Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.3 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹4.7 L+₹38,081.34 (8.82%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | ANIL KUMAR P L1 | SAJI P L2 |
|---|---|---|---|---|---|
| 1.00Maintenance | |||||
| 1.00 | 14.83:Hacking of CC flooring including cleaning for surface etc. complete as per direction of the Engineer-in-Charge. | 72 | sqm | 3.14 ₹226.08 Lowest | 3.41 ₹245.52 |
| 1.00 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | 2.27 | cum | 3,190.47 ₹7,258.32 Lowest | 3,471.98 ₹7,898.75 |
| 1.00 | 16.83:Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. | 28.2 | sqm | 118.37 ₹3,338.03 Lowest | 128.82 ₹3,632.72 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 50.76 | cum | 223.85 ₹11,362.63 Lowest | 243.6 ₹12,365.14 |
| 1.00 | 22.5:Providing and laying water proofing treatment in sunken portion of WCs, bathroom etc., by applying cement slurry mixed with water proofing cement compound consisting of applying : a) First layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound @ 0.253 kg/sqm. This layer will be allowed to air cure for 4 hours. b) Second layer of slurry of cement @ 0.242 kg /sqm mixed with water proofing cement compound @ 0.126 kg/ sqm. This layer will be allowed to air cure for 4 hours followed with water curing for 48 hours. The rate includes preparation of surface, treatment and sealing of all joints, corners, junctions of pipes and masonry with polymer mixed slurry. | 72 | sqm | 562.9 ₹40,528.8 Lowest | 612.57 ₹44,105.04 |
| 1.01 | 5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 11.75 | cum | 11,097.61 ₹1,30,396.92 Lowest | 12,076.81 ₹1,41,902.52 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 1,175 | kilogram | 97.68 ₹1,14,774 Lowest | 106.3 ₹1,24,902.5 |
| 1.01 | 5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 23.6 | sqm | 729.52 ₹17,216.67 Lowest | 793.89 ₹18,735.8 |
| 1.01 | 50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete | 72 | sqm | 298.72 ₹21,507.84 Lowest | 325.07 ₹23,405.04 |
Tender Value
₹5.1 L
EMD Value
₹12,694
Closing Date
19 Sept 2026, 11:00 amClosed
The Assistant Executive Engineer, PWD Building
O/o the Assistant Executive Engineer, PWD Buildings Sub division, PMG, Thiruvananthapuram.
GENERAL-Nursing School Maintenance work -Sump in Hostel-General Civil Work
2026_PWD_867793_1
PWD/BLDG/TR/11506/2026_5_1_1/1
Open Tender
Civil Works - Buildings
Item Wise
90 days
Thiruvananthapuram
Please refer Tender documents.
10 documents required · 10 mandatory
₹1,120
Yes
₹12,694
Yes
24 Sept 2026
5 Sept 2026
22 Sept 2026
5 Sept 2026
19 Sept 2026
5 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Maintenance | |||||
| 1.001 | 14.83:Hacking of CC flooring including cleaning for surface etc. complete as per direction of the Engineer-in-Charge. | 72 | sqm | - | - |
| 1.002 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | 2.28 | cum | - | - |
| 1.003 | 16.83:Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. | 28.2 | sqm | - | - |
| 1.004 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 50.76 | cum | - | - |
| 1.005 | 22.5:Providing and laying water proofing treatment in sunken portion of WCs, bathroom etc., by applying cement slurry mixed with water proofing cement compound consisting of applying : a) First layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound @ 0.253 kg/sqm. This layer will be allowed to air cure for 4 hours. b) Second layer of slurry of cement @ 0.242 kg /sqm mixed with water proofing cement compound @ 0.126 kg/ sqm. This layer will be allowed to air cure for 4 hours followed with water curing for 48 hours. The rate includes preparation of surface, treatment and sealing of all joints, corners, junctions of pipes and masonry with polymer mixed slurry. | 72 | sqm | - | - |
| 1.006 | 5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 11.75 | cum | - | - |
| 1.007 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 1,175 | kilogram | - | - |
| 1.008 | 5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 23.6 | sqm | - | - |
| 1.009 | 50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete | 72 | sqm | - | - |
stage.html
html • 0.02 MB
finance_1469640.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1469640.xls
BOQ • 0.31 MB
viewsbd.pdf
Tender Documents • 1.64 MB
epayment.pdf
Tender Documents • 0.05 MB
PreliminaryAgreement.pdf
Tender Documents • 0.27 MB
declaration.pdf
Other Document • 0.00 MB
form_of_tender.pdf
Tender Documents • 0.18 MB
integrity_pact.pdf
Other Document • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .