Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹44.5 LAccepted-Finance | L1 | Accepted-Finance The Quoted amount is inclusive of GST after negotiation with the firm and comply as per terms and conditions |
Tender Value
Refer Docs
EMD Value
₹90,000
Closing Date
5 Aug 2019, 3:00 pmClosed
STORES AND PURCHASE OFFICER
KNOWLEDGE CITY SECTOR 81 MOHALI
SITC OF PILOT SCALE R AND D PLANT ASSEMBLY FOR AGRI RESIDUE PROCESSING FOR BIOCOAL PRODUCTION
2019_NABI_483327_1
NABI/2(003)/19-20/N-PUR
Open Tender
Laboratory and scientific equipment
Supply
60 days
NABI CAMPUS
Please refer Tender documents.
3 documents required · 3 mandatory
₹590
Yes
NABI
₹90,000
Yes
9 Dec 2020
4 Jul 2019
6 Aug 2019
4 Jul 2019
5 Aug 2019
4 Jul 2019
PILOT SCALE R&D PLANT ASSEMBLY FOR AGRI-RESIDUE PROCESSING FOR BIOCOAL PRODUCTION
FEED BELT CONVEYOR (AS PER TENDER SPECS)
BIOMASS CHIPPER (AS PER TENDER SPECS)
HOLDING BIN (AS PER TENDER SPECS)
COMPARTMENT BELT DRYER WITH ELECTRICAL HEATING (AS PER TENDER SPECS)
BIOMASS PULVERISER (AS PER TENDER SPECS)
VIBRATING SCREEN (AS PER TENDER SPECS)
ROLLER BELT DRYER WITH ELECTRICAL HEATING (AS PER TENDER SPECS)
DRUM DRYER WITH ELECTRICAL HEATING (AS PER TENDER SPECS)
BRIQUETTER (AS PER TENDER SPECS)
BRIQUETTE PACKING UNIT (AS PER TENDER SPECS)
AIR POLLUTION CONTROL SYSTEM (AS PER TENDER SPECS)
Annual Maintenance Contract for 1st year after the completion of warranty (Not considered for financial bid comparision)
Annual Maintenance Contract for 2nd year after the completion of warranty (Not considered for financial bid comparision)
Annual Maintenance Contract for 3rd year after the completion of warranty (Not considered for financial bid comparision)
Annual Maintenance Contract for 4th year after the completion of warranty (Not considered for financial bid comparision)
Annual Maintenance Contract for 5th year after the completion of warranty (Not considered for financial bid comparision)
Comprehensive Maintenance Contract for 1st year after the completion of warranty (Not considered for financial bid comparision)
Comprehensive Maintenance Contract for 2nd year after the completion of warranty (Not considered for financial bid comparision)
Comprehensive Maintenance Contract for 3rd year after the completion of warranty (Not considered for financial bid comparision)
Comprehensive Maintenance Contract for 4th year after the completion of warranty (Not considered for financial bid comparision)
Comprehensive Maintenance Contract for 5th year after the completion of warranty (Not considered for financial bid comparision)
US Dollar
European Euro
British Pound
Swiss Franc
Japanese yen
Canadian Dollar
Portion of Quoted Rate in Currency
US Dollar
European Euro
British Pound
Swiss Franc
Japanese yen
Canadian Dollar
Portion of Quoted Rate in Currency
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .