| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.7 CrAccepted-AOC | ₹3.7 Cr | L1 | Accepted-AOC Being lowest tenderer |
| 2 | L2₹3.9 Cr+₹19.0 L (5.17%)Rejected-Finance | ₹3.9 Cr+₹19.0 L (5.17%) | L2 | Rejected-Finance Being other than lowest tenderer |
| 3 | L3₹4.0 Cr+₹32.5 L (8.86%)Rejected-Finance | ₹4.0 Cr+₹32.5 L (8.86%) | L3 | Rejected-Finance Being other than lowest tenderer |
| 4 | L4₹4.4 Cr+₹72.2 L (19.7%)Rejected-Finance | ₹4.4 Cr+₹72.2 L (19.7%) | L4 | Rejected-Finance Being other than lowest tenderer |
| 5 | L5₹4.4 Cr+₹73.6 L (20.1%)Rejected-Finance | ₹4.4 Cr+₹73.6 L (20.1%) | L5 | Rejected-Finance Being other than lowest tenderer |
| Sl No | Description | Qty | Unit | M/s Pushpa traders L1 | KHETA RAM RAGHUNATH RAM CONST CO PVT LTD L4 | KARNI BUILDERS L2 | JAGDISH PRASAD & CO L3 | GRID ENGINEERS L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Lump sum price worked out by the contractor for "BUILDING WORKS" as listed in Schedule ‘A’ Part-I representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES B/F from Sl page No. 28(R) | 1 | LUMP SUM | 1,80,32,652 ₹1,80,32,652 Lowest | 2,07,64,872 ₹2,07,64,872 | 1,80,32,652 ₹1,80,32,652 Lowest | 2,00,12,600.76 ₹2,00,12,600.76 | 2,11,00,000 ₹2,11,00,000 |
| 2.00 | Lump sum price worked out by the contractor for "SITE CLEARANCE, EXCAVATION & EARTHWORK" as listed in Schedule ‘A’ Part-II representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES B/F from Sl page No. 30(R) | 1 | LUMP SUM | 17,63,716.2 ₹17,63,716.2 | 14,99,158.7 ₹14,99,158.7 | 12,34,601.34 ₹12,34,601.34 Lowest | 15,85,000 ₹15,85,000 | 16,50,000 ₹16,50,000 |
| 3.00 | Lump sum price worked out by the contractor for "INTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-III representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES B/F from Sl page No. 31 | 1 | LUMP SUM | 5,871.87 ₹5,871.87 | 5,676.14 ₹5,676.14 | 4,501.77 ₹4,501.77 | 4,250 ₹4,250 Lowest | 4,800 ₹4,800 |
| 4.00 | Lump sum price worked out by the contractor for "INTERNAL ELECTRIFICATIONS" as listed in Schedule ‘A’ Part-IV representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES B/F from Sl page No.33 (R) | 1 | LUMP SUM | 39,581.43 ₹39,581.43 | 38,789.8 ₹38,789.8 Lowest | 49,476.79 ₹49,476.79 | 45,000 ₹45,000 | 45,500 ₹45,500 |
| 5.00 | Lump sum price worked out by the contractor for "ROAD & PATH" as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES B/F from Sl page No. 37 | 1 | LUMP SUM | 48,08,222.27 ₹48,08,222.27 Lowest | 57,09,763.95 ₹57,09,763.95 | 66,11,305.62 ₹66,11,305.62 | 58,95,000 ₹58,95,000 | 75,00,000 ₹75,00,000 |
| 6.00 | Lump sum price worked out by the contractor for "SEWAGE DISPOSAL" as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES B/F from Sl page No. 39 | 1 | LUMP SUM | 46,571.26 ₹46,571.26 | 31,668.46 ₹31,668.46 | 31,047.51 ₹31,047.51 Lowest | 35,000 ₹35,000 | 35,000 ₹35,000 |
| 7.00 | Lump sum price worked out by the contractor for "AREA DRAINAGE" as listed in Schedule ‘A’ Part-VII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the MES B/F from Sl page No. 40 | 1 | LUMP SUM | 7,61,647.1 ₹7,61,647.1 Lowest | 9,94,621.52 ₹9,94,621.52 | 9,85,660.96 ₹9,85,660.96 | 8,85,000 ₹8,85,000 | 10,00,000 ₹10,00,000 |
| 8.00 | Lump sum price worked out by the contractor for "FENCING, COMPOUND WALL & GATE" as listed in Schedule ‘A’ Part-VIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Rs. B/F from Sl page No. 43 | 1 | LUMP SUM | 37,66,151.92 ₹37,66,151.92 Lowest | 44,81,720.78 ₹44,81,720.78 | 41,42,767.11 ₹41,42,767.11 | 37,70,000 ₹37,70,000 | 42,50,000 ₹42,50,000 |
| 9.00 | Lump sum price worked out by the contractor for "LIGHTENING PROTECTION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES B/F from Sl page No. 44 | 1 | LUMP SUM | 1,99,786.95 ₹1,99,786.95 Lowest | 2,29,754.99 ₹2,29,754.99 | 2,19,765.65 ₹2,19,765.65 | 2,02,000 ₹2,02,000 | 2,40,000 ₹2,40,000 |
| 10.00 | Lump sum price worked out by the contractor for "EXTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-X representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES B/F from Sl page No. 45 (R) | 1 | LUMP SUM | 5,18,809.1 ₹5,18,809.1 Lowest | 7,52,273.19 ₹7,52,273.19 | 6,22,570.92 ₹6,22,570.92 | 5,25,000 ₹5,25,000 | 7,00,000 ₹7,00,000 |
Tender Value
₹3.7 Cr
EMD Value
₹4.5 L
Closing Date
7 Apr 2026, 6:00 pmClosed
CE Jodhpur Zone
HQ Chief Engineer Jodhpur Zone Jodhpur Opp Military Hospital Rasala Road Jodhpur
PROVISION OF MODERN LPG BLDG ALONWITH CONNECTED SERVICES AT JODHPUR MIL STN
2025_MES_727705_1
800630/E8
Open Tender
Civil Works
Lump-sum
365 days
GE (A) No. 2 Jodhpur
As Per NIT
10 documents required · 10 mandatory
₹2,000
GE (A) No. 2 Jodhpur
₹4.5 L
17 Sept 2026
3 Mar 2026
14 Apr 2026
3 Mar 2026
7 Apr 2026
31 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Lump sum price worked out by the contractor for "BUILDING WORKS" as listed in Schedule ‘A’ Part-I representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES B/F from Sl page No. 28 | 1 | LUMP SUM | 1,86,64,800 | ₹1,86,64,800 |
| 2 | Lump sum price worked out by the contractor for "SITE CLEARANCE, EXCAVATION & EARTHWORK" as listed in Schedule ‘A’ Part-II representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES B/F from Sl page No. 30 | 1 | LUMP SUM | 20,23,509.5 | ₹20,23,509.5 |
| 3 | Lump sum price worked out by the contractor for "INTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-III representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES B/F from Sl page No. 31 | 1 | LUMP SUM | 3,914.58 | ₹3,914.58 |
| 4 | Lump sum price worked out by the contractor for "INTERNAL ELECTRIFICATIONS" as listed in Schedule ‘A’ Part-IV representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES B/F from Sl page No.34 | 1 | LUMP SUM | 4,48,435.17 | ₹4,48,435.17 |
| 5 | Lump sum price worked out by the contractor for "ROAD & PATH" as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES B/F from Sl page No. 37 | 1 | LUMP SUM | 60,10,277.84 | ₹60,10,277.84 |
| 6 | Lump sum price worked out by the contractor for "SEWAGE DISPOSAL" as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES B/F from Sl page No. 39 | 1 | LUMP SUM | 31,047.51 | ₹31,047.51 |
| 7 | Lump sum price worked out by the contractor for "AREA DRAINAGE" as listed in Schedule ‘A’ Part-VII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the MES B/F from Sl page No. 40 | 1 | LUMP SUM | 8,96,055.42 | ₹8,96,055.42 |
| 8 | Lump sum price worked out by the contractor for "FENCING, COMPOUND WALL & GATE" as listed in Schedule ‘A’ Part-VIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Rs. B/F from Sl page No. 43 | 1 | LUMP SUM | 37,66,151.92 | ₹37,66,151.92 |
| 9 | Lump sum price worked out by the contractor for "LIGHTENING PROTECTION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES B/F from Sl page No. 44 | 1 | LUMP SUM | 1,99,786.95 | ₹1,99,786.95 |
| 10 | Lump sum price worked out by the contractor for "EXTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-X representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES B/F from Sl page No. 45 | 1 | LUMP SUM | 4,57,969.1 | ₹4,57,969.1 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.40 MB
800630Tender03032026.pdf
Tender Documents • 5.34 MB
BOQ_845775.xls
BOQ • 0.31 MB
Drg8006302.pdf
Additional Documents • 10.85 MB
CorrNo09800630.pdf
PDF • 7.25 MB
IMG_0001.pdf
PDF • 0.16 MB
CorrNo08.pdf
PDF • 14.70 MB
Date800630.pdf
PDF • 0.18 MB
800630CorNo07.pdf
PDF • 0.08 MB
corrgno06800630.pdf
PDF • 0.13 MB
corrgno05800630.pdf
PDF • 0.38 MB
Corrigendum_No_04_date_latest_23_04_26_Page_236.pdf
PDF • 0.08 MB
800630CorrNo03.pdf
PDF • 0.07 MB
IMG_0007.pdf
PDF • 0.07 MB
corrgno1800630.pdf
PDF • 0.12 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .