Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.1 LAccepted-AOC ALAPATKIZHAKKUDAN HOUSE ATTORE KUTTUR P O THRISSUR | THRISSUR | THRISSUR | KERALA | L1 | Accepted-AOC Lowest rate and hence the work will be awarded to the Contractor | |
| 2 | L2₹8.2 L+₹13,095.58 (1.62%)Rejected-AOC | L2 | Rejected-AOC Higher rate.Hence Rejected | |
| 3 | L3₹9.3 L+₹1.2 L (14.6%)Rejected-AOC | L3 | Rejected-AOC Higher rate.Hence Rejected | |
| 4 | L4₹9.3 L+₹1.2 L (15.4%)Rejected-AOC | L4 | Rejected-AOC Higher rate.Hence Rejected |
Tender Value
₹10.1 L
EMD Value
₹25,127
Closing Date
30 Aug 2024, 6:00 pmClosed
Assistant executive engineer,
Assistant executive engineer, Head works sub division peechi
GENERAL PSM 2024 25 Improvement works to Kozhukkully branch canal between Ch. 5 100 to 5 200 km General Civil Work
2024_Irrig_686876_1
IRR/IA/TR/2664/2024_5_15_14/1
Open Tender
Civil Works - Canal
Item Rate
270 days
Thanippadam
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,760
Yes
₹25,127
Yes
14 Oct 2024
21 Aug 2024
2 Sept 2024
21 Aug 2024
30 Aug 2024
21 Aug 2024
Amount
Appendix-A
2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
2.33.2:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 60 cm girth up to and including 120 cm girth
M V Devassy
KURIAN POULOSE
WILSON O J
Bidder Name
WILSON O J
JOSE K C
KURIAN POULOSE
M V Devassy
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1068802.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .