| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹9.4 CrAdmitted-Finance | -2.11% | ₹9.4 Cr | L1 | Admitted-Finance |
| 2 | Rejected-Technical | - | - | - | Rejected-Technical Technical Disqualified |
| 3 | Rejected-Technical | - | - | - | Rejected-Technical Technical Disqualified |
Tender Value
₹9.8 Cr
EMD Value
₹19.6 L
Closing Date
13 Aug 2026, 6:00 pmClosed
Commissioner,Nagar Parishad Bundi
Nagar Parishad Bundi,Rajasthan
Construction of jogging tracks, open gyms, boundary walls, etc., in various parks, including Smriti Kunj and Mahakaleshwar Park (23 small parks), under Budget Announcement No. 32.34.00/2026-27.
2026_DLB_579211_1
NPB/Nirman/2026-27/4982 dated 28/07/2026
Open Tender
Civil Works
Percentage
Nagar Parishad Bundi
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,500
Commissioner, Nagar Parishad
₹19.6 L
Yes
Nagar Parishad Bundi,Rajasthan
11 Sept 2026
30 Jul 2026
18 Aug 2026
30 Jul 2026
13 Aug 2026
30 Jul 2026
3 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of existing structures like culverts, bridges, retaining walls, CC road and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 50 metres as directed by Engineer. Rubble stone masonry in cement mortar. | 1,602.53 | CUM | 386 | ₹6,18,576.58 |
| 2 | Cement Concrete Grade M-15 and above and PCC blocks | 432.36 | CUM | 678 | ₹2,93,140.08 |
| 3 | Carriage of Materials by mechanical transport including loading, unloading and stacking ::Stone, boulders, gravelly material
(LEAD UPTO 3 KM) | 1,991.67 | CUM | 197.03 | ₹3,92,418.74 |
| 4 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level.In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc. | 602.44 | CUM | 229.5 | ₹1,38,259.98 |
| 5 | Providing and laying in position cement concrete of specified gradeexcluding the cost of centring and shuttering - All work upto plinthlevel :1:3:6 (1 Cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size). | 177.39 | CUM | 5,000 | ₹8,86,950 |
| 6 | Centring and shuttering with plywood or steel sheet upto two stories or height upto 7.5 metre above plinth level including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete. | 198 | SQM | 236.5 | ₹46,827 |
| 7 | Centring and shuttering with plywood or steel sheet upto two stories or height upto 7.5 metre above plinth level including strutting, propping etc. and removal of form for : Columns, Pillars, Piers, Abutments, Posts and Struts. | 118.8 | SQM | 375 | ₹44,550 |
| 8 | Centring and shuttering with plywood or steel sheet upto two stories or height upto 7.5 metre above plinth level including strutting, propping etc. and removal of form for : Lintels, beams, plinth beams, girders, bressumers and cantilevers. | 924.77 | SQM | 426 | ₹3,93,952.02 |
| 9 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - All work upto plinth level :1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20
mm nominal size) | 222.47 | CUM | 6,340 | ₹14,10,459.8 |
| 10 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. upto two stories excluding cost of centring, shuttering, finishing and reinforcement : including Providing /mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e. 125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortar. | 13.42 | CUM | 7,380 | ₹99,039.6 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.34 MB
Document.pdf
Tender Documents • 16.57 MB
BOQ_1029280.xls
BOQ • 0.58 MB
Other_documents.pdf
Other Document • 26.93 MB
Corrigendum_4982.pdf
PDF • 0.11 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .