Tender Value
₹1.8 Cr
EMD Value
₹1.8 L
Closing Date
6 Aug 2026, 6:00 pm
EXECUTIVE ENGINEER SALINITY CONTROL DIVISION Jam-Khambhalia
Construction of three New Check Dams Near village At Ahir Sihan, Kota and Kandorna in Taluka Jam-Khambhalia, Dist. Devbhumi Dwarka River near village Kandorna.
324284
Tender Notice No. 5 of 2026-27
Open
Civil - All
Works
Devbhumi Dwarka
4 documents required · 4 mandatory
₹3,600
Executive engineer, salinity control division jam-khambhaliya
₹1.8 L
17 Jul 2026
17 Jul 2026
17 Jul 2026
6 Aug 2026
17 Jul 2026
BILL OF QUANTITIES (BOQ)
BILL OF QUANTITIES
1.0 The bill of Quantities shall be read in conjunction with the Instructions to
Bidder, Conditions of Contract, Technical Specifications and Drawings.
2.0 The quantities given in the Bill of Quantities are estimated and
provisional, and are given to provide a common basis for bidding. The
basis of payment will be the actual quantities of work ordered and carried
out, as measured by the Contractor and verified by the Engineer and
valued at the rates and prices tendered in the priced Bill of Quantities,
where applicable, and otherwise at such rates and prices as the Engineer
may fix within the terms of the Contract.
3.0 The rates and prices tendered in the priced Bill of Quantities shall, except
in so far as it is otherwise provided under the Contract, include all
constructional plant, layout, supervision, materials, erection,
maintenance, insurance, profit, taxes and duties, together with all general
risks, liabilities and obligations set out or implied in the Contract.
4.0 The rates and prices shall be quoted entirely in Indian Currency.
5.0 A rate or prices shall be entered against each item in the Bill Quantities,
whether quantities are stated or not. The cost of Items against which
Contractor has failed to enter a rate or price shall be deemed to be covered
by other rates and prices entered in the Bill of Quantities (in case of Item
rate contract).
6.0 The whole cost of complying with the provisions of the Contract shall be
included in the items provided in the priced Bill of Quantities, and where
no Items are provided the cost shall be deemed to be distributed among
the rates and prices entered for the related items of Work.
7.0 General direction and descriptions of work and materials are not
necessarily repeated or summarized in the Bill of Quantities. References
to the relevant sections of the contract documentation shall be made
before entering rates or prices against each item in the Bill of Quantities.
8.0 The method of completed work of payment shall be in accordance with
the specification for Road and Bridge works. For building works
specifications for building are to be followed.
9.0 Errors will be corrected by the Employer for any arithmetic errors
pursuant to Clause 29 of the Instructions to Bidder.
10.0 Rock is defined as all materials which, in the opinion of the Engineer,
required blasting, or the use of metal wedges and sledgehammers, or the
use of compressed air drilling for its removal, and which cannot be
extracted by ripping with a tractor of at least 150 kw with a single rear
mounted heavy duty ripper.
BILL OF QUANTITIES (BOQ)
(A) Percentage Rate Tender (Up to INR 10 Cr.)
Name of Work - Construction of three New Check Dams Near village at Ahir
Sihan, Kota and Kandorna in Taluka Jam-Khambhalia,District Devbhumi
Item Quantity Total
Description of Item Quantity Quantity Unit Rate (₹) Amount (₹)
No. (Ahir Quantity
(Kota) (Kandorna)
Excavation in all sorts of
strata and formations
including depositing
unuseful excavated
material as and where
directed, sorting and
stacking useful materials
up to 200 m lead, all lifts
and dewatering, etc.
complete. (A) In
Overburden / Hard
Same as Item No. 1(a),
but (B) In Soft Rock
Same as Item No. 1(a),
but (C) In Hard Rock
Providing and laying in
position cement concrete
using cement, sand and
crushed metal coarse
aggregate by mass and
machine mixing for
PCC/RCC, including
necessary formwork,
compaction by vibrator,
curing, all leads and lifts,
etc. complete, excluding
cost of reinforcement
steel, for body wall,
apron, training wall, side
wall, splay wall, key wall
and cut-off wall, etc.
Nominal Mix Concrete
1:2:4 with MSA 40 mm
Providing and laying
controlled cement
2(b) concrete as specified 889 1,450 1,146 3,485 Cum. 3,423.00
above. Concrete Grade
M-15 with MSA 40 mm
Providing, cutting,
bending, binding and
fixing in position, as per
reinforcement bars for
RCC works and anchor
bars, including cost of
Item Quantity Total
Description of Item Quantity Quantity Unit Rate (₹) Amount (₹)
No. (Ahir Quantity
(Kota) (Kandorna)
black annealed 16 to
BWG M.S. binding wire,
all leads and lifts, etc.
complete. Fe-500 Grade
Backfilling with
appropriate excavated
material behind
structures or refilling
trenches with useful
4 excavated material, 57 135 150 342 Cum. 84.00
including watering,
consolidation, with all
leads and lifts, etc.
Providing and laying
stone launching apron
using 50% stones
weighing not less than
5 kg or as specified, 504 416 304 1,224 Cum. 765.00
including hand packing
and filling interstices
with spalls, with all leads
and lifts, etc. complete.
Providing and laying dry
rubble stone pitching
without base inverted
filter/murrum bedding Sq
and header stone, mt.
including hand packing,
trimming and dressing of
slopes, etc. complete.
Providing and laying
graded filters of sand,
gravel/metal and
oversized metal of size
100 to 150 mm behind
retaining walls and wing
walls, as directed and as
per approved drawings,
with all leads and lifts,
Providing and fixing in
position 100/110 mm
dia PVC pipes as weep
holes in retaining walls,
abutments, etc. complete.
Providing and fixing PVC
water stops as per
9 standard drawings and 43 41 21 105 Rmt. 596.00
specifications. 300 mm
wide PVC water stop
Providing and fixing in
position white marble
plate of size 45 × 45 ×
1.8 cm, including
engraving of letters as
per drawings or as
Item Quantity Total
Description of Item Quantity Quantity Unit Rate (₹) Amount (₹)
No. (Ahir Quantity
(Kota) (Kandorna)
directed, etc. complete.
Jungle clearance of
specified category and
bushes for canal/dam
works, including
depositing cleared Sq
materials as directed, mt.
excluding trees having
girth above 0.50 m. Up to
2 years old – Heavy
Jungle clearance of
specified category and
bushes for canal/dam
works, including
depositing cleared Sq
materials as directed, Mt.
excluding trees having
girth above 0.50 m. More
than 2 years old –
Heavy Dense Jungle
Dismantling cement
concrete foundation or
flooring, including
sorting and stacking
useful and unuseful
materials within a lead of
200 m, as directed, etc.
SUB-TOTAL ₹1,81,98,129.56
Care and diversion of
river/creek, including
required dewatering
during construction of
dam and allied works, as
prescribed and directed,
etc. complete. Rate: 1%
of Estimated Cost
GRAND TOTAL ₹1,83,80,110.86
GRAND TOTAL ₹1,83,80,110.86
I am/we are willing to carry out the work at % below/above percent
(Should be written in figures and words) of the estimated rates mentioned above.
Amount of My/Our tender works out as under :-
Estimated Amount Put to Tender Estimated Amount Put to Tender
Deduct % Below Add % Above
in words in words
(B) For Item Rate Tender (For above INR 10 Cr.) :-
Item Description of Item (with Quantity Unit Rate Amount
No brief specification and
reference to book of In In
specifications) figures Words
(A) Total Tendered Amount
(B) Rebate on above tendered amount (if any) % (in figure) .........................................(in
(C)Net Tendered Amount (A-B) (in figure) ………………………………
1. The Contractor shall exhibit a board with detailed specification and details of
work as directed by the Engineer-In-Charge for which no extra payment shall be
2. The labour cess will be deducted as per prevailing rules i.e.1% of the work done.
3. GST and Income tax TDS will be deducted at a source while making payments of bills
4. In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as
per Govt.G.R.:PRC-10/2017CementConsumption/16/CDate:11/05/2017as stated
in S.O.R. therefore in R.C.C. items where there is a change as per actual mix design
the cost of difference of cement consumption have been deducted from the rate of
original item at the rate of input rate mentioned in all the tender.
Executive Engineer,
Salinity Control Division,
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Final SBD ahir sihan kota with drawing.pdf
Schedule b 3 checkdam.pdf
Tender Notice No.5.pdf
Download all tender documents and submit your bid