limits . (lead is 300 mts.) including all labour charges etc. complete. as directed
Execution of work with the Departmental materials at site- Pointing to the brick Structures (Gopuras) using Lime Mortar 1:2 and water tightening the area by filling the crevices neatly pointing matching the surface using necessary colours brushing and consolidating the brick portion by filling with lime stucco grout and finally rendering wherever required and neatly finishing as per original including curing and finally brush with soft brushes to give ancient finish etc complete at all heights, including all labour charges etc. complete. as directed
Construction of Retaining walls and laying of stone pitching at southern side of main temple
Execution of work with the Departmental materials at site- Earth work excavation for foundation to the retaining walls for to protect soil erosion/landslides including disposing waste away from monument by head loads including all labour charges etc. complete. as directed
Execution of work with the Departmental materials at site- Laying of Lime Concrete bed using unslaked lime, river sand and 40 mm HBG metal in proportion. 1: 4: 8 including all labour charges etc. complete. as directed
Execution of work with the Departmental materials at site- Construction of RR Masonry retaining wall in LM 1:2 including all labour charges etc. complete. as directed
Execution of work with the Departmental materials at site- Dry packed stone pitching to slopped area for to protect soil erosion at southern side of temple using available stone boulders and packing with stone pebbles of average not less than 20 cm thick (stones are collected from surrounding area) including all labour charges etc. complete. as directed
Pointing and Grouting (Main temple and other sub shrines of complex)
Execution of work with the Departmental materials at site- Pointing with L.M 1:2(Sunken Pointing) to masonry walls by laying necessary scaffolding after grouting with lime slurry into the joints, including all labour charges etc. complete. as directed
Fallen steps retaining wall on Northern side of the Gopura
Execution of work with the Departmental materials at site- Careful Removing & stacking of fallen CR masonry wall up to a required heights including stacking the CR veneering stones at convenient location for reuse when necessary, including all labour charges etc. complete. as directed
Execution of work with the Departmental materials at site- Restoring the fallen outer veneering walls after removed the CR wall using hard taki stones of sizes 0.90 X 0.45 X 0.30 and 0.60 X 0.45 X 0.30 mts after necessary three line dressing the surfaces and sides to get the texture and joints same as per existing pattern including fixing in position using necessary chain pulley blocks , derrick poles and skilled labour etc. all complete. as directed
Execution of work with the Departmental materials at site- Filling the core wall with CR stone masonry in LM 1:2, including all labour charges etc. complete. as directed
Replacing of broken beams in cloister mandap at peddakoneru
Execution of work with the Departmental materials at site- Documentation of roof slabs to be removed for replacing the broken roof beam including all labour charges etc. complete. as directed
Execution of work with the Departmental materials at site- Providing scaffolding (Using departmental materials) of all around the aisle roof slabs for facilitating the labour including supporting the temporary props to intact roof beam to avoid unforeseen slippery if any during the process of replacing the cracked beam ( Note: As per site condition it is required vertical temporary props to all existing in tacked beams and lateral braces to all columns to unforeseen endanger, including all labour charges etc. complete. as directed
Execution of work with the Departmental materials at site- Giving supports with close packed sand bags to intact roof beams/Columns to avoid unforeseen slippery/ lateral moments if any during the process of replacing the cracked beams including all labour charges etc. complete. as directed
Execution of work with the Departmental materials at site- Removal/ Dismantling the lime terracing concrete from the aisle roof slabs of Cloister mandap at peddakoneru using chisels alowly without causing any damage to bottom roof slabs at the height of 3.00m, 0.25m thick disposing the same (debris) by head loads to 20 no. steps by ascending and descending stair beyond the protected limits. (lead is 100 mts.) including all labour charges etc. complete. as directed
Execution of work with the Departmental materials at site- Removal and placing at a side separately for carrying to stack point for reusing the usefull taki stone roof slabs using chain pulley blocks and derrick poles and disposing the same broken slabs by head loads to 20 no. steps by ascending and descending stair beyond the protected limits. (lead is 100 mts.) including all labour charges etc. complete. as directed
Execution of work with the Departmental materials at site- Removal and disposing away the broken beam of size 2.30X0.30X0.30mts. using chain pulley blocks and derrick poles and disposing the same broken beam by head loads to 20 no. steps by ascending and descending stair beyond the protected limits. (lead is 100mts.) including all labour charges etc. complete. as directed
Execution of work with the Departmental materials at site- Setting of Granite stone( Beam ) block of size 2.5 X 0.33 X 0.33 mts, three line dressing on all faces, sides and bottom and fixing in position as beams of size 2.30 X 0.30 X 0.30 mts. using chain pulley blocks and derrick poles , including all labour charges etc. complete. as directed
Execution of work with the Departmental materials at site- Resetting of removed taki stone roof slabs at stack point and fixing them to the original position in place of removed roof slab and joints sealed with lime mortar 1:2 using chain pulley blocks and derrick poles including all labour charges etc. complete. as directed
Execution of work with the Departmental materials at site- Laying of brick jelly, brick surkhi and burnt kankar lime concrete in 1:2 ( 1 brickjelly & 1 brick surkhi ) proportion as primary water tightening layer to 0.25 mts. thick , laid to required slopes for easy draining of rain water , well beating the surface by wooden rafter after the concrete became plastic mass by palming mixer of soaked and boiled gallnut and joggery till the surface readily rebounds and does not show any impressions on the surface, including all labour charges etc. complete. as directed
Execution of work with the Departmental materials at site- Removal of scaffolding all around the aisle roof slabs including all labour charges etc. complete. as directed
Execution of work with the Departmental materials at site- Removal of close packed sand bags to intact roof beams/Columns including all labour charges etc. complete. as directed
Execution of work with the Departmental materials at site- Removal of debris mixed with boulders and stone pebbles at southern side of galigopuram and disposing the same by head loads to 120 no. steps by ascending and descending stair beyond the protected limits. (lead is 300 mts.) including all labour charges etc. complete. as directed
Execution of work with the Departmental materials at site- Conveyance /Transportation charges for shifting of scaffolding materials (departmental scaffolding pipes) from Kurnool to Yaganti and back including loading and unloading charges, Taxi charges for officials visit and all applicable charges etc. complete. as directed
T NARASIMHULU NAIDU
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .