Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.6 LAccepted-AOC | L1 | Accepted-AOC Agreement executed work awarded | |
| 2 | L2₹9.7 L+₹1.1 L (12.8%)Rejected-AOC | L2 | Rejected-AOC Agreement executed work awarded |
Tender Value
₹8.9 L
EMD Value
₹22,322
Closing Date
11 Aug 2020, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Assistant Executive Engineer
PWD Special Buildings Sub division Kozhikode
The estimate include Dismantling the tile steel wood work Providing and fixing tile strengthening reinforcement bar Truss work and remove block from bath room
2020_PWD_373939_1
PWD/2020-2021/9261/
Open Tender
Civil Works - Buildings
Item Rate
180 days
Kuthiravattom
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,970
Yes
online
₹22,322
Yes
18 Sept 2020
28 Jul 2020
13 Aug 2020
28 Jul 2020
11 Aug 2020
28 Jul 2020
60 days
Amount
truss work ward 7
15.19 : Dismantling steel work manually / by mechanical means in built up sections without dismembering and stacking within 50 metres lead as per directions of Engineer -in-Charge.Dismantling steel work manually / by mechanical means in built up sections without dismembering and stacking within 50 metres lead as per directions of Engineer -in-Charge.
15.28.1 : Dismantling roofing including ridges, hips, velleys and gutters etc., and stacking the material within 50 metres lead of :G.S. Sheet
15.14.1 : Dismantling wood work in frames, trusses, purlins and rafters up to 10 metres span and 5 metres height including stacking the material within 50 metres lead:Of sectional area 40 square centimetres and above
15.23.1 : Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.For thickness of tiles 10 mm to 25 mm
10.16.1 : Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.Hot finished welded type tubes
12.50 : Providing and fixing precoated galvanised iron profile sheets (size, shape and pitch of corrugation as approved by Engineer-in-charge) 0.50 mm (+0.05%), total coated thickness with zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns. Sheet should have protective guard film of 25 microns minimum to avoid scratches during transportation and should be supplied in single length upto 12 metre or as desired by Engineer-in-charge. The sheet shall be fixed using self drilling/self tapping screws of size (5.5x55mm) with EPDM seal, complete upto any pitch in horizontal/ vertical or curved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required.Providing and fixing precoated galvanised iron profile sheets (size, shape and pitch of corrugation as approved by Engineer-in-charge) 0.50 mm (+0.05%), total coated thickness with zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns. Sheet should have protective guard film of 25 microns minimum to avoid scratches during transportation and should be supplied in single length upto 12 metre or as desired by Engineer-in-charge. The sheet shall be fixed using self drilling/self tapping screws of size (5.5x55mm) with EPDM seal, complete upto any pitch in horizontal/ vertical or curved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required.
12.48 : Providing & fixing on roof pressed clay tile (Mangalore tile) of 20 mm nominal thickness and of approved size and as per approved pattern on steel frame work complete (steel frame work to be paid separately)Providing & fixing on roof pressed clay tile (Mangalore tile) of 20 mm nominal thickness and of approved size and as per approved pattern on steel frame work complete (steel frame work to be paid separately)
12.49 : Providing & laying on roof pressed clay tile ridge (Mangalore tile) of 20 mm thickness and of approved pattern on steel frame work complete (steel frame work to be paid separately ).Providing & laying on roof pressed clay tile ridge (Mangalore tile) of 20 mm thickness and of approved pattern on steel frame work complete (steel frame work to be paid separately ).
13.62.1 : Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade:Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture .
5.2.2 : Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
5.9.13 : Centering and shuttering including strutting, etc. and removal of form for:Vertical and horizontal fins individually for forming box louvers band, facias and eaves boards
5.22.1 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelMild steel and Medium Tensile steel bars
od17524/2020_2021 : The ceiling surface is to be smoothed with modified mortar to an average thickness of 15 mm. Measurement is calculated as in the previous case. Including cost of materials, labour charges, conveyance of materials to site hire charges of tools etc. complete.
od17525/2020_2021 : The applying two component high build polymer modified cementitions reinstatement mortar Rendroc HB2 preferable with hand using weton wetmethod to make sure that high strength polymer mix covers the reinforcing bar on all sides and cover the acidic concrete. Measurement is calculated as in the previous case. Including cost of materials, labour charges, conveyance of materials tosite hire chargesof tools etc. complete.
od17526/2020_2021 : The cleaned reinforcing bar on the dried bar applying corrotion inhibitant one coat of nitozinc primer care should be taken to seethat the zinc primer coated should make an unbroken continous film on the bars. After cleaning the bar applying one coat of bonding agent Nitobond AR/SBR measuement is calculated as in the previous case.including cost of meterials, labour charges, conveyance of materials to site hire charges of tools etc complete.
od17527/2020_2021 : Chipping and removing old spalling/detective concrete and exposing the detective/corroded reinforcement of the ceiling, joint the additional bar wherever 1/3 diameter of the bar is corroded. Removel of the detective concrete across the bar should be at least 2mm beyond the detective bar so that the reinforcing bar can be cleaned with ribbon, wire brush etc. After cleaning the bar wash with clean water and collect all the spalled/ fallen concrete. Measurement is calculated for whole exposed area. Including cost of materials, labour charges, conveyance of materials to site hire charges of tools etc complete.
od13500/2020_2021 : cLearing and removing grass, small bushes and other dirty matters from open terrace and sunshade of building and disposal of the debris to a safe distant place including labour charges, hire charges etc. complete, as per the direction of departmental officers at site.
od13501/2020_2021 : Engaging carpenter for the repair and rectification of damaged wooden doors and windows
od13502/2020_2021 : Removing blockage from the water closet and"s" or "p" trap connected sewer lines etc. and cleaning the dirty matters to safe distant place and check the pipe line after pouring the waste etc. including all cost and conveyance of materials, all labour charges etc. complete. as per the direction of departmental officers at site.
od13503/2020_2021 : Removing blockage from the bathroom trap and its connecting pipe line and clearing the dirty matters to safe distant place and check the pipe line after pouring the waste etc, cinluding all cost and conveyance of materials, all labour charges etc. complete, as per the direction of departmental officers at site.
od13504/2020_2021 : Removing blocks from manhole of size 60cmx60cm and depth up to 60cm (fill with solid waste from closet line) and clearing the dirty materials into suitable excavated pits toa safe distance place including charges for bamboo splits for clearing block from manhole to main hole connecting line, hire charges for rope buckets and all labour charges and all incidental charges etc. complete as per the direction of departmental officers at site
SIDDIQUE M K
Bidder Name
MUJEEB RAHMAN E P
SIDDIQUE M K
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .