Tender Value
₹25 L
EMD Value
₹50,000
Closing Date
15 Sept 2026, 12:00 pm
BDO JOYA
BDO JOYA
GRAM BUDHANPUR MAIN ZILA SHIKSHA AND PRAKSHISHAN SANSTHAN MAIN BHIJNALYA KA NIRMAN KARYE
2026_RDUP_1179912_1
913
Open Tender
Civil Construction Goods
Multi-stage
GRAM BUDHANPUR MAIN ZILA SHIKSHA AND PRAKSHISHAN S
Please refer Tender documents.
3 documents required · 3 mandatory
₹4,425
Yes
BDO JOYA
₹50,000
Yes
26 Aug 2026
26 Aug 2026
15 Sept 2026
26 Aug 2026
15 Sept 2026
27 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width within a lead of 50 m. All kinds of soil. as per DSR item no- 2.8.1 | 51.48 | Cum | 193.11 | ₹9,941.3 |
| 2 | P/L in 1:5:10 with cement, coarse sand & 40mm guage stone aggregate in base including supply of all materials labour & T&P etc. required for proper completion of the work. As per DSR item no. - 4.1.10 | 7.46 | Cum | 4,835.95 | ₹36,076.19 |
| 3 | M-150 class Brick Work in 1:6 cement, C/sand mortar in foundation and plinth. As per DSR item no. - 6.1.2 | 11.97 | Cum | 5,291.2 | ₹63,335.66 |
| 4 | R.C.C. work in 1:1.5:3 Cement, Coarse sand & stone aggregate 20 mm nominal size i/c columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : Above Plinth Lvl asDSR item no-5.2.2 | 14.48 | Cum | 8,051.47 | ₹1,16,585.29 |
| 5 | R.C.C.work in 1:2:4 with cement, approved C/Sand & 20 mm guage stone grit in Lintel Sunshade etc. centering shutering etc. As per DSR item no. - 4.1.3 | 5.57 | Cum | 5,844.82 | ₹32,555.65 |
| 6 | M-150 class Brick Work in 1:6 cement, C/sand mortar in superstructure above plinth level. As per DSR item no. - 6.4.2 | 34.2 | Cum | 6,755.42 | ₹2,31,035.36 |
| 7 | Excavating, supplying, stacking and filling of local earth (including royalty) by mechanical transport upto a lead of 5 km also including ramming and watering of the earth in layers not exceeding 20 cm in foundation trenches, plinth, sides of foundation etc. complete for all lift as per DSR item no. - 2.25(a) | 38.61 | Cum | 519.68 | ₹20,064.84 |
| 8 | 12 mm thick cement plaster of mix 1:4 ( 1 cement & 4 course sand ) per IS 13.4.1 | 34.33 | sqm | 265.11 | ₹9,101.23 |
| 9 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III)derived from natural sources : 3 graded stone aggregate 20 mm nominal sizederived from natural sources). Above Plinth Lvl as SI No-5.3 | 22.03 | Cum | 8,535.58 | ₹1,88,038.83 |
| 10 | Centering and shuttering including strutting, propping etc.and removal of form.Beam / Band as per SI- 5.9.5 | 235.43 | sqm | 546.31 | ₹1,28,617.76 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.21 MB
BOQ_2218699.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].