Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.3 LAccepted-AOC S O SH MUKESH MODGIL R O VPO DEHAR TEHSIL SUNDERNAGAR DISTT MANDI H P | ₹4.3 L | L1 | Accepted-AOC Due to L1 |
| 2 | L2₹4.5 L+₹20,063.57 (4.71%)Rejected-Finance V P O DARINI TEHSIL SHAHPUR HIMACHAL PRADESH 176206 | DARINI | KANGRA | HIMACHAL PRADESH | 176206 | ₹4.5 L+₹20,063.57 (4.71%) | L2 | Rejected-Finance Due to L2 |
| 3 | L2₹4.5 L+₹20,063.57 (4.71%)Rejected-Finance A R AND M O ON VARIOUS ROAD IN SECTION NALAGARH 1 UNDER NALAGARH SUB DIVISION SH HIRING OF JCB | ₹4.5 L+₹20,063.57 (4.71%) | L2 | Rejected-Finance Due to L2 |
| 4 | L4₹4.6 L+₹30,971.37 (7.26%)Rejected-Finance HIMACHAL PRADESH HP | MANDI | HIMACHAL PRADESH | 176090 | ₹4.6 L+₹30,971.37 (7.26%) | L4 | Rejected-Finance Due to L4 |
| 5 | L5₹4.6 L+₹34,192.85 (8.02%)Rejected-Finance | ₹4.6 L+₹34,192.85 (8.02%) | L5 | Rejected-Finance Due to L5 |
Tender Value
₹5.7 L
EMD Value
₹11,300
Closing Date
22 Jul 2026, 10:30 amClosed
Executive Engineer
Division No.1, HPPWD Bilaspur
C/O Retaining wall
2026_PWD_139217_6
PW-BLP1-CB-Eproc/26-5543-93 dt 10.7.26
Open Tender
Civil Works - Roads
Percentage
30 days
Bilaspur
Please refer Tender documents.
8 documents required · 8 mandatory
₹350
₹11,300
19 Sept 2026
16 Jul 2026
22 Jul 2026
16 Jul 2026
22 Jul 2026
16 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m (One point five metre) in width or 10 sqm (TenPer Square Metre) on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m,(One point five metre) including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. (Fifty metre) including carriage of materials , within all leads and lifts as per direction of Engineer-in-Charge. The rate includes octori, royality, malkhana, toll tax, Goods Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, leavy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same. | 42.9 | Per Cubic metre | 230 | ₹9,867 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (One cement : Five fine sand : Ten graded stone aggregate 40 mm (Forty milimetre) nominal size) including carriage of materials , within all leads and lifts as per direction of Engineer-in-Charge. The rate includes octori, royality, malkhana, toll tax, Goods Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, leavy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same. | 104.42 | Per Cubic metre | 4,983.85 | ₹5,20,413.62 |
| 3 | Providng weepholes in brick masonary/stone masonry/plain reinforced concrete abutment wing wall, return wall with 100mm (hundred millimetre ) dia PVC pipes extending through the full width of the structures with slope of 1 (v): 20 (H) towards drawing face complete as per drawing and technical specification clauses 614, 709, 1204.3.7. including carriage of materials , within all leads and lifts as per direction of Engineer-in-Charge. The rate includes, octroi, Malkhana , Toll tax , Goods Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, leavy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same. | 36 | Each | 317 | ₹11,412 |
| 4 | Back filling behind abutment wing wall and return wall complete as per drawing and technical specification Clause 1204.3.8 of MORD Specification 1200 including carriage of materials , within all leads and lifts as per direction of Engineer-in-Charge. The rate includes, octroi, Malkhana , Toll tax , Goods Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, leavy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same. | 18.6 | Per Cubic metre | 1,262.25 | ₹23,477.85 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.61 MB
6SBDBarmana565171.pdf
Tender Documents • 3.48 MB
BOQ_206270.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .