Tender Value
₹53,032.98
EMD Value
₹50,000
Closing Date
18 May 2026, 6:00 pmClosed
Executive Engineer Panchayat R&B Division BOTAD
Annual Rate 2026-27 Repairs to Various Road (Asphalt) in Botad/Barwala /Ranpur /Gadhada Taluka Under Juridician of Deputy Executive Engineer, Panchayat R&B Sub Division-Botad
300659
nivida 2
Open
Civil Works - Roads
Works
Botad
9 documents required · 0 mandatory · 9 optional
₹1,500
Executive Engineer Panchayat R&B Division BOTAD
₹50,000
2 May 2026
2 May 2026
2 May 2026
18 May 2026
2 May 2026
BILL OF QUANTITY
Memorandum showing items of works to be carried out
Discription of Item (With Brief Specification and reference Quantit Rate In
Sr No.. Unit Amount
to book of Specification) y Figures
1 Providing and laying bituminous base course 37.50 mm thick 1.00 MT 2397.14
Bituminous (VG-30) tackcoat rate of 4.00 kg on WBM Surface
with using B.T. chips of required gradation and asphalt VG
grade for mixing @ 1.99 percentage by weight of total mix
including heating the aggregate and asphalt by drum mix plant
and spreading the same by paver finisher and consolidation with
vibratory roller including providing all materials equipment, tools
and plants, oil, kerosene, firewood, labour chrges etc.complete.
2 Providing and laying bituminous base course 37.50 mm thick 1.00 MT 2223.05
Bituminous (VG-30) tackcoat rate of 2.50 kg/10 sqm on BT
surface with using B.T. chips of required gradation and asphalt
VG 30 grade for mixing @ 1.99 percentage by weight of total
mix including heating the aggregate and asphalt by drum mix
plant and spreading the same by paver finisher and
consolidation with vibratory roller including providing all
materials equipment, tools and plants, oil, kerosene, firewood,
labour chrges etc.complete.
3 Providing, laying and rolling 37.50mm thick compacted 1.00 MT 3030.17
bitumenous Macadam (B.M.) in one layer with B.T. aggregates
as specified and using asphalt for tack coat at the rate of
2.50kg/10sqm (As per IRC-16) and using bitumen for mixing
with agg. at the rate of 3.50 percentage i.e 35.00kg/MT of total
mix including mixing in Drum mix plant and spreading the same
by paver finisher and consolidation with vibratory roller including
necessary including cost of hire charges, firewood, oil,
lubricants, labour charges, etc. by using constractor's own Drum
mix plant, machineries and equipment, tools etc. complete in
accordanace with the requirement of sepcification.
4 Providing and laying and rolling of Compacted mix seal surface 1.00 MT 3588.44
with B.T. and aggregate as spedified using bitumen for mixing
with aggregate at the rate of 5.10 percentage i.e 51.00Kg/MT of
total mix of Bitumen used per mix including heating and mixing
in drum mix plant and spreding the same heating and mixing in
drum mix plant and spreading the same by paver finisher and
consolidation with vibratory roller including necessary firewood,
oil, lubricants, labour charges using contractor's own drum mix
plant, machineries and equipment, tools etc including flushing of
sand 0.30cum/10sqm etc. complete in accordance with the
requirement of spefication.
5 Providing, laying and rolling of 25 mm thick open graded premix 1.00 MT 3052.90
ituminous carpet with B.T. aggregate as specified and using
bitumen for tack coat at the rate of 2.5 kg/10sq.mt. and using
bitumen for mixing with aggregate at the rate of 3.36 percentage
i.e. 33.60 kg/M.Ton of total mix including heating and mixing in
drum mix plant, speeding the same with pavers finisher and
consolidation with vibratory roller including necessary firewood,
oil, lubricants, labor charges etc. using contractor's own drum
mix plant and equipment, tool etc complete in accordance with
the requirement of specification.
6 Providing and laying premix seal coat with B.T.aggregate as 1.00 MT 3300.16
specified using aggregate at the rate of 0.18 cum/10 sqm. and
bitumen 80/100 ( V.G.30) for mixing with aggregate at the rate
of 4.50 percentage i.e.45.00 Kg / M.ton of total mix of Asphalt
including heating and mixing in drum mix plant and spreading
the same by paver finisher and consolidation with power roller
including necessary firewood, Oil, Lubricants, Labour Charges
using ontractor's own drum mix plant machineries and
equipment,tools etc.complete in accordance with the
requirement of Specification
7 Providing and laying bituminous base course 37.50 mm thick 1.00 MT 2122.05
Bituminous (VG-30) tackcoat rate of 2.50 kg/10 sqm on BT
surface with using B.T. chips of required gradation and asphalt
VG 10 grade for mixing @ 1.99 percentage by weight of total
mix including heating the aggregate and asphalt by drum mix
plant and spreading the same by Manual Mens and
consolidation as per MOST specifications including cost of all
materials, fuel, labours, tools and plants etc. using contractor's
own drum mix plant etc. complete.
8 Providing, laying and rolling 37.50mm thick compacted 1.00 MT 2929.17
bitumenous Macadam (B.M.) in one layer with B.T. aggregates
as specified and using asphalt for tack coat at the rate of
2.50kg/10sqm (As per IRC-16) and using bitumen for mixing
with agg. at the rate of 3.50 percentage i.e 35.00kg/MT of total
mix including mixing in Drum mix plant and spreading the same
by Mannual Mend and consolidation with vibratory roller
including necessary including cost of hire charges, firewood, oil,
lubricants, labour charges, etc. by using constractor's own Drum
mix plant, machineries and equipment, tools etc. complete in
accordanace with the requirement of sepcification.
9 Providing and laying and rolling of Compacted mix seal surface 1.00 MT 3487.44
with B.T. and aggregate as spedified using bitumen for mixing
with aggregate at the rate of 5.10 percentage i.e 51.00Kg/MT of
total mix of Bitumen used per mix including heating and mixing
in drum mix plant and spreding the same heating and mixing in
drum mix plant and spreading the same by Mannually Mens and
consolidation ith vibratory roller including necessary firewood,
oil, lubricants, labour charges using contractor's own drum mix
plant, achineries and equipment, tools etc including flushing of
sand 0.30cum/10sqm etc. complete.
10 Providing, laying and rolling of 25 mm thick open graded premix 1.00 MT 2951.90
ituminous carpet with B.T. aggregate as specified and using
itumen for tack coat at the rate of 2.5 kg/10sq.mt. and using
itumen for mixing with aggregate at the rate of 3.36 percentage
i.e. 33.60 g/M.Ton of total mix including heating and mixing in
drum mix plant, speeding the same with Mannually Mens and
consolidation with vibratory roller including necessary firewood,
oil, lubricants, labor charges etc. using contractor's own drum
mix plant and equipment, tool etc complete in accordance with
the requirement of specification.
11 Providing and laying premix seal coat with B.T.aggregate as 1.00 MT 3199.16
pecified using aggregate at the rate of 0.18 cum/10 sqm. and
bitumen 80/100 ( V.G.30) for mixing with aggregate at he rate of
4.50 percentage i.e.45.00 Kg / M.ton of total mix of Asphalt
including eating and mixing in drum mix plant and spreading the
same by Manually Mens and consolidation with ower roller
including necessary irewood, Oil, Lubricants, Labour Charges
using contractor's own drum mix plant machineries and
equipment,tools etc.complete in accordance with the
requirement of Specification.
12 Providing and laying asphalt painting on BT surface with 1.00 Sqm 33.74
bitumen grade 80/100 at the rate of 5.0kg/10 sqm by
mechanical spreyar nd spreading the stone dust on prepared
surface at the rate of 0.03 cum 10sqm and rolling with smooth
wheeled and penumatic roller and brushing etc complete.
13 Providing and laying wet mix macadum (W.M.M.) using 1.00 Cum 1248.36
machine crushed black trap aggregate of the material with water
OMC in mechanically mix (pug mill) carriage of mix material by
contractors own tipper to site of work including laying, spreading
and compacting in sub base, base course on well prepared
under base of compacting as per MOST Specification to achieve
the desired density (Mechanically laid).
14 Granualar Sub base with Black trap crushed stone well graded 1.00 Cum 1163.45
metirial (tablre-400.1) by mix in place method construction of
granular sub-base by providing black trap crushed stone well
grded metirial, spreading in uniform layers with motor grader on
prepared surface, mixing by mix in place method with rotavator
at OMC and compacting with vibratory roller to achieve the
desired density complate. (AS per technical specification clause-
401) For Gr-I Matetial.
15 Water Bound Macadam Grading-II (By Manual Means) 1.00 Cum 1505.91
Providing, laying, spreading and compacting stone aggregates
of 63 to 45mm sizes to water bound macadam specification
including spreading in uniform thickness, hand packing, rolling
with smooth wheel roller 80-100 kN in stages to proper grade
and camber, applying and brooming, stone screening/binding
materials to fill up the interstices of coarse aggregate, watering
and compacting to the required density. (As per Technical
Specification Clause 404-49A)
16 Water Bound Macadam Grading-I (By Manual Means) 1.00 Cum 1633.80
Providing, laying, spreading and compacting stone aggregates
of 90 to 45mm sizes to water bound macadam specification
including spreading in uniform thickness, hand packing, rolling
with smooth wheel roller 80-100 kN in stages to proper grade
and camber, applying and brooming, stone screening/binding
materials to fill up the interstices of coarse aggregate, watering
and compacting to the required density. (As per Technical
Specification Clause 404)
17 Supplying and stacking of soft murrum From quarry site to Work 1.00 Cum 394.75
Site including loading etc. Complete as per Instruction of
Engineer In charge.
18 Spreading blindage or road crust filling the gaps in metal and 1.00 Cum 154.84
leveling to camber and gradient as directed.(i) Murrum.
19 Supplying and stacking of Quarry Spaull From quarry site to 1.00 Cum 419.89
Work Site including loading etc. Complete as per Instruction of
Engineer In charge.
20 Supplying and fixing reinforced concrete heavy duty non- 1.00 Rmt 1968.37
pressure pipes with collars for culverts carrying heavy traffic as
per IS 458-1991 specifications including setting the pipes in
C.M. 1:2 watering and laying (to level or slopes) of class NP3 of
following internal daimeters.(iii) 600mm dia.
21 Supplying and fixing reinforced concrete heavy duty non- 1.00 Rmt 3469.25
pressure pipes with collars for culverts carrying heavy traffic as
per IS 458-1991 specifications including setting the pipes in
C.M. 1:2 watering and laying (to level or slopes) of class NP3 of
following internal daimeters.(v) 900mm dia.
22 Supplying and fixing reinforced concrete heavy duty non- 1.00 Rmt 5560.00
pressure pipes with collars for culverts carrying heavy traffic as
per IS 458-1991 specifications including setting the pipes in
C.M. 1:2 watering and laying (to level or slopes) of class NP3 of
following internal daimeters.(vii) 1200mm dia.
23 Engaging Tractor for Site works with mount Loader including 1.00 Hours 833.25
cost of driver, diesel, oil, grease and necessary equipments etc.
complete as directed by Engineer in Charge.
24 Engaging Tractor for Site works with Trolly including cost of 1.00 Hours 505.00
driver, diesel, oil, grease and necessary equipments etc.
complete as directed by Engineer in Charge.
25 Engaging JCB for Site works including cost of driver, diesel, oil, 1.00 Hours 1010.00
grease and necessary equipments etc. complete as directed by
Engineer in Charge.
26 Engaging Pneumatic Vibretory Road Roller which have capasity 1.00 Hours 850.79
of 8 to 10 tone for Site works including cost of driver, diesel, oil,
grease and necessary equipments etc. complete as directed by
Engineer in Charge.
Rupees Fifty Three Thousand Thirty Two and Paise Ninty Eight only
Fixed Deduction for available material from dismantling for First R.A. Bill
I/We am/are willing to carry out the work at… % above/below percent(Should be written in figures and words)
of the estimated rate mentioned above. Amount of my /our tender works out as under.
* Estimate 53,032.9800 * Estimated Amount
Put to tender Rs…………………… Put to tender Rs……………………
Deduct……..……..% Belowe Rs…………..….……. Add……..……..% Above Rs…………..….…….
In words………………….……………… In words………………….………………
Note :- 1.The Contractor shall exhibit a board with detailed specification and details of work as directed by
the Engineer-In-Charge for which no extra payment shall be made.
Note :- 2.The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
Note :- 3.GST and Income tax TDS will be deducted at a source while making payments of bills
Note :- 4.In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt.
G.R.: PRC-10/2017 Cement Consumption/16/C Date:11/05/2017 as stated in S.O.R. therefore in
R.C.C. items where there is a change as per actual mix design the cost of difference of cement
consumption have been deducted from the rate of original item at the rate of input rate mentioned in
all the tender.
Signature of Contractor
Amount Rs.0 of Dismentalled materials Shall be Recovered from 1st RA Bill of Contractor at Once.
Depurty Executive Engineer Executive Engineer
Panchayat R.& B. Sub Division Panchayat R.& B. Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BOQ.pdf
SBD Annual Rate 2026-27 Asphalt Work Botad final.pdf
Sharato Asphalt Work Botad.pdf
Specification.pdf
Test Schedule.pdf
Circular Annual Rate 2026-27_Part1.pdf
Circular Annual Rate 2026-27_Part2.pdf
Circular Annual Rate 2026-27_Part3.pdf
Circular Annual Rate 2026-27_Part4.pdf
Circular Annual Rate 2026-27_Part5.pdf
Circular Annual Rate 2026-27_Part6.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .