Loading…
Loading…
Tender Value
₹1.7 Cr
EMD Value
₹2.2 L
Closing Date
24 Aug 2026, 11:00 amDue today
Staff Officer Kakri
Office of staff officer Kakri Project
Annual operation, maintenance and providing civil and electrical maintenance (including facility management service) for office and residential complex for 3 months at Kakri area.
2026_NCL_362955_1
NCL/KKR/CIVIL/26-27/ETN-07 dtd 02.08.2026
Open Tender
AMC for Housekeeping Activities
Percentage
90 days
Kakri Project
as per NIT
5 documents required · 5 mandatory
₹2.2 L
24 Aug 2026
3 Aug 2026
25 Aug 2026
4 Aug 2026
24 Aug 2026
4 Aug 2026
4 Aug 2026 - 12 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1PART (A) | |||||
| 1.01 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. | 12,500 | SqM | 9.65 | ₹1,20,625 |
| 1.02 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 100 | CuM | 206.7 | ₹20,670 |
| 1.03 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. All kinds of soil | 56.25 | CuM | 152.2 | ₹8,561.25 |
| 1.04 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size). | 6.25 | CuM | 6,036.15 | ₹37,725.94 |
| 1.05 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 20 mm nominal size). | 25 | CuM | 5,402.95 | ₹1,35,073.75 |
| 1.06 | Brick work with non-modular FALG bricks confirming to IS: 12894, class designation 7.5 average compressive strength etc. complete in all respect in foundation and plinth: In cement mortar 1:6 (1 cement : 6 coarse sand) | 37.5 | CuM | 5,193.8 | ₹1,94,767.5 |
| 1.07 | Brick work with non-modular FALG bricks confirming to IS: 12894, class designation 7.5 average compressive strength etc. complete in superstructure above plinth level upto floor V level: In cement mortar 1:6 (1 cement : 6 coarse sand) | 6.25 | CuM | 6,306.45 | ₹39,415.31 |
| 1.08 | Half Brick work with non-modular FALG bricks confirming to IS: 12894, class designation 7.5 average compressive strength etc. complete in all respect in foundation and plinth: In cement mortar 1:4 (1 cement : 4 coarse sand) | 146.87 | SqM | 657.5 | ₹96,567.03 |
| 1.09 | 12 mm cement plaster of mix :1:6 (1 cement: 6 fine sand) | 1,750 | SqM | 215.45 | ₹3,77,037.5 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.07 MB
Tendernotice_1.pdf
PDF • 8.36 MB
BOQ_375870.xls
BOQ • 0.55 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].