| 1 | L1₹16.1 LAccepted-AOC 1 306 LUCKNOW | LUCKNOW | UTTAR PRADESH | 226001 | L1 | Accepted-AOC L1 | |
| 2 | L2₹18.0 L+₹1.9 L (11.7%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹18.2 L+₹2.1 L (13.1%)Rejected-Finance CHAUDHARI ENGINEERING WORKS GORAKHPUR | GORAKHPUR | UTTAR PRADESH | 273001 | L3 | Rejected-Finance L3 | |
| 4 | L4₹19.8 L+₹3.7 L (23.2%)Rejected-Finance | L4 | Rejected-Finance L4 | |
| 5 | Rejected-Technical | - | Rejected-Technical REQUIRED EXEPRIENCE NOT SUBMITTED AND ADDITIONAL SELF DECLARATION NOT SUBMITTED |
| Sl No | Description | Qty | Unit | M/S M.K. ENTERPRISES L2 | BALENDRA SINGH L4 | M/S S S ENTERPRISES L1 | M/S CHAUDHARI ENGINEERING WORKS L3 |
|---|---|---|---|---|---|---|---|
| 1.00ITEM OF WORKK | |||||||
| 1.01 | Clearing of jungle including uprooting of rank vegetation ,grass etc. | 2,500 | SQM | 10.4 ₹26,000 | 5 ₹12,500 Lowest | 10.27 ₹25,675 | 10.53 ₹26,325 |
| 1.02 | contouring of sub station with help of leveling instrument total station instrument & staff including plotting of tres and structure if any incliding preparation of contour plan in 6 copies. | 2,500 | SQM | 1.04 ₹2,600 | 5 ₹12,500 | 1.03 ₹2,575 Lowest | 1.05 ₹2,625 |
| 1.03 | earth work in excavation by mechanical means in foundation trench or drain not exceeding 1.5mtr in width or 10 sqm on plan. Including dressing of sides | 68.71 | CUM | 152 ₹10,443.92 | 60 ₹4,122.6 Lowest | 150.1 ₹10,313.37 | 153.9 ₹10,574.47 |
| 1.04 | PROVIDING AND LAYING IN POSTION CEMENT CONCREAT OF SPECIFIC GRADE EXCLUDING THE COST OF CENTERING AND SHUTERING 1:4:8 | 8.59 | CUM | 3,968 ₹34,079.96 | 5,000 ₹42,943.5 | 3,918.4 ₹33,653.96 Lowest | 4,017.6 ₹34,505.96 |
| 1.05 | Steel reinforcement work RCC work including straightening, cutting, bending, placing in position and binding in all complete up to plinth level with steel bars of grade FE-500D or more | 1.42 | MT | 63,200 ₹89,800.88 | 45,000 ₹63,940.5 Lowest | 62,410 ₹88,678.37 | 63,990 ₹90,923.39 |
| 1.06 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering ,shuttering , finishing and reinforcement all work up to plinth level 1:1.5:3 | 13.7 | CUM | 5,268.8 ₹72,203.64 | 9,500 ₹1,30,188 | 5,202.94 ₹71,301.09 Lowest | 5,334.66 ₹73,106.18 |
| 1.07 | CENTERING AND SHUTTERING INCLUDING STRUTTING PROPPING ETC | 18 | SQM | 228.8 ₹4,118.4 | 800 ₹14,400 | 225.94 ₹4,066.92 Lowest | 231.66 ₹4,169.88 |
| 1.08 | Reinforced cement concrete work in walls including attached pilasters buttresses plinth and string courses fillets columns pillars piers etc , above plinth level uo to floor level with 1:1.5:3 | 1.56 | CUM | 6,321.6 ₹9,831.98 | 7,000 ₹10,887.1 | 6,242.58 ₹9,709.08 Lowest | 6,400.62 ₹9,954.88 |
| 1.09 | Centering and shuttering including stutting propping etc | 23.81 | SQM | 560 ₹13,335.84 | 500 ₹11,907 Lowest | 553 ₹13,169.14 | 567 ₹13,502.54 |
Tender Value
₹26.5 L
EMD Value
₹52,960
Closing Date
20 Sept 2025, 12:00 pmClosed
EE LID GORAKHPUR
OFFFCIE EE LID GORAKKHPUR
NABARD Funded Modernization of Ch. Charan Singh Doharighat Pump Canal, Distt- Mau SWITCH GEAR ROOM BUILDING WORK with all requierd accessories, tool and tackle at doharighat pump canal mau.
2025_UPIDM_1073793_1
1096/EE-LID GKP/02/09/2025/26-27
Open Tender
Civil Works
Item Rate
90 days
DOHARIGHAT MAU
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹52,960
5 Dec 2025
13 Sept 2025
20 Sept 2025
13 Sept 2025
20 Sept 2025
13 Sept 2025
Amount
ITEM OF WORKK
Clearing of jungle including uprooting of rank vegetation ,grass etc.
contouring of sub station with help of leveling instrument total station instrument & staff including plotting of tres and structure if any incliding preparation of contour plan in 6 copies.
earth work in excavation by mechanical means in foundation trench or drain not exceeding 1.5mtr in width or 10 sqm on plan. Including dressing of sides
PROVIDING AND LAYING IN POSTION CEMENT CONCREAT OF SPECIFIC GRADE EXCLUDING THE COST OF CENTERING AND SHUTERING 1:4:8
Steel reinforcement work RCC work including straightening, cutting, bending, placing in position and binding in all complete up to plinth level with steel bars of grade FE-500D or more
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering ,shuttering , finishing and reinforcement all work up to plinth level 1:1.5:3
CENTERING AND SHUTTERING INCLUDING STRUTTING PROPPING ETC
Reinforced cement concrete work in walls including attached pilasters buttresses plinth and string courses fillets columns pillars piers etc , above plinth level uo to floor level with 1:1.5:3
Centering and shuttering including stutting propping etc
Earth work in excavation by mechanical means in foundation trench
Providing and laying in postion cement concrete of specific grade excluding cost of centering and shuttering all work up to plinth level 1:4:8
brick work in foundation and plinth WITH 1:6 (1 cement:6 corase sand)
steel reinforcement for RCC work including all work cutting bending etc for beams, e&w, ver,jer, stirrups etc
for centering and shuttering propping etc for above
reinforced cement concrete works in walls including attached plasters with 1;1.5:3
steel reinforcement for RCC work including all work cutting bending etc up to plinth level with bars of grade Fe-500D or more
reinforced cement concrete works in walls including attached plasters with 1;1.5:3
reinforced cement concrete works in walls including attached plasters with 1;1.5:3
Centering and shuttering including strutting propping etc and removal of form for columns ,pillars, piers abutments posts and struts
excavation supplying stacking and filling of local earth by mechanical mean up to lead of 5km also including ramming and watering of earth in foundation of trench complete for all lift.
brick work in foundation and plinth WITH 1:6 (1 cement:6 corase sand) for external wall and wall B , FOR external wall and wall b east and west side, for minor wall south side projection
half brick masonry work with common burnt clay brick of class above plinth level up to floor level with cement mortar 1:4
steel reinforcement for RCC work including all work cutting bending etc up to plinth level with bars of grade Fe-500D or more
Reinforced cement concrete work in beams , suspended floors roof having slop up to 15 degree landing , balconies with 1:1.5:3
reinforced cement concrete works in walls including attached plasters with 1;1.5:3
brick work in foundation and plinth WITH 1:6 (1 cement:6 coarse sand)
half brick masonry work with common burnt clay brick of class above plinth level up to floor level with cement mortar 1:4
Making of trench in the floor of SGR BULDING Including all materials and accessories of length 10 meter
steel reinforcement for RCC work including all work cutting bending etc up to plinth levelwith bars of grade Fe-500D or more, for lintel of total roof with making jali of bars anchore bars beams and tie beams and as requird
fixing circular celling fan clamp
reinforced cement concrete work in beam suspended floor roof havinf slop 15 degree landing balconies with 1:1.5:3 all beams and slab of sgr building
centering and shuttering including strutting propping etc and removal of form for weather shade chajjas corbels etc including edges.
centering and shuttering including strutting propping etc and removal of form for weather shade chajjas corbels etc including edges.
12mm cement plaster finished with a floating coat of neat cement of mix 1:3 at SGR slab
steel work welded in built up sections framed work including cutting hoisting fixing in postion and applying a primer coat of approved steel primer using structural steel etc as requierd all comlete in grating frames guard bar ladder ralling brackets gates and simmilar worls for door exhaust hole window and as requierd.
12mm cement plaster finished with a floating coat of neat cement of mix 1:4 IN side of SGR building
add for plaster drio to rcc projection
PROVIDING 12x15 mm section groove in plaster including all material labour and t&p
12 MM plaster of mix 1:6 SGR HALL VERANDAH, JER, STORE, ALMIRAH, TIOLET
PROVIDING AND FIXING factroy made ISI marked steel door glazed doors window and ventilators
providing and fixing glass panels with putty and glazing clips in steel doors windows
providing and fixing fly proof wire gauze to windows
providing and laying in posttion cement concrete of specific grade excluding the cost of centering andshuttering all work up to plinth level 1:4:8 , HALL, JER, VER, STORE,T&P, TIOLET
EARTH WORK FOR APPRON
PROVIDING AND LAYING IN POSTION CEMENT CONCRETE WITH 1:4:8 FOR APPRON
BRICK WORK FOR APPRON WITH 1:6 (1 cement:6 corase sand)
PROVIDING AND LAYING IN POSTIONING CEMENT CONCRETE EXCLUDING COST OF CENTERING SHUTTERING FOR APPRON WITH 1:4:8
PROVIDING GLASS STRIP IN FLOOR
4.0 CM THICK1:1.5:3 PLAIN CEMENT FLOOR WITH CEMENT APPROVED COARSE SAND AND 2 CM GRADEED APPROVED STONE BALLAST FRO APPRON
M/S M.K. ENTERPRISES (BID ID -5546906)
M/S CHAUDHARI ENGINEERING WORKS (BID ID -5545956)
BALENDRA SINGH (BID ID -5547375)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .