| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.8 LAccepted-AOC | L1 | Accepted-AOC Lowest rate hence accepted | |
| 2 | L2₹6.5 L+₹69,084.37 (11.9%)Rejected-AOC LID AND EW KUMILY GRAMA PANCHAYAT KUMILY | PATHANAMTHITTA | KERALA | 689694 | L2 | Rejected-AOC Higher rate hence rejected | |
| 3 | L3₹6.8 L+₹98,605.65 (17.0%)Rejected-AOC | L3 | Rejected-AOC Higher rate hence rejected |
| Sl No | Description | Qty | Unit | Sebastian L2 | Santhosh.K.N L3 | MARTIN JOSEPH L1 |
|---|---|---|---|---|---|---|
| 1.00Appendix -A-Pre monsoon works. | ||||||
| 1.00 | 2.2:Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area | 1.44 | Hectare | 64,750.31 ₹93,046.2 | 67,693.51 ₹97,275.57 | 57,863.23 ₹83,149.46 Lowest |
| 1.00 | 10.2:Maintenance of Earthen Shoulder (filling with fresh soil) Making up the loss of material/ irregularities on the shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment. | 1,015 | sqm | 68 ₹69,020 | 71.09 ₹72,156.35 | 60.76 ₹61,671.4 Lowest |
| 1.00 | 2.1.1:Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit. Girth from 300 mm to 600 mm | 34 | each | 820.11 ₹27,883.74 | 857.38 ₹29,150.92 | 732.87 ₹24,917.58 Lowest |
| 1.00 | 10.11:Removal of earth from the choked hill side drain and disposing it on the valley side manually | 300 | metre | 134.98 ₹40,494 | 141.12 ₹42,336 | 120.62 ₹36,186 Lowest |
| 1.00 | 10.12:Clearance of land slides in soil and ordinary rock by a bull-dozer D 80 A-12, 180 HP and disposal of the same on the valley side | 137.09 | cum | 96.26 ₹13,196.28 | 100.64 ₹13,796.74 | 86.02 ₹11,792.48 Lowest |
| 1.01 | OD64317/2026-2027:Engaging a professional wood cutter equipped with the necessary machinery, including all
associated expenses, to cut and remove trees / branches of a tree that are standing in a hazardous
condition. | 5 | Day | 3,968.31 ₹19,841.55 | 4,148.68 ₹20,743.4 | 3,546.22 ₹17,731.1 Lowest |
| 1.01 | OD64318/2026-2027:Engaging Labour for various works as per the direction of Engineer in charge | 35 | each | 1,240.1 ₹43,403.5 | 1,296.46 ₹45,376.1 | 1,108.19 ₹38,786.65 Lowest |
| 2.00Appendix -B-Emergency works. | ||||||
| 2.00 | OD64319/2026-2027:Filling up potholes with bituminous ready mix compound (25 Kg bag) and compacting by
ramming to get a compact surface including cost of material, laying charges, transportation to
site etc. ( Rate is arrived for a bag of 25 kg) | 30 | each | 852.43 ₹25,572.9 | 891.18 ₹26,735.4 | 761.76 ₹22,852.8 Lowest |
Tender Value
₹5.9 L
EMD Value
₹14,759
Closing Date
3 Jul 2026, 11:30 amClosed
Kurian C George
AEE PWD Roads Sub Division Peermade
GENERAL-Urgent Monsoon works 2026 in various roads which are not included in RC under Roads section Kumily-Premonsoon works-General Civil Work
2026_PWD_857726_1
02/AEEP/2026-27 Dated 25/06/2026
Open Tender
Civil Works - Roads
Item Rate
Kumily
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,305
Yes
₹14,759
Yes
6 Aug 2026
25 Jun 2026
4 Jul 2026
25 Jun 2026
3 Jul 2026
25 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Appendix -A-Pre monsoon works. | |||||
| 1.001 | 2.2:Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area | - | Hectare | - | - |
| 1.002 | 10.2:Maintenance of Earthen Shoulder (filling with fresh soil) Making up the loss of material/ irregularities on the shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment. | - | sqm | - | - |
| 1.003 | 2.1.1:Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit. Girth from 300 mm to 600 mm | - | each | - | - |
| 1.004 | 10.11:Removal of earth from the choked hill side drain and disposing it on the valley side manually | - | metre | - | - |
| 1.005 | 10.12:Clearance of land slides in soil and ordinary rock by a bull-dozer D 80 A-12, 180 HP and disposal of the same on the valley side | - | cum | - | - |
| 1.006 | OD64317/2026-2027:Engaging a professional wood cutter equipped with the necessary machinery, including all
associated expenses, to cut and remove trees / branches of a tree that are standing in a hazardous
condition. | - | Day | - | - |
| 1.007 | OD64318/2026-2027:Engaging Labour for various works as per the direction of Engineer in charge | - | each | - | - |
| 2Appendix -B-Emergency works. | |||||
| 2.001 | OD64319/2026-2027:Filling up potholes with bituminous ready mix compound (25 Kg bag) and compacting by
ramming to get a compact surface including cost of material, laying charges, transportation to
site etc. ( Rate is arrived for a bag of 25 kg) | - | each | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1449901.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
Tendernotice_2.pdf
PDF • 0.18 MB
Tendernotice_3.pdf
PDF • 0.18 MB
BOQ_1449901.xls
BOQ • 0.31 MB
SBD.pdf
Tender Documents • 1.63 MB
preagt.pdf
Tender Documents • 0.27 MB
formoftender.pdf
Tender Documents • 0.25 MB
affidavit.pdf
Tender Documents • 0.25 MB
datecorrigendum.pdf
PDF • 0.10 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .