Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical VILL KALINAGAR 5 NO WARD P O P S DIAMOND HARBOUR DISTRICT SOUTH 24 PARGANAS PIN 743331 | DIAMOND HARBOUR | SOUTH 24 PARGANAS | WEST BENGAL | 743331 | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical BAGARIA KULPI SOUTH 24 PARGANAS | KULPI | SOUTH 24 PARGANAS | WEST BENGAL | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical VILL MOLLAPUKHARIA P O PATRA P S DIAMOND HARBOUR DIST 24 PGS S PIN 743368 | DIAMOND HARBOUR | 24 PGS S | WEST BENGAL | 743368 | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical VILL DAKSHIN HAZIPUR P O DIAMOND HARBOUR DIST SOUTH 24 PGS PIN 743331 | DIAMOND HARBOUR | SOUTH 24 PARGANAS | WEST BENGAL | 743331 | Admitted-Fee/PreQual/Technical |
| 5 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
Tender Value
₹14.8 L
EMD Value
₹29,650
Closing Date
21 Nov 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE_DHHD
Office of the Executive Engineer, Diamond Harbour Highway Division, P.W.(Roads) Directorate
Horizontal Extension of the Security Guard Room along with Court Yard Development within the Office Building Premises under Diamond Harbour Highway Sub-Division of Diamond Harbour Highway Division in the District of South 24 Parganas.
2026_WBPWD_5083613_1
WBPWRD/EE/DHHD/NIT-17/26-27
Open Tender
CIVIL WORKS
Percentage
120 days
DIAMOND HARBOUR
Please refer Tender documents.
5 documents required · 5 mandatory
₹29,650
Yes
25 Nov 2026
6 Nov 2026
25 Nov 2026
6 Nov 2026
21 Nov 2026
6 Nov 2026
120 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. | 359.72 | Sq.M. | 17.6 | ₹6,331.07 |
| 2 | Surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m.
All kinds of soil. | 393.26 | Sq.M. | 34.15 | ₹13,429.83 |
| 3 | Taking out existing kerb stones of all types from footpath/ central verge, including removal of mortar etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. | 44 | M. | 39.35 | ₹1,731.4 |
| 4 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
All kinds of soil. | 20.54 | Cu.M. | 260.3 | ₹5,346.56 |
| 5 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lift. | 6.85 | Cu.M. | 196 | ₹1,342.6 |
| 6 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 26.11 | Cu.M. | 2,123.75 | ₹55,451.11 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for
Foundations, footings, bases of columns, etc. for mass concrete. | 3.6 | Sq.M. | 392.15 | ₹1,411.74 |
| 7.1 | Centering and shuttering including strutting, propping etc. and removal of form for
Columns, Pillars, Piers, Abutments, Posts and Struts. | 18 | Sq.M. | 961.3 | ₹17,303.4 |
| 7.2 | Centering and shuttering including strutting, propping etc. and removal of form for
Weather shed, Chajjas, corbels etc., including edges. | 6.39 | Sq.M. | 951.1 | ₹6,077.53 |
| 7.3 | Centering and shuttering including strutting, propping etc. and removal of form for
Suspended floors, roofs, landings, balconies and access platform with water proof ply 12 mm thick. | 19.63 | Sq.M. | 1,028.4 | ₹20,187.49 |
stage.html
html • 0.02 MB
tech_bid_open.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.70 MB
BOQ_5201407.xls
BOQ • 0.34 MB
WBF_2911.pdf
Tender Documents • 1.86 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .