| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.5 CrAccepted-Finance BHAGIRATHIPUR DOMKAL MSD | DOMKAL | MURSHIDABAD | WEST BENGAL | 742101 | ₹26.5 Cr | L1 | Accepted-Finance L1 |
| 2 | L2₹26.6 CrRejected-Finance 140 RAJDANGA CHAKRABORTY PARA 1ST FLOOR KASBA KOLKATA 700107 | KOLKATA | KOLKATA | WEST BENGAL | 700107 | ₹26.6 Cr | L2 | Rejected-Finance L2 |
| 3 | L3₹26.6 CrRejected-Finance VILL RAMBAGH P O BHAGWANGOLA P S BHAGWANGOLA DIST MURSHIDABAD | BHAGWANGOLA | MURSHIDABAD | WEST BENGAL | ₹26.6 Cr | L3 | Rejected-Finance L3 |
| 4 | Rejected-Technical 160 10 3A A C ROAD P O KHAGRA DIST MURSHIDABAD PIN 742103 W B | MURSHIDABAD | WEST BENGAL | 742103 | - | - | Rejected-Technical TECHNICALLY NOT QUALIFIED |
| 5 | Rejected-Technical GOFANAGAR TAPAN DAKSHIN DINAJPUR | DINAJPUR DAKSHIN | WEST BENGAL | 733101 | - | - | Rejected-Technical TECHNICALLY NOT QUALIFIED |
Tender Value
₹26.7 Cr
EMD Value
₹53.3 L
Closing Date
24 Sept 2025, 3:00 pmClosed
Chairman
Maheshtala South 24 Pgs Kolkata
House service water Connection to 27887 Nos. of Premises at different wards up to private property line with 20 mm OD HDPE (PE100,PN16) with necessary connection accessories including Water Meter and restoration of damages of road pavement etc for
2025_MAD_897150_1
MAD/MM/NIQ-3/SS/25-26
Open Tender
PLUMBING WORKS ORG
180 days
Maheshtala Municipality
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹53.3 L
17 Oct 2025
2 Sept 2025
9 Oct 2025
2 Sept 2025
24 Sept 2025
2 Sept 2025
Amount
Providing FHTC from the existing CI / DI / UPVC / HDPE / GI / AC distribution pipeline by supplying, fitting, fixing & installing of 10mm Brass Ferrule of approved make upto 450mm long conforming to lS 2692:1989 with latest amendments on the said pipeline with supply, fitting & flxing of all other accessories like saddle piece of required size to fit the existing distribution pipeline, specials, nut & bolts, rubber sheet, washers etc. and supply & laying of 20mm OD HDPE (PE100, PN16) pipe upto required length with all necessary specials 1.0 metre below (approx.) the ground connecting the ferrule/flow control valve including cutting trenches in all sorts of soil as well dismantling of any hard crust layer/concrete/masonry etc.(average. 0.3cum per connection) and filling up trenches as per direction of the Engineer-in-charge and upto a point just inside the premises of the household or as directed by ElC. Supply and installation of a 15mm dia. alloy iron Bib Cock (tested to 21 Kg/cm2) above 1.0 Mtr. from ground, an alloy Stop Cock of 15 mm dia. with brass spindle (tested to 21 Kg/cm2) to be fitted in a position as directed by E.l.C. G.l pipe of TATA make (medium duty) of 2 metre length with all necessary specials to continue from the end of the HDPE pipe & upto 1.0 m. above ground within the premises of household including Supply, Fitting and Fixing of Multi Jet Class-B domestic / commercial water metering system (size 15 mm) strictly conform to IS 779-1994 (with all amendements) or MID with AMR compatibility as per departmental specification in the NIT with PE meter box and with FCV cum NRV made of solid steel bar (hexagonal & round) and SS ball for float option, materials grade of stainless steel finished with CNC machining of size not less than 71mm with connection size : 15mm dia BSP thread design & working in float principle as per CPHEEO manual including cost of materials as specified as per direction of EIC along with periodcial meter reading and submission of reports as mentioned in the scope of work as well as per direction of EIC. Casing Pipe of 25mm dia (TATA MAKE GI PIPE MEDIUM DUTY) to be provided by the contractor for crossing of drain if any. All the damages made on the roads, the compound walls etc. for providing House service connection shall have to be restored by the Ordinary cement concrete (1:2:4) by the contractor as per direction of EIC. Any damages made on the floor / PCC / tiled / mosaic etc. shall be restored by the Contractor with Ordinary Cement Concrete (1:2:4) and neat cement finish as per direction of EIC. N.B.-GST will be applicable as per Govt. norms. For Above 10 mtr and upto 20 meter length of HDPE pipe from the distribution pipe line.
Providing 896 nos. Semi Skilled Labour (to be engaged for Four years) for taking periodical meter reading (once in three months) and submission to concerned deptt. both soft copy and hard copy once in three months for cheking and verification.
Taking complain from beneficiaries regarding Leakage in House Service Connection / Slow or non supply of water in House Service Connection and Repairing of Leakage, Cleaning or replacing of Ferrule for Four years by dismantling of Plain cement Concrete, Earth Cutting and refilling of earth, trimming, ramming and concreting by Ordinary Cement Concrete (1:2:4) after cleaning or replacing of ferrule and restoration of House Service Connection. (Considering 5% of total HSC for One year)
UMWELT ENGINEER PVT. LTD. (BID ID -6949836)
S P CONSTRUCTION (BID ID -6920644)
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf