| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.5 LAccepted-AOC | ₹5.5 L | L1 | Accepted-AOC L1 BIDDER |
| 2 | L2₹5.6 L+₹6,051.77 (1.10%)Rejected-Finance 21 KBM CHAKDAH P O P S CHAKDAH DIST NADIA PIN 741222 | CHAKDAH | NADIA | WEST BENGAL | 741222 | ₹5.6 L+₹6,051.77 (1.10%) | L2 | Rejected-Finance L2 BIDDER |
| 3 | L3₹5.6 L+₹11,553.38 (2.10%)Rejected-Finance 35 P C SEN STADIUM BUILDING JANNAGAR ROAD MAHESH SERAMPORE HOOGHLY 712202 | SERAMPORE | HOOGHLY | WEST BENGAL | 712202 | ₹5.6 L+₹11,553.38 (2.10%) | L3 | Rejected-Finance L3 BIDDER |
Tender Value
₹5.5 L
EMD Value
₹11,003
Closing Date
13 Feb 2026, 4:00 pmClosed
E.E./CED 1
O/O EE/CED-I MAYUKH 4th FLOOR BIDHAN NAGAR KOL 91
Renovation of gents toilet in the 1st floor S.D.B. office of Mayukh Bhawan, under Civil Engineering Division No. 1, Sundarban Development Board, Department of Sundarban Affairs during the year 2025-26
2026_SAD_999863_2
WBSDB/EE/CED-I/NIeT-57/2025-26
Open Tender
CIVIL WORKS
Percentage
90 days
Mayukh Bhawan 4th floor Bidhan Nagar Kolkata 91
Please refer Tender documents.
4 documents required · 4 mandatory
₹11,003
Yes
16 Sept 2026
6 Feb 2026
17 Feb 2026
6 Feb 2026
13 Feb 2026
6 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m.
a) In ground floor including roof | 7.44 | cum | 447 | ₹3,325.68 |
| 1.01 | b) Extra rate for each addl. Floor over the rate of ground floor | 7.44 | cum | 50 | ₹372 |
| 2 | Dismantling all types of plain cement concrete works,tacking serviceable materials at site and removing rubbish as irected within a lead of 75m.
In ground floor including roof.
(a) upto 150 mm. thick | 2.88 | cum | 1,956 | ₹5,633.28 |
| 2.01 | (b) Extra rate for each addl floor over the rate of ground floor. | 2.88 | cum | 50 | ₹144 |
| 3 | Stripping off worn out plaster and raking out joints of walls, celings etc. upto any height and in any floor including removing rubbish within a lead of 75m as directed. | 25.7 | Sq.M. | 19 | ₹488.3 |
| 4 | Dismantling artificial stone flooring upto 50 mm. thick by carefully chiselling without damaging the base and removing rubbish as directed within a lead of 75 m. a) In ground floor including roof. | 25.7 | Sq.M. | 50 | ₹1,285 |
| 4.01 | b) Extra for each addl. Floor over the rate of gournd floor | 25.7 | Sq.M. | 18 | ₹462.6 |
| 5 | 125 mm. thick brick work with 1st class bricks in cement
mortar (1:3) in ground floor. | 12.96 | Sq.M. | 765 | ₹9,914.4 |
| 5.01 | Add extra for each additional floor over the rate for ground floor on items from (a) upto 4th floor | 12.96 | Sq.M. | 36 | ₹466.56 |
| 6 | Cleaning the exposed reinforcement preferably upto full diameter by wire brush, applying two coats of polymer based rust removing compound left for 24 hours, removing the coating and then applying two (2) coats of polymer modified anti corrosive protective coating formulated to inhibit the corrosion of reinforcement as per manufacturer's specification] [Mode of measurement:The affected surface area of reinforcement shall beconsidered for payment] | 22.5 | Sq.M. | 782 | ₹17,595 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.25 MB
Tendernotice_2.pdf
PDF • 0.54 MB
BOQ_2449430.xls
BOQ • 0.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .