Loading…
Loading…
Tender Value
₹96.5 L
EMD Value
₹96,520
Closing Date
17 Aug 2026, 5:00 pmClosed
Chief Engineer/Civil/Thermal/TGGENCO/VS
Room No 253, A Block , vidyut Soudha, Hyderabad
TGGENCO-BTPS(4x270MW)- Construction of Compound walls for School, Hospital and storage shed for gas godown in Township area at Bhadradri Thermal Power Station, Manuguru, Bhadradri Kothagudem Dist.
722963
e-15/CE/C/Thermal/TGGENCO/2026-27
OPEN
Civil Works
BHADRADRI KOTHAGUDEM, TELANGANA
7 documents required · 7 mandatory
₹3,417
₹96,520
1 Aug 2026
1 Aug 2026
1 Aug 2026
Earthwork excavation for foundations of Compound wall by mechanical means as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches and basement with excavated suitable material and compacting as per Technical Specification of 304 MORTH including all labour charges, with all leads and lifts and incidental charges etc., complete for finished item of work and as directed by EIC
Supply and filling of sand in foundations of Compound wall as per drawing and technical specification Clause 304 MORTH including cost and conveyance of Sand ,all labour for filling, watering and tamping , and all leads and lifts etc., complete for finished Item of work and as directed by the EIC
Laying PCC(1:4:8) for leveling course in foundations of Compound wall using 40mm size HBG metal and fine aggregate(sand), cement including cost and conveyance of all materials including mechanical mixing, placing, compacting, curing , all labour charges, with all leads and lifts and incidental charges etc., complete for finished item of work and as directed by the Engineer in charge.
RCC M- 25 Nominal mix for FOOTINGS using 20mm & 12mm size graded HBG metal including cost and conveyance of all materials to site,centering, shuttering,all operational, incidental and labour charges such as machine mixing, laying concrete, curing and , complete but excluding cost of steel and its fabrication charges for finished item of work and as directed by EIC.
RCC M- 25 Nominal mix for PEDESTALS using 20mm & 12mm size graded HBG metal including cost and conveyance of all materials to site,centering, shuttering,all operational, incidental and labour charges such as machine mixing, laying concrete, curing and .,complete but excluding cost of steel and its fabrication charges for finished item of work and as directed by EIC
RCC M- 25 Nominal mix for COLUMNS using 20mm & 12mm size graded HBG metal including cost and conveyance of all materials to site,centering, shuttering,all operational, incidental and labour charges such as machine mixing, laying concrete, curing, complete but excluding cost of steel and its fabrication charges for finished item of work and as directed by EIC
RCC M- 25 Nominal mix for PLINTH BEAMS using 20mm & 12mm size graded HBG metal including cost and conveyance of all materials to site,centering, shuttering,all operational, incidental and labour charges such as machine mixing, laying concrete, curing , complete but excluding cost of steel and its fabrication charges for finished item of work and as directed by EIC
Providing High yield strength Deformed(HYSD)/Thermo Mechanically Treated (TMT)/Mild steel (MS) steel bars (Fe 415/Fe 500) grade as per IS 1786-1979) of different diameters for all RCC works etc., including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap splicing with binding wire of 18SWG, forming grills of reinforcement work as per approved drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars, cost of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying and complete for finished item of work as directed by the Engineer-in-charge.
Brick Masonry in CM(1:5) for Compound wall using well cured FLY ASH BRICKS of size 225 mmx 110 mm x75 mm including cost and conveyance of all materials, scaffolding, mixing, curing, all labour charges with all leads and lifts and incidental charges and complete for finished item of work and as directed by the EIC
Plastering with cement mortar in 2 coats, 20 mm thick for brick walls, base coat in CM (1:5), 16 mm thick and top coat in CM (1:3), 4mm thick and sponge finishing over rabit wire mesh, including cost and conveyance of all materials, scaffolding, mixing, curing, all labour charges with all leads and lifts and incidental charges,complete for finished item of work and as directed by the Engineer in charge.
Painting to New walls with 2 coats of Exterior emulsion weather proof paint of approved brand and shade over a base coat of appropriate primer of approved brand, making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost & conveyance of all materials to work site, all operational, incidental, labour charges, EPF & ESI contributions, complete for finished item of work and as directed by the Engineer-in-charge.
Supply, Fabrication & fixing of MS Gate of approved size & design made of Structural steel i.e. MS Square bars and MS channels etc., including Cost & conveyence of all materials, fabrication , all labour charges , painting with two coats of synthetic enamel paint over one coat red oxide primer after removing all loose particles and dirt etc, including hire & operation charges, consumables etc ,all leads & lifts, complete for finshed item of work.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1.Title.docx
TENDER_DOCUMENT • 0.68 MB
2.Index.doc
TENDER_DOCUMENT • 0.04 MB
3. Specification PQB.doc
TENDER_DOCUMENT • 0.63 MB
BOQ-final.xls
TENDER_DOCUMENT • 0.53 MB
drawing.pdf
TENDER_DOCUMENT • 0.34 MB
NIT.docx
TENDER_DOCUMENT • 0.71 MB
Price bid.doc
TENDER_DOCUMENT • 0.71 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .