Loading…
Loading…
Tender Value
₹1.5 Cr
EMD Value
₹1.5 L
Closing Date
1 Sept 2026, 6:00 pm3d left
Dy.Minicipal Commissioner - West Zone
Providing, Supplying and fixing new MS Grill As Per Design Given and repairing, replacing M.S Structural parts of existing grill and other necessary work at Diff.ward of Dyce-3 of West Zone (ARC) (Re-Tender)
337807
2/26-27 (T.N.28)
Open
Civil Works - Others
Works
Ahmedabad
4 documents required · 0 mandatory · 4 optional
₹3,600
Municipal Commissioner, Ahmedabad
₹1.5 L
22 Aug 2026
22 Aug 2026
22 Aug 2026
1 Sept 2026
22 Aug 2026
Name of Work: - Providing, Supplying and fixing new MS Grill As Per Design Given and repairing, replacing M.S
Structural parts of existing grill and other necessary work at Diff.ward of Dyce-3 of West Zone(ARC)
No Qty. Item Rs. Per Amount in Rs.
1 150 Box cutting the road surface to proper slope and camber
for making a base for road work including removing the
excavated stuff and depositing on the road side slope as
directed upto 50Mt.lead 101.91 Cmt.
2 Conveyance charge of earth, lime, murrum, building
rubbish, manure, garbage, sludge, excavated rock, fly ash,
aggregates of any kind executed outside the road site. Rate
also includes spreading & levelling etc complete. Internal
conveyance above 50 mt done within the work site is not
a 112 f) Lead From 5 Km to 10 Km.
b 75 g) Lead From 10 Km to 15 Km.
3 Extra rate over item of excavation of earth for excavation
of asphalt pavement of thickness upto 0.20 meter
including demolishing the asphalt carpet,metal,soiling
etc.comp. with stacking the material as directed. -
a 225 up to 0.20 mt thickness
c 188 0.20 to 0.30 meter (By any type of Breaker Machine or
R.C.C.Cutter machine including cost of operator, fuel, &
transportation etc complete. 177.76 Smt
b 113 0.30 meter & above (By any type of Breaker Machine or
R.C.C.Cutter machine including cost of operator, fuel, &
transportation etc complete. 311.08 Smt
4 22 Providing and Casting in situ controlled Cement Concrete
M-200 for R.C.C.Raft and cutt-off walls including necessary
shuttering laying, vibrating, ramming and curing complete. 4399.29 Cmt
5 150 Providing formwork of ordinary timber planking so as to
give a rough finishi ncluding centering shuttering strutting
and propping etc.Height of propping and centering belows
up porting floor to ceiling not exceeding 4M. and removal
ofthe same for in situ reinforced concrete and plain
concrete work in.(A)Foundations Footings Bases of
Columns etc. and Mass concrete. 171.68 smt
6 75 Providing TMT Bar FE 500D reinforcement for R.C.C.
work including bending, binding and placing in
position complete upto floor two level 75.46 Kg
7 Dismantling the following including loading, unloading and
disposal of unserviceable material for all lead or as
directed by Engineer-In-Charge and stacking the
serviceable material and backfilling the resulting trenches
and pits complete. -
i 75 Dismantling tiled or stone floors laid in mortar including
stacking of serviceable material and disposal of 47.25 Smt
uservicalble material with all lead and lifts. SOR 23-24 IT
ii 8 Demolition & disposal of unservisable material with all
lead and lift for unreinforeced concrete. SOR 23-24 IT CD
NO:20001B 603.23 Cmt
iii 8 Demolition of brick work & stone masonry including
stacking of serviceable materials and disposal of
unserviceable materials with all lead and lift (1) In cement
mortar. SOR 23- 24 IT CD NO:20003B 544.95 Cu.m
iv 8 Demolition including stacking of serviceable materials and
disposal of unserviceable materials with all lead and lift. (I)
R.C.C work. SOR 23-24 IT CD NO:20002 1047.38 Cu.m
Brick work using common burnt clay building
bricks having crushing strength not less than
35kg./Sq.Cm.in foundation and plinth in Cement
8 Mortar1:6 (1-Cement :6 - fine sand) -
(A) Conventional (upto 10 ton)
Providing 15 mm thick cement plaster in single coat
on Rough (Similar) side of single or half brick walls for
interior plastering up to floor two level and finished
even and smooth in (i) Cement mortar 1:3 (1-cement :3-
9 150 sand) 174.83 Sqm
Making Grill As per Design Shown in Atteched Drawing
including Extra rate over item of excavation of earth for
excavation of asphalt pavement / RCC of thickness up to
0.20 meter including demolishing the asphalt carpet,
metal, soiling/cutting Reinforcement etc. comp. with
stacking the material as directed.
up to 0.20 meter thickness (By Manual) 0.20 to 0.30 meter
(By any type of Breaker Machine or R.C.C.Cutter machine
including cost of operator, fuel, & transportation etc.
complete.0.30 meter & above (By any type of Breaker
Machine or R.C.C.Cutter machine including cost of
operator, fuel, & transportation etc. complete.
for foundation upto 1.5 m depth including sorting out and
stacking of useful materials and disposing off the
excavated stuff all lead and lift.(B) all kinds of soil
EARTH WORK (EXECUTED WITH MANUAL LABOUR)
Concrete (PCC) of grade - M15
Providing and laying in position Ready Mixed M- 150 grade
concrete for reinforced cement conctere work , using
cement content as per approved Design Mix manufactured
in fully automatic batching plant and transported to site of
work in transit mixer for a lead up to 10 kms having
continuous agitated mixer, manufactured as per mix
design of specified grade for reinforced cement concrete
work including pumping of R.M.C. from transit mixer to
site of laying, excluding the cost of centering shuttering
finishing and reinforcement including cost of admixtures in
10 1350 recommended proportions as per IS: 9103 to accelerate/ 10,235.00 Rmt
retard setting of concrete, improve workability without
impairing strength and durability as per direction of the
Engineer - in - charge. Without Fly Ash (Min cement level
as per latest IS 456 shall be maintained) Concrete (PCC) of
Providing and laying in position Ready Mixed M- 200 grade
concrete for reinforced cement conctere work , using
cement content as per approved Design Mix manufactured
in fully automatic batching plant and transported to site of
work in transit mixer for a lead up to 10 kms having
continuous agitated mixer, manufactured as per mix
design of specified grade for reinforced cement concrete
work including pumping of R.M.C. from transit mixer to
site of laying, excluding the cost of centering shuttering
finishing and reinforcement including cost of admixtures in
recommended proportions as per IS: 9103 to accelerate/
retard setting of concrete, improve workability without
impairing strength and durability as per direction of the
Engineer - in - charge. Without Fly Ash (Min cement level
as per latest IS 456 shall be maintained)
Structural steel work - Fabrication works - with paint
Providing, fabricating, assembling, hoisting, erecting and
fixing in position structural steel work at all heights/ all
levels/ all shapes & sizes with all leads & lifts using any
type of MS section like rolled steel sections, hollow
sections, plates, chequered plates, bar, sheet, rod,
threaded bolt, railing etc. all confirming to latest relevant
IS codes for the metal elements i.e. window grill, transom
bar, bright bar in wooden door - window frame, railings,
gates, grills, bracings, foundation plate & bolt, support at
truss system, truss, purlin, rafter ,cleat, platforms,
brackets, fencing pole, signage pole, service elements, Jali,
clamp, logo etc. including straightening, cutting, bending,
embosing, bolting and welding, etching (if required) the
members all as per structural drawings and as per detailed
specifications (for materials & workmanship) including
profile cutting, smooth grinding, machining of edges/
faces, necessary welding (electric arc welding) for required
weld lengths and sizes, machine drilling of holes for
joining/ anchoring/bolting, necessary arrangements of
templates to keep the foundation bolts in position dry
sanding, degreasing (wet cleaning) & preparation of rust-
free surface manually or mechanically, metal putty to
make the surface even and smooth, necessary scaffolding/
staging, anchor fasteners,extra for bending elements for
fixing etc complete. Extra for providing hydraulic bending
to MS member (i.e. hollow sections, rolled steel sections,
any type of plates, sheet, bar etc) of any thickness any size
as per drawing, for any type of steel structures like railing,
bus shelter, signage structure, gantry structure etc.
including straightening, profile cutting, bending (precision
bending), etc all as per approved shop drawings and as
directed by Engineer in charge.
Extra for providing Hot dip galvanizing work
confirming to IS 4759/ 2629/ 2633 with zinc of 610 GSM
thickness on any type of MS section for any elements etc.
for all the places, all heights, all level as per the drawing
and as instructed by Engineer in charge. The rate shall
include preparing the surface by shot blasting/ acid
washing prior to hot deep galvanizing, labour, tools,
machinery etc complete (Sample to be approved). The
weight of steel sections before galvanization shall be
measured for payment. The cost of steel sections shall be
paid for separately under relevant item. complete as per
structural designs & directions of Engineer-in-charge.
Supply & fixing factory finished cold formed Light guage
steel frame sections confirming to SP:6 (5) 1980 at site or
work including riveted, bolted or welded in builtup for all
type of sections ,in framed work, cutting, hoisting, fixing in
position and applying primer coat of approved steel primer
etc. complete as per structural designs & directions of
11 3900 Engineer-in-charge. 113.31 Kg.
Providing and supplying of labour for necessary manual
excavation, cleaning, Shifting of Material Or any other, or
for any other work as directed by Engineer In charge. The
12 38 Rate includes Handcart with Mazdoor 551 No
Makadam/ supervision at day / Night
WELDER/ Gas cutter at Day /night
Supplying of welding machine / gas cutter including cost of
welding rods/gas, Transportation, including carting from
15 23 site to work place. 1500 No
Labour for removing, repairing refixing M.S.Railing/grill or
its part at any locations of of any size as per existing
design including cost of red oxide painting it using two coat
of enamel paint of approved color shade Cost includes cart
& deposit of the scrap materials at the AMC store. The
contractor has to execute the work on site bringing
16 894 portable welding, cutter machine etc.comp. 18 Kg
17 60 Supplying Pneumatic Breaker Machine for RCC Slab or
Asphalt Demolishing Work on site byusing
Operator,fuel,power Supplyetc.Complete as Directed.(No
payment should be allowed for non working condition of
machinery and for pipe line excavation and 600 hrs
Hiring and Operating Generator of 7.50KV to 10.0 KV at Shift
site for welding Machine where power is not available (8
18 36 Rate including diesel for Generator & transporting at site 1650 hour)
19 8 Hiring of Tractor with trolley considering 8Hrs .As working
Day hours inclu.Driver with fuel,(iteam cod eno:-
H033SOR2023-24, Ahmedabad District road 1661.02 Day
Providing and Fixing weldmesh jali in 1.2 mt. X 0.60 mt.
frame with 2 nos of 1.2 mt length in horizontal and 2 nos
of 1.2mt long 25 mm X 25 mm X 3 mm MS angle and fixing
at 1.2 mt C/C and in with 0.30 mt x 0.30 mt in 1:2:4
20 36 concrete. Rate including two coats approved brand enamal 775 Rmt
paint as per instruction given by engineer in charge.
21 300 Supplying and fixing of 300 mm-L x 150 mm-B x 380 mm-H
Kerb block for Footpath in M-20 grade using 20 mm
nominal size black trap aggregate of Sevaliya/Timba or
equivalent quality for pre-cast blocks, reasonably exposed
finish/ formwork , mould with well equipped with
vibratory system for kerb stones of approved design
including curing, etc. complete, including the cost of
formwork etc. complete. The rate shall also include
necessary cutting of asphalt, fixing the Kerb stones in line
and level on 5 cm thick sand bedding with necessary
equipments and materials. The rate shall also include the
flush pointing in CM (1:3) for all joints of the kerbstones.
Filling of zari alone the sides of the kerb stone fixed with
Bituminous concrete mixed in proper position as directed
by Engineer in change to form a portable mixture. In any
case Gravel or such type of materials shall not be allowed
for production. a) Laying on 5 cm thick Sand Bedding 350.89 Rmt
22 75 Supplying and fixing of 450 mm H x 300 mm L x
Below..100 mm B Above Double Teper Kerb block for
footpath/Central Verge in M-20 grade using 20 mm
nominal size black trap aggregate of Sevaliya/Timba or
equivalent quality for pre-cast blocks, reasonably exposed
finish/ formwork, mould with well equipped with vibratory
system for kerb stones of approved design including
curing, etc. complete, including the cost of formwork etc.
complete. The rate shall also include fixing the Kerb
stones in line and level on 5 cm thick sand bedding with
necessary equipments and materials. The rate shall also
include the flush pointing in CM (1:3) for all joints of the
kerbstones. 525 Rmt
CONTRACTOR'S SIGNATURE ADDL.CITY ENGINEER
& STAMP (West Zone)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender No. 28 (2).pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].